First Notice | 9/4/2009 | 9/4/2009 | 8/30/2013 | | DONE |
Dave Hannah
|
|
|
This permit finaled on the web by Cecyle Brock
|
BLD-Final | 9/4/2009 | 9/4/2009 | 9/4/2009 | P | PASS |
Dave Hannah
|
|
|
Joe Phone #: ###-####
|
DOC - Permit Finaled | 9/4/2009 | 9/4/2009 | 9/4/2009 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 8/28/2009 | 8/28/2009 | 8/28/2009 | P | PART |
Dave Hannah
|
|
|
Joe Phone #: ###-#### ok but I need letter from mti
|
BLD-Final | 8/27/2009 | 8/28/2009 | 8/28/2009 | A | CANC |
Dave Hannah
|
|
|
Joe Phone #: ###-####
|
BLD-Final | 8/5/2009 | 8/6/2009 | 8/6/2009 | A | NR |
Dave Hannah
|
|
|
joe Phone #: ###-#### rained out
|
BLD-Framing/Rough-in | 7/30/2009 | 7/31/2009 | 7/31/2009 | A | PART |
Tony Young
|
|
|
Joe Phone #: ###-#### seismic ties and strapping,, wall ok in mobile unit pending elec r/in,, all as noted on plans
|
BLD-Other | 7/28/2009 | 7/28/2009 | 7/28/2009 | P | PASS |
Tom Arcoraci
|
|
|
wip ok
|
BLD-Final | 7/28/2009 | 7/28/2009 | 7/28/2009 | P | NR |
Tom Arcoraci
|
|
|
joe - 1 if possible please Phone #: ###-####
|
BLD-Framing/Rough-in | 7/24/2009 | 7/24/2009 | 7/24/2009 | P | PASS |
Dave Hannah
|
|
|
Joe Phone #: ###-#### ok per David Hannah to change inspection for today. this is for the rest of area 5 ok to cover
|
BLD-Framing/Rough-in | 7/23/2009 | 7/23/2009 | 7/23/2009 | P | PART |
Dave Hannah
|
|
|
Joe-around 2 if possible Phone #: ###-#### north half of east side of sec 5 ok to cover
|
BLD-Framing/Rough-in | 7/21/2009 | 7/22/2009 | 7/22/2009 | A | PART |
Dave Hannah
|
|
|
joe - 9:00 please Phone #: ###-#### ok to cover roof area 9
|
BLD-Framing/Rough-in | 7/15/2009 | 7/16/2009 | 7/16/2009 | A | PART |
Dave Hannah
|
|
|
for north and south ends of the building roof area #5//Joe ###-####//request 8am ok to cover
|
BLD-Framing/Rough-in | 7/13/2009 | 7/14/2009 | 7/15/2009 | A | PART |
Dave Hannah
|
|
|
joe Phone #: ###-#### north end of top roof ok to cover
|
BLD-Framing/Rough-in | 7/10/2009 | 7/10/2009 | 7/14/2009 | P | PART |
Dave Hannah
|
|
|
Joe around 1 is possible Phone #: ###-#### okto cover east side of main roof
|
BLD-Framing/Rough-in | 7/1/2009 | 7/1/2009 | 7/2/2009 | P | PART |
Dave Hannah
|
|
|
joe - as soon as possible Phone #: ###-#### roof area 2 ok to cover
|
BLD-Framing/Rough-in | 6/24/2009 | 6/25/2009 | 6/25/2009 | A | PART |
Dave Hannah
|
|
|
joe -8:00 if possible, please Phone #: ###-#### roof areas 1 and 3 \seismic connections ok ok to insulate and sheet
|
Issue PAID IN FULL permit | | | 6/9/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Inspection Record Card- Bld | | | 6/8/2009 | | DONE |
|
|
|
|
Telephone call | | | 6/8/2009 | | DONE |
|
|
|
left vm for cecyle brock at ###-#### - permit ready and fees given
|
Plan assigned to (CDM) | 2/25/2009 | 2/25/2009 | 2/27/2009 | | PASS |
Carl D Madsen
|
|
|
2/27/2009 13:36:25 CDM - activity updated through activity BLDA022 from case BLD09-00227.
|
Routing - PLAN CHECK | 2/25/2009 | | 2/27/2009 | | PASS |
Carl D Madsen
|
|
|
Carl Madsen
Deferred submittals are required for the sun control devices prior to installation 2-27-09 CDM
|
Case Summary (BLD) | | | 2/27/2009 | | DONE |
|
|
|
|
1st review completed | | | 2/27/2009 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/27/2009 | | |
|
|
|
|
Inspection Record Card- Bld | | | 2/27/2009 | | DONE |
|
|
|
|
Telephone call | | | 2/27/2009 | | DONE |
|
|
|
t/c w don hutchinson at ###-#### - permit ready and fees given - also need gc name and rce#
|
Permit Ready to Issue | | | 2/27/2009 | | DONE |
|
|
|
|
Application received | | 2/25/2009 | 2/25/2009 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/25/2009 | | DONE |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/25/2009 | | DONE |
Barbara Stitt
|
|
|
|