BLD-Final | 2/10/2010 | 2/11/2010 | 2/11/2010 | P | PASS |
Jim Sly
|
|
|
OK for perm occ.
|
DOC - Permit Finaled | 2/11/2010 | 2/11/2010 | 2/11/2010 | P | PASS |
Jim Sly
|
|
|
|
PubWorks Occupancy Approval | 2/11/2010 | 2/11/2010 | 2/11/2010 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 2/10/2010 | 2/10/2010 | 2/10/2010 | P | CANC |
Jim Sly
|
|
|
Re-sched..
|
BLD-Final | 2/10/2010 | 2/10/2010 | 2/10/2010 | A | CANC |
Jim Sly
|
|
|
Re-sched....
|
BLD-Final | 2/8/2010 | 2/8/2010 | 2/9/2010 | P | DEFR |
Jim Sly
|
|
|
need to close out grading permit, finaled addition Bld09-00267 on 2/5/10 Called Pat at Boise City. Had her add an inspection for Public Works final, prior to performing a Structural final.
|
Plan resubmittals received | | | 8/11/2009 | | |
Tisha Gallop
|
|
|
received letter addressed to Brian Murphy, Storm water report and five copies if sheets SD-4 & SD-5; ok to submit as deferred resubmittals per Brian Murphy, plans taken to him.
|
BLD-Aging Inspection | 7/20/2009 | 7/20/2009 | 7/20/2009 | | PASS |
Tom Arcoraci
|
|
|
|
Plan resubmittals received | | | 5/11/2009 | | DONE |
|
|
|
Received 1 letter and 3 copies of sheets SD-4,SD-5 taken to Brian M. ( this plan had been issued on 4-20-09 dld)
|
Issue PAID IN FULL permit | | | 4/20/2009 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 4/16/2009 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 4/16/2009 | | DONE |
Barbara Stitt
|
|
|
Called Barry Simple @ ###-#### and told him permit is ready, fees due and need RP information before issue///4-16-09 @ 9:35am BAS
|
Routing - FRONT DESK | 3/17/2009 | | 4/15/2009 | | PASS |
Barbara Stitt
|
|
|
BARB-Waiting for ACHD Commission hearing on 3-25-09 decision before any permits can be issued--Approved Per Sue Cummings
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/15/2009 | | DONE |
Barbara Stitt
|
|
|
|
Routing - PLANNING | 3/11/2009 | | 3/17/2009 | | PASS |
Sue Cummings
|
|
|
CUP09-00006-Sue Cummings-Waiting for ACHD Commission hearing on 3-25-09 before any permits can be issued. ACHD OK'ed the plan. Good to go on issuing permits now SAC
|
Routing PW Drainage | 3/16/2009 | | 3/17/2009 | | PASS |
Brian Murphy
|
|
|
Brian Murphy
|
Routing - Erosion and Sediment | 3/17/2009 | | 3/17/2009 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions. ESC09-00087
|
Routing - PUBLIC WORKS | 3/17/2009 | | 3/17/2009 | | PASS |
Beverly Hall
|
|
|
|
Routing - FIRE | 3/12/2009 | | 3/16/2009 | | PASS |
Scott Arellano
|
|
|
No seperate review comments.
|
1st review completed | | | 3/16/2009 | | FAIL |
Barbara Stitt
|
|
|
Failed Public Works, Erosion & Soil Control, Planning
|
Routing - PLUMBING | 3/10/2009 | | 3/11/2009 | | PASS |
Bill VanDegrift
|
|
|
all piping under building must be of material approved for inside the building, installed by a licensed plumbing contractor.
|
Routing - PLANNING | 3/11/2009 | | 3/11/2009 | | PASS |
Andrea Tuning
|
|
|
Approved per DRH09-00014 and CZC09-00030 - Andrea Tuning
|
Routing - Erosion and Sediment | 3/9/2009 | | 3/10/2009 | | FAIL |
Steven Webb
|
|
|
Did not receive the ESC plan narrative. Applicant will provide two copies as a re-submittal. ESC09-00087
|
Routing - PUBLIC WORKS | 3/4/2009 | | 3/9/2009 | | FAIL |
Louise Waldorf
|
|
|
Refer to site drainage
|
Routing PW Sewer Rating | 3/9/2009 | | 3/9/2009 | | PASS |
Louise Waldorf
|
|
|
|
Routing PW Solid Waste | 3/9/2009 | | 3/9/2009 | | PASS |
Peter J. McCullough
|
|
|
|
Plan resubmittals received | | | 3/9/2009 | | |
Barbara Stitt
|
|
|
Received 5 copies of sheets SD-4, SD-5 (site grading & drainage plan & details) and inserted into plans by Ben with the architects office and then taken back to ESC inbox///3-9-09 @ 2:15pm BAS
|
Routing PW Street Lights | 3/6/2009 | | 3/6/2009 | | PASS |
Hank Alarcon
|
|
|
|
Routing PW Drainage | 3/4/2009 | | 3/6/2009 | | FAIL |
Brian Murphy
|
|
|
NEED TO REVISE SEEPAGE BED DIM A.
|
Routing - PLANNING Land Div | 3/2/2009 | | 3/4/2009 | | PASS |
Todd Tucker
|
|
|
Parcel is greater than five acres in size.
|
Application received | | 3/2/2009 | 3/2/2009 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/2/2009 | | DONE |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/2/2009 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (B_S) Barb | 4/15/2009 | | 3/2/2009 | | DONE |
Barbara Stitt
|
|
|
|
First Notice | 2/11/2010 | 2/11/2010 | | | |
Jim Sly
|
|
|
|