First Notice | | 1/30/2010 | 2/11/2010 | | DONE |
|
|
|
|
Permanent Occupancy | | | 1/20/2010 | | DONE |
|
|
|
|
BLD-Final | 11/19/2009 | 11/20/2009 | 11/20/2009 | P | PASS |
Tom Arcoraci
|
|
|
Garett Phone #: ###-####
|
FIRE-Final Inspection | 11/20/2009 | 11/20/2009 | 11/20/2009 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Temporary Occupancy | 11/20/2009 | 2/18/2010 | 11/20/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
FIRE-Final Inspection | 11/19/2009 | 11/19/2009 | 11/19/2009 | P | CANC |
Troy Cobbley
|
|
|
Overbooked no inspection was performed. Garrett said he would reschedule for tomorrow. Garret Phone #: ###-####
|
BLD-Energy code compliance | 11/18/2009 | 11/19/2009 | 11/19/2009 | A | DONE |
Tom Arcoraci
|
|
|
Garret Phone #: ###-####
|
Zoning Approval | 11/19/2009 | 11/19/2009 | 11/19/2009 | | PASS |
Josh Wilson
|
|
|
|
BLD-Final | 11/17/2009 | 11/18/2009 | 11/18/2009 | A | NR |
Tom Arcoraci
|
|
|
Garet Phone #: ###-#### ready for perm occ
|
BLD-Other | 11/10/2009 | 11/10/2009 | 11/10/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 11/10/2009 | 11/10/2009 | 11/10/2009 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 9/9/2009 | 9/10/2009 | 9/10/2009 | A | PASS |
Jim Storey
|
|
|
Greg around 9 if possible please Phone #: ###-####
|
BLD-Framing/Rough-in | 9/9/2009 | 9/9/2009 | 9/9/2009 | P | FAIL |
Jim Sly
|
|
|
smith Phone #: ###-#### Need Fireblocking and sealing of penitrations thru top plates..... Concrete and CMU OK pending STRATA special insp and approvals
|
Application received | | 3/3/2009 | 8/17/2009 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Framing/Rough-in | 8/11/2009 | 8/12/2009 | 8/12/2009 | A | PART |
Dave Hannah
|
|
|
garrett Phone #: ###-#### needs to fire block top of plumbing chase and get all other trades to finish rough-in and get thier inspections. this is for rest room only.
|
BLD-Footing | 6/5/2009 | 6/8/2009 | 6/8/2009 | P | PASS |
Tom Arcoraci
|
|
|
Garret Phone #: ###-####
|
Issue PAID IN FULL permit | | | 6/4/2009 | | DONE |
Tisha Gallop
|
|
|
|
Print Occupancy Form | | | 5/26/2009 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/26/2009 | | DONE |
Barbara Stitt
|
|
|
|
Routing - PLAN CHECK | 5/21/2009 | | 5/22/2009 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/22/2009 | | DONE |
Sam Zahorka
|
|
|
|
Plan assigned to (SRZ) | 3/3/2009 | | 5/22/2009 | | PASS |
Sam Zahorka
|
|
|
5/22/2009 08:40:03 SRZ - activity updated through activity BLDA022 from case BLD09-00254.
|
Routing - Erosion and Sediment | 5/21/2009 | | 5/21/2009 | | PASS |
Steven Webb
|
|
|
ESC approved w/attached conditions per SGW
|
Routing - PLUMBING | 4/10/2009 | | 4/13/2009 | | PASS |
Bill VanDegrift
|
|
|
|
Routing - PLAN CHECK | 4/13/2009 | | 4/13/2009 | | PASS |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 4/6/2009 | | 4/10/2009 | | PEND |
Sam Zahorka
|
|
|
Pending others to pass. Routed to Plumbing.
|
Plan resubmittals received | | | 4/9/2009 | | |
Tisha Gallop
|
|
|
Received response letter and two copies of sheets A2.1A, A2.1B, A3.1A, A5.1A, M2.1, P0.1, P1.1, P2.1, P3.1, E2.1B, E4.0; inserted by arch. rep. and taken back to Sam Z.
|
Routing - PLAN CHECK | 4/2/2009 | | 4/6/2009 | | FAIL |
Sam Zahorka
|
|
|
Two drinking fountains required per Section 1109.5.1 of the 2006 IBC. Only one provided in resubmittals. Called architect and requested corrections.
|
Plan resubmittals received | | | 4/3/2009 | | |
Sam Zahorka
|
|
|
Received 1 response letter dated 4-3-09 to Sam Zahorka from CSHQA, 2 copies of the following sheets-A2.1a, A2.1b, A3.1a, A5.1a, M2.1, P0.1, P1.1, P2.1, P3.1, E2.1b, E4.0 and taken to Sam Zahorka's desk///4-3-09 @ 3:00pm BAS
|
Routing - FIRE | 3/31/2009 | 3/31/2009 | 4/2/2009 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 4/2/2009 | | FAIL |
|
|
|
Failed Plumbing, Plan Check
|
Route to Impact Fee Review | 3/31/2009 | 4/3/2009 | 4/1/2009 | | PASS |
Cindy M. Gould
|
|
|
|
Case Summary (BLD) | | | 3/31/2009 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 3/19/2009 | | 3/31/2009 | | FAIL |
Sam Zahorka
|
|
|
Emailed Plan Review comments/corrections to the architect.
|
Routing - PLANNING | 3/18/2009 | | 3/19/2009 | | PASS |
Josh Wilson
|
|
|
DRH08-00268 Josh Wilson
|
Routing - PLUMBING | | | 3/18/2009 | | FAIL |
Bill VanDegrift
|
|
|
premise protection must be located inside the building.
|
Routing PW Sewer Rating | | | 3/17/2009 | | PASS |
Louise Waldorf
|
|
|
|
Routing - PUBLIC WORKS | 3/5/2009 | | 3/17/2009 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Solid Waste | | | 3/12/2009 | | PASS |
Peter J. McCullough
|
|
|
All waste to be taken off-site (no dumpsters).
|
Routing PW Street Lights | | | 3/12/2009 | | PASS |
Hank Alarcon
|
|
|
|
Routing PW Drainage | 3/5/2009 | | 3/11/2009 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Design | 3/11/2009 | | 3/11/2009 | | PASS |
Jon R. Gunnerson
|
|
|
Connect to existing sewer service provided
|
Routing - PLANNING Land Div | 3/3/2009 | | 3/5/2009 | | PASS |
Dave Abo
|
|
|
Country Club Subdivision No. 4
|
Plans ACCEPTED BY PLAN TECH | | | 3/3/2009 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/3/2009 | | DONE |
Tisha Gallop
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 3/3/2009 | | DONE |
Tisha Gallop
|
|
|
|
Pending Assignment by JCM | 3/3/2009 | | 3/3/2009 | | BLDA |
John Menard
|
|
|
3/3/2009 14:02:33 JCM - activity updated through activity BLDA160 from case BLD09-00254.
|
Routing - Erosion and Sediment | 3/17/2009 | | | | |
Steven Webb
|
|
|
|