Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD09-00249
StatusFinaled
Name LITZINGER CONSTRUCTION CO
Site Address 634 E BOISE AVE
Project NameLuxe' Nail & Spa
Customer Number 
ePlanReviewNo
Description
(LUXE' NAIL & SPA) Permit is for a nail saloon to move into an optometrist office. This change of tenant represents a change in use and requires accessibility upgrades. Approval per approved plans on file. Work to include: [installation of a new water heater, installation of new pedicure and manicure stations, installation of lever hardware, and interior finishes in compliance with chapter 8 of the 2006 IBC. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department.**TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 7/22/20098/6/2009 DONE
This permit finaled on the web by Ken Litzinger
First Notice 4/9/20097/22/2009 DONE
BLD-Final4/9/20094/9/20094/9/2009APASS
DetailsJim Storey
Please call 1/2 hour before inspection....thanks Phone #: ###-#### Internet Inspection Request from: Ken Litzinger final ok card on site.
Permanent Occupancy UNPAID FEE  4/9/2009 DONE
DetailsTisha Gallop
Plan assigned to (TLW)3/31/2009 4/7/2009 PASS
DetailsTim L. Woodard
BLD-Final4/3/20094/3/20094/3/2009PNR
DetailsJim Storey
Please call 1/2 hour before inspectioin..thanks Phone #: ###-#### Internet Inspection Request from: Ken Litzinger
BLD-Final4/3/20094/3/20094/3/2009ADEFR
DetailsJim Storey
Please call 1/2 hour before inspectioin..thanks Phone #: ###-#### Internet Inspection Request from: Ken Litzinger to pm
Routing - MECHANICAL3/31/2009 4/1/2009 PASS
DetailsTroy James
Routing - PLAN CHECK4/1/2009 4/1/2009 PASS
DetailsTim L. Woodard
Mechanical has approved ventilation drawings. TLW
(F) Reprint permit  4/1/2009 DONE
DetailsTisha Gallop
CHANGE STATUS TO (RDY)  4/1/2009 DONE
DetailsTisha Gallop
revised approved mechanical plans ready for pick up, no fees
CHANGE STATUS TO (ISS)  4/1/2009 DONE
DetailsTisha Gallop
picked up approved mechanical plans
Plan resubmittals received  3/31/2009  
DetailsTim L. Woodard
Received 2 copies of sheet M1.0 and taken to Tim Woodard's desk///3-31-09 @ 3:10pm BAS
FIRE-Final Inspection3/24/20093/25/20093/25/2009APASS
DetailsForrest France
Noted corrections finished, fire life safety passed.
Routing - MECHANICAL3/23/2009 3/23/2009 FAIL
DetailsTroy James
Plans failed sent plan review report.
Routing - PLAN CHECK3/23/2009 3/23/2009 FAIL
DetailsTim L. Woodard
MECHANICAL PLAN REVIEW


Owner__Luxe'a Nail and Spa
Address__634 E. Boise Ave
Occupancy__B Type of Construction__VB


1. Ventilation requirements for nail salons per IMC Table 403.3, footnote b, states that there shall be no recirculation of air in the space. The intent of the IMC is that the exhaust system shall be at point of service. Please revise plans to show the exhaust system design to each manicure station. Footnote I states that the required exhaust system shall capture the contaminants and odors at their source.
2. Please show on plans, exhaust to exterior per chapter 5 IMC, for product conveying exhaust systems termination requirements.
3. Please show on plans ventilation calculations and make up air design for the exhaust system at manicure stations.
4. Provide section view on plans of exhaust system design at manicure stations.
5. Show on plans ventilation requirements per Table 403.3 for outside air design of 25 cfm per person.

If you have further questions in regards to this review, please contact:
Troy James
###-####
Faxed plans to Tamura
FIRE-Final Inspection3/19/20093/20/20093/20/2009AFAIL
DetailsForrest France
EM light at the east wall is not functional, provide a current certification tag for the existing fire extinguisher, install approved hardware at the second exit or remove signage.
Plan resubmittals received  3/20/2009  
DetailsTisha Gallop
Received two copies of mechanical sheet M1.0; taken to Tim Woodard
Override - Parcel Holds3/19/20091/1/19003/19/2009  
fire life safety
Issue PAID IN FULL permit  3/10/2009 DONE
DetailsBarbara Stitt
Plan assigned to (TLW)3/3/2009 3/9/2009 PASS
DetailsTim L. Woodard
3/9/2009 14:57:19 TLW - activity updated through activity BLDA022 from case BLD09-00249.
Routing - PLAN CHECK3/9/2009 3/9/2009 PASS
DetailsTim L. Woodard
Per Redlines on plans.
Routing - FIRE  3/9/2009 PASS
DetailsTim L. Woodard
Field Verify
1st review completed  3/9/2009 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  3/9/2009 DONE
DetailsTim L. Woodard
Case Summary (BLD)  3/9/2009 DONE
Print Occupancy Form  3/9/2009 DONE
Details
Telephone call  3/9/2009 DONE
DetailsAlexandra L. DeYoung
LM for Doug. permit ready, fees given
Permit Ready to Issue  3/9/2009 DONE
DetailsAlexandra L. DeYoung
Plans ACCEPTED BY PLAN TECH  3/3/2009 DONE
DetailsBarbara Stitt
Application received 3/2/20093/2/2009 DONE
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  3/2/2009 DONE
DetailsBarbara Stitt