Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD09-00281
StatusFinaled
Name COMMERCIAL REMODELING
Site Address 4659 S ENTERPRISE ST
Project NameAirport-Storage remodel
Customer Number 
ePlanReviewNo
Description
(BOISE AIRPORT STORAGE BUILDING) Permit is install a new man door and overhead door in the west wall of the existing building. Approval per CZC09-00023 and the approved plans. Work to include: installation of a new 14 X 14 foot rollup door, installation of new man door, create two openings in existing masonry wall per engineering for new doors, new hardware, and interior finishes in compliance with chapter 8 of the 2006 IBC. This building is not fire sprinklered.**TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  1/7/2016 DONE
Third Notice 10/11/200910/2/2009 DONE
Second Notice 9/17/20099/18/2009 DONE
First Notice8/5/20098/5/20099/17/2009 DONE
DetailsBarbara Stitt
BLD-Final7/31/20098/5/20098/5/2009PPASS
DetailsJim Storey
Duane please call 1/2 hr before going out Phone #: ###-####
DOC - Permit Finaled8/5/20098/5/20098/5/2009PPASS
DetailsJim Storey
BLD-Final6/24/20096/25/20096/25/2009APART
DetailsJim Storey
rance Phone #: ###-#### need planreview to review north wall and door not reflected on plan with respect to p/l and landings in and out.
FIRE-Final Inspection6/24/20096/24/20096/24/2009PPASS
DetailsForrest France
Life safety inspection per the scope of permit work passed.
BLD-Concrete4/24/20094/27/20094/27/2009APASS
DetailsJim Storey
dale - pouring at 10:00 Phone #: ###-####
Issue PAID IN FULL permit  4/7/2009 DONE
DetailsTisha Gallop
Plan assigned to (TLW)3/5/2009 4/1/2009 PASS
DetailsTim L. Woodard
4/1/2009 08:45:07 TLW - activity updated through activity BLDA022 from case BLD09-00281.
Routing - PLAN CHECK4/1/2009 4/1/2009 PASS
DetailsTim L. Woodard
Alternate letter approved.
PLANS/APPL TAKEN TO FRONT DESK  4/1/2009 DONE
DetailsTim L. Woodard
Case Summary (BLD)  4/1/2009 DONE
DetailsTim L. Woodard
Inspection Record Card- Bld  4/1/2009  
Inspection Record Card- Bld  4/1/2009 DONE
DetailsAlexandra L. DeYoung
Permit Ready to Issue  4/1/2009 DONE
Telephone call  4/1/2009 DONE
DetailsAlexandra L. DeYoung
Lm for Don- permit ready fees given, need GC and RP
Plan resubmittals received  3/30/2009  
DetailsTisha Gallop
Received by mail letter addressed to Geroge Slane and Dave Hanneman, small site plan drawings; taken to Tim Woodard
Routing - PLAN CHECK3/13/2009 3/13/2009 FAIL
DetailsTim L. Woodard
Routing - Erosion and Sediment3/13/2009 3/13/2009 PASS
DetailsTim L. Woodard
Routing - FIRE  3/13/2009 PASS
DetailsTim L. Woodard
Field Verify
1st review completed  3/13/2009 FAIL
DetailsTim L. Woodard
Failed Plan Check.
Application received 3/5/20093/5/2009 DONE
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  3/5/2009 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  3/5/2009 DONE
DetailsBarbara Stitt