Case Summary (BLD) | | | 1/7/2016 | | DONE |
|
|
|
|
Third Notice | | 10/11/2009 | 10/2/2009 | | DONE |
|
|
|
|
Second Notice | | 9/17/2009 | 9/18/2009 | | DONE |
|
|
|
|
First Notice | 8/5/2009 | 8/5/2009 | 9/17/2009 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 7/31/2009 | 8/5/2009 | 8/5/2009 | P | PASS |
Jim Storey
|
|
|
Duane please call 1/2 hr before going out Phone #: ###-####
|
DOC - Permit Finaled | 8/5/2009 | 8/5/2009 | 8/5/2009 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 6/24/2009 | 6/25/2009 | 6/25/2009 | A | PART |
Jim Storey
|
|
|
rance Phone #: ###-#### need planreview to review north wall and door not reflected on plan with respect to p/l and landings in and out.
|
FIRE-Final Inspection | 6/24/2009 | 6/24/2009 | 6/24/2009 | P | PASS |
Forrest France
|
|
|
Life safety inspection per the scope of permit work passed.
|
BLD-Concrete | 4/24/2009 | 4/27/2009 | 4/27/2009 | A | PASS |
Jim Storey
|
|
|
dale - pouring at 10:00 Phone #: ###-####
|
Issue PAID IN FULL permit | | | 4/7/2009 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (TLW) | 3/5/2009 | | 4/1/2009 | | PASS |
Tim L. Woodard
|
|
|
4/1/2009 08:45:07 TLW - activity updated through activity BLDA022 from case BLD09-00281.
|
Routing - PLAN CHECK | 4/1/2009 | | 4/1/2009 | | PASS |
Tim L. Woodard
|
|
|
Alternate letter approved.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/1/2009 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 4/1/2009 | | DONE |
Tim L. Woodard
|
|
|
|
Inspection Record Card- Bld | | | 4/1/2009 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/1/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Permit Ready to Issue | | | 4/1/2009 | | DONE |
|
|
|
|
Telephone call | | | 4/1/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
Lm for Don- permit ready fees given, need GC and RP
|
Plan resubmittals received | | | 3/30/2009 | | |
Tisha Gallop
|
|
|
Received by mail letter addressed to Geroge Slane and Dave Hanneman, small site plan drawings; taken to Tim Woodard
|
Routing - PLAN CHECK | 3/13/2009 | | 3/13/2009 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing - Erosion and Sediment | 3/13/2009 | | 3/13/2009 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - FIRE | | | 3/13/2009 | | PASS |
Tim L. Woodard
|
|
|
Field Verify
|
1st review completed | | | 3/13/2009 | | FAIL |
Tim L. Woodard
|
|
|
Failed Plan Check.
|
Application received | | 3/5/2009 | 3/5/2009 | | DONE |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/5/2009 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/5/2009 | | DONE |
Barbara Stitt
|
|
|
|