Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD09-00245
StatusFinaled
Name ESI
Site Address 8200 W FAIRVIEW AVE
Project NameWinCo Food Store #06
Customer Number 
ePlanReviewNo
Description
Grading & drainage-reconstruction of parking lot and storm drainage facilities to accomadate the proposed building expansion--Parking Lot-Grading permit to grub, clean, excavate, grade, import and compact site earth materials in preparation for the future construction of a building. To install curb, gutter and paving in accordance with the grading and drainage plans approved by the public works department. Related site utilitites included in this permit. NO CONSTRUCTION IS ALLOWED UNDER THIS PERMIT. Refernce DRH09-00014 & CUP09-00006///3-2-09 BAS
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/10/20102/11/20102/11/2010PPASS
DetailsJim Sly
OK for perm occ.
DOC - Permit Finaled2/11/20102/11/20102/11/2010PPASS
DetailsJim Sly
PubWorks Occupancy Approval2/11/20102/11/20102/11/2010 DONE
DetailsTiffany Lowery
BLD-Final2/10/20102/10/20102/10/2010PCANC
DetailsJim Sly
Re-sched..
BLD-Final2/10/20102/10/20102/10/2010ACANC
DetailsJim Sly
Re-sched....
BLD-Final2/8/20102/8/20102/9/2010PDEFR
DetailsJim Sly
need to close out grading permit, finaled addition Bld09-00267 on 2/5/10 Called Pat at Boise City. Had her add an inspection for Public Works final, prior to performing a Structural final.
Plan resubmittals received  8/11/2009  
DetailsTisha Gallop
received letter addressed to Brian Murphy, Storm water report and five copies if sheets SD-4 & SD-5; ok to submit as deferred resubmittals per Brian Murphy, plans taken to him.
BLD-Aging Inspection7/20/20097/20/20097/20/2009 PASS
DetailsTom Arcoraci
Plan resubmittals received  5/11/2009 DONE
Received 1 letter and 3 copies of sheets SD-4,SD-5 taken to Brian M. ( this plan had been issued on 4-20-09 dld)
Issue PAID IN FULL permit  4/20/2009 DONE
DetailsTisha Gallop
Permit Ready to Issue  4/16/2009 DONE
DetailsBarbara Stitt
Telephone call  4/16/2009 DONE
DetailsBarbara Stitt
Called Barry Simple @ ###-#### and told him permit is ready, fees due and need RP information before issue///4-16-09 @ 9:35am BAS
Routing - FRONT DESK3/17/2009 4/15/2009 PASS
DetailsBarbara Stitt
BARB-Waiting for ACHD Commission hearing on 3-25-09 decision before any permits can be issued--Approved Per Sue Cummings
PLANS/APPL TAKEN TO FRONT DESK  4/15/2009 DONE
DetailsBarbara Stitt
Routing - PLANNING3/11/2009 3/17/2009 PASS
DetailsSue Cummings
CUP09-00006-Sue Cummings-Waiting for ACHD Commission hearing on 3-25-09 before any permits can be issued. ACHD OK'ed the plan. Good to go on issuing permits now SAC
Routing PW Drainage3/16/2009 3/17/2009 PASS
DetailsBrian Murphy
Brian Murphy
Routing - Erosion and Sediment3/17/2009 3/17/2009 PASS
DetailsSteven Webb
ESC plan approved with attached conditions. ESC09-00087
Routing - PUBLIC WORKS3/17/2009 3/17/2009 PASS
DetailsBeverly Hall
Routing - FIRE3/12/2009 3/16/2009 PASS
DetailsScott Arellano
No seperate review comments.
1st review completed  3/16/2009 FAIL
DetailsBarbara Stitt
Failed Public Works, Erosion & Soil Control, Planning
Routing - PLUMBING3/10/2009 3/11/2009 PASS
DetailsBill VanDegrift
all piping under building must be of material approved for inside the building, installed by a licensed plumbing contractor.
Routing - PLANNING3/11/2009 3/11/2009 PASS
DetailsAndrea Tuning
Approved per DRH09-00014 and CZC09-00030 - Andrea Tuning
Routing - Erosion and Sediment3/9/2009 3/10/2009 FAIL
DetailsSteven Webb
Did not receive the ESC plan narrative. Applicant will provide two copies as a re-submittal. ESC09-00087
Routing - PUBLIC WORKS3/4/2009 3/9/2009 FAIL
DetailsLouise Waldorf
Refer to site drainage
Routing PW Sewer Rating3/9/2009 3/9/2009 PASS
DetailsLouise Waldorf
Routing PW Solid Waste3/9/2009 3/9/2009 PASS
DetailsPeter J. McCullough
Plan resubmittals received  3/9/2009  
DetailsBarbara Stitt
Received 5 copies of sheets SD-4, SD-5 (site grading & drainage plan & details) and inserted into plans by Ben with the architects office and then taken back to ESC inbox///3-9-09 @ 2:15pm BAS
Routing PW Street Lights3/6/2009 3/6/2009 PASS
DetailsHank Alarcon
Routing PW Drainage3/4/2009 3/6/2009 FAIL
DetailsBrian Murphy
NEED TO REVISE SEEPAGE BED DIM A.
Routing - PLANNING Land Div3/2/2009 3/4/2009 PASS
DetailsTodd Tucker
Parcel is greater than five acres in size.
Application received 3/2/20093/2/2009 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  3/2/2009 DONE
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  3/2/2009 DONE
DetailsBarbara Stitt
Plan assigned to (B_S) Barb4/15/2009 3/2/2009 DONE
DetailsBarbara Stitt
First Notice2/11/20102/11/2010   
DetailsJim Sly