Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD09-00287
StatusFinaled
Name SCHWIESOW CONSTRUCTION
Site Address 2822 S VISTA AVE
Project NamePacific Cataract & Laser Insti
Customer Number 
ePlanReviewNo
Description
Pacific Cataract & Laser Institute - To construct a new 9,365 square foot, one story with 1,285 square foot mechanical mezzanine, wood framed medical office building (outpatient eye clinic) and related site improvements. This building is fully fire sprinkled. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 3/11/20103/25/2010 DONE
Permanent Occupancy UNPAID FEE  3/1/2010 DONE
BLD-Final2/19/20102/22/20102/26/2010PDONE
DetailsJim Storey
pat Phone #: ###-####
BLD-Final2/26/20102/26/20102/26/2010PPASS
DetailsJim Storey
Pat Phone #: ###-#### final ok signed card on site.
FIRE-Final Inspection2/18/20102/19/20102/19/2010APASS
DetailsForrest France
Correction notice items are finished, final fire life safety inspection passed.
FIRE-Conference2/18/20102/18/20102/18/2010PDONE
DetailsForrest France
Regarding exit discharge lighting levels at the east side of the building.
FIRE-Final Inspection2/16/20102/16/20102/16/2010ANR
DetailsForrest France
Pending completion of correction notice items as discussed.
FIRE-Final Inspection2/11/20102/12/20102/12/2010AFAIL
DetailsForrest France
Missing one EM light at the east exit discharge per plans, EM light at the south exit disharge is not functional, stairway lacks min. foot candle lighting per IFC requirements. Remainder of fire life safety issues and C/N items are satisfactory.
FIRE-Conference2/9/20102/9/20102/9/2010ADONE
DetailsForrest France
Completed on site review of city set plans and notes with contractor. Noted incorrect door hardware at the main entry/exit, five restrooms and the changing room. Missing one PFE at the second level, need to post fire access lane marking per sheet C1.1, post signage at the door to the FACP room, discussed exit signs, trade permit finals and two project related BLD permits.
PubWorks Occupancy Approval2/1/20102/1/20102/1/2010 DONE
DetailsTiffany Lowery
Zoning Approval2/1/20102/1/20102/1/2010 PASS
DetailsAndrea Tuning
BLD-Other12/17/200912/17/200912/17/2009PPASS
DetailsJim Storey
Pat Phone #: ###-####ceilling c/n made ok.
BLD-Framing/Rough-in12/16/200912/16/200912/16/2009PFAIL
DetailsJim Storey
ceililng grid cover up inspection please--late this afternoon please-Pat Phone #: ###-#### support hvac/can lights and audio in ceilling.
BLD-Wall cover11/13/200911/13/200911/13/2009PPASS
DetailsJim Storey
PAT Phone #: ###-#### hard lids ok
BLD-Framing/Rough-in11/4/200911/4/200911/4/2009PPASS
DetailsJim Storey
pat Phone #: ###-####
BLD-Framing/Rough-in11/2/200911/2/200911/2/2009PPASS
DetailsJim Storey
pat Phone #: ###-####
BLD-Wall cover10/15/200910/16/200910/16/2009APART
DetailsJim Storey
pat Phone #: ###-#### roof and wall framing ok south side of the building ok to insulate.
BLD-Concrete10/13/200910/13/200910/13/2009PPASS
DetailsJim Storey
trash encloser ft and pad rebar ok
BLD-Other10/5/200910/6/200910/6/2009APASS
DetailsJim Storey
Pat-grout underneath the columns Phone #: ###-#### grout ok for cover at interior colm.s
BLD-Other9/11/20099/11/20099/11/2009APASS
DetailsJim Storey
roof ok to cover.
BLD-Other9/10/20099/11/20099/10/2009PFAIL
DetailsJim Storey
pat - roof sheating Phone #: ###-####
BLD-Other8/27/20098/28/20098/28/2009APASS
DetailsJim Storey
Pat- sheer wall Phone #: ###-####
BLD-Framing/Rough-in8/3/20098/4/20098/4/2009APART
DetailsJim Storey
PAT Phone #: ###-#### plate and anchor bolts in place to sill plate.
BLD-Foundation7/21/20097/22/20097/22/2009PPASS
DetailsJim Storey
Pat Phone #: ###-####
Override - Parcel Holds  7/17/2009  
Permit Ready to Issue  7/17/2009 DONE
DetailsAlexandra L. DeYoung
(F) Reprint permit  7/17/2009 DONE
CHANGE STATUS TO (ISS)  7/17/2009 DONE
BLD-Footing7/15/20097/16/20097/16/2009PPASS
DetailsJim Storey
pat Phone #: ###-####
Plan assigned to (JCM)7/16/20097/16/20097/16/2009 PASS
DetailsJohn Menard
7/16/2009 15:09:24 JCM - activity updated through activity BLDA022 from case BLD09-00287.
Plan Reviewer's activity  7/16/2009 PASS
DetailsJohn Menard
Reviewed and approved request for a plan modification to delete the foundation drain. JCM
PLANS/APPL TAKEN TO FRONT DESK  7/16/2009 DONE
DetailsJohn Menard
Plan Modification Accepted  7/16/2009  
DetailsJohn Menard
Plan mod rec'd- civil drawing, the footing drain was deleted- Sheet C2.1-Taken to John M
BLD-Foundation7/7/20097/8/20097/8/2009PPASS
DetailsJim Storey
pat - wall Phone #: ###-#### si to test concrete rebar ok and anchor bolts spacing ok
FIRE-Conference7/1/20097/1/20097/1/2009PDONE
DetailsTroy Cobbley
I spoke to the contractor about fire hydrant placement.
BLD-Footing6/30/20097/1/20097/1/2009PPASS
DetailsMike Jordan
Mike Phone #: ###-####.. Perimeter footings only. Noted that Job has a special insp. agency on site as per approvedplans and start up sheet.
Issue PAID IN FULL permit  6/4/2009 DONE
Permit Ready to Issue  5/29/2009  
Print Occupancy Form  5/29/2009 DONE
Routing - Erosion and Sediment5/27/2009 5/28/2009 PASS
DetailsSteven Webb
ESC plan was approved on 4/28/09 with attached conditions.
Routing - PLAN CHECK5/28/2009 5/28/2009 PASS
DetailsJohn Menard
John M.
PLANS/APPL TAKEN TO FRONT DESK  5/28/2009 DONE
DetailsJohn Menard
Plan assigned to (JCM)3/6/2009 5/28/2009 PASS
DetailsJohn Menard
5/28/2009 08:53:39 JCM - activity updated through activity BLDA022 from case BLD09-00287.
Routing - PUBLIC WORKS5/21/2009 5/27/2009 PASS
DetailsBeverly Hall
Routing PW Drainage  5/27/2009 PASS
Routing PW Sewer Design5/21/2009 5/22/2009 PASS
DetailsJon R. Gunnerson
Connect onto existing sewer service provided
Routing - FIRE5/19/2009 5/21/2009 PASS
DetailsScott Arellano
Attached IFC comments to plans
Routing - PLAN CHECK4/28/2009 5/19/2009 PASS
DetailsJohn Menard
Plan resubmittals received  5/18/2009  
DetailsTisha Gallop
Received by mail response letter and four copies of sheets A2.0, A2.2, A2.3, A6.1, A7.0, A7.1, A8.4, A9.0, E2.0, E3.0, M1.1, M2.0, M2.1, M3.0, M4.0; two copies of sheets C0.1, C1.1, C1.2, C2.1, C2.2, C3.1, C3.2, C4.1, C4.2, C4.3, C5.1, C5.2; inserted by LEG and taken back to John Menard
Routing - PLAN CHECK4/14/2009 4/28/2009  
DetailsJohn Menard
Routing - Erosion and Sediment4/28/2009 4/28/2009 PASS
DetailsSteven Webb
ESC plan approved with attached conditions. ESC09-00104
Plan resubmittals requested  4/20/2009 DONE
DetailsJohn Menard
E-mailed the architect a letter requesting additional revisions. JCM
Plan resubmittals received  4/17/2009 DONE
Received 1 response letter,your comments letter,and 2 full coipes of sheets A2.0,A8.3,A8.4,A9.0,A10.0,E2.0 AND 1 81/2 X 17 of same sheets . Taken to John M.
Routing - FIRE4/10/20094/10/20094/14/2009 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
1st review completed  4/14/2009 FAIL
Failed Public Works, Erosion & Soil Control, Structural, Plumbing, Plan Check, Fire
Route to Impact Fee Review4/10/20094/15/20094/13/2009 PASS
DetailsCindy M. Gould
Routing - PLAN CHECK3/24/2009 4/10/2009 FAIL
DetailsJohn Menard
Plan Reviewer's activity  4/10/2009 PASS
DetailsJohn Menard
Reviewed and approved structural revisions. JCM
Plan resubmittals requested  4/10/2009 DONE
DetailsJohn Menard
E-mailed the architect a copy of the plan review requesting revisions. JCM
Plan resubmittals received  3/30/2009  
DetailsJohn Menard
Received in the mail 1 cover transmittal, 1 copy of comments letter, 3 copies of response calcs, 3 copies of sheets S2.0, S2.1, S4.0, S4.1, S6.0 and taken to John Menard's desk 3-30-09 @ 1:50pm BAS
Routing - PLAN CHECK3/23/2009 3/24/2009  
DetailsJohn Menard
Routing - PLUMBING3/24/2009 3/24/2009 PASS
DetailsBill VanDegrift
per 2003 upc and letter from Pfaff arch. dated 3/23/09
Plan resubmittals received  3/23/2009  
DetailsTisha Gallop
received a letter from Rice Group by fax in response to plumbing plan review comments; inserted into plans by LEG
Routing - PLANNING3/23/2009 3/23/2009 PASS
DetailsAndrea Tuning
DRH08-00396 Andrea Tuning
Routing - PLUMBING3/17/2009 3/23/2009 FAIL
DetailsBill VanDegrift
provide information on the use of the two S-1 sinks in the Clean and Utility areas along with any chemicals or bio-hazards in the area for cross connection protection determination.
Routing - Erosion and Sediment3/16/2009 3/17/2009 FAIL
DetailsSteven Webb
Plan does not meet requirements of BMC 8-17. Faxed review checklist to engineer.
Routing - PUBLIC WORKS3/6/2009 3/16/2009 FAIL
DetailsLouise Waldorf
Routing PW Sewer Rating3/16/2009 3/16/2009 PASS
DetailsLouise Waldorf
Routing PW Solid Waste  3/16/2009 PASS
DetailsPeter J. McCullough
Routing PW Environmental3/16/2009 3/16/2009 PASS
DetailsWalt Baumgartner
No Pretreatment issues
Routing PW Street Lights3/9/2009 3/12/2009 PASS
DetailsHank Alarcon
Plan resubmittals requested  3/11/2009 DONE
DetailsJohn Menard
Emailed the architect a copy of the structural review requesting revisions. JCM
Routing PW Sewer Design3/9/2009 3/11/2009 FAIL
DetailsJon R. Gunnerson
Engineer shall resubmit civil plans to connect onto existing sewer stub rather than a new sewer tap.
Routing Off Site - STRUCTURAL3/6/2009 3/10/2009 FAIL
DetailsJohn Menard
Received comment list from consulting structural engineer requesting revisions. JCM
Application received 3/6/20093/6/2009 DONE
DetailsTisha Gallop
Pending Assignment by JCM3/6/2009 3/6/2009 DONE
DetailsJohn Menard
Plans ACCEPTED BY PLAN TECH  3/6/2009 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  3/6/2009 DONE
DetailsTisha Gallop
Routing - PLANNING Land Div3/6/2009 3/6/2009 PASS
DetailsDave Abo
Parcel "A" on ROS06-00063
Telephone call  3/6/2009 DONE
DetailsTisha Gallop
Called Action Couriers for pick up
Plan routing begun/NEW & ADDTN  3/6/2009 DONE
DetailsTisha Gallop