Permit Information
Permit NumberBLD09-00321
StatusFinaled
Name IND SCHOOL DIST OF BOISE CITY
Site Address 6001 W CASSIA ST
Project NameBORAH HIGH SCHOOL
Customer Number 
ePlanReviewNo
Description
(BORAH HIGH SCHOOL - BLEACHER REPLACEMENT & CONCESSIONS UPGRADE) NOTE: BLEACHER DESIGN CALCS & PLANS ARE DEFERRED SUBMITTALS - NO WORK ON NEW BLEACHERS UNTIL REQUIRED ENGINEERING PLANS AND CALCULATIONS HAVE BEEN REVIEWED AND APPROVED BY THE PDS PLAN REVIEW. To perform selective demolition of existing electrical service for existing concession stand and to the new scorers table controls; to remove three existing outdoor bleacher units and replace with three new units in same locations; install new structural sunshade/weather protection above and behind the new scorers table per engineered plans; and prepare new base for new bleachers. Bleacher engineering design calculations and structural plans showing compliance with the 2006 IBC and ICC-300 02 have been submitted as a DEFERRED SUBMITTAL per Sec. 106.3.4.2, 2006 IBC. The deferred submittal items SHALL NOT be installed until the design and submittal documents have been approved by the building official. As indicated on architectural sheets & in specifications, bleachers are to be 10 rows high and of various length with tiered access aisles per code. Special Inspection is Required - See Sheet A102 & attached SPECIAL INSPECTION START UP FORM. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 7/22/20097/28/2009 DONE
First Notice6/23/20096/23/20097/22/2009 DONE
DetailsTom Arcoraci
Telephone call  7/22/2009 DONE
DetailsTisha Gallop
call from KMO (GC) final value needs to be faxed to Independent School District to Attn: Chris at fax ####-####.
DOC - Permit Finaled6/23/20096/23/20096/23/2009PPASS
DetailsTom Arcoraci
BLD-Final6/22/20096/23/20096/23/2009APASS
DetailsTom Arcoraci
Dustin Phone #: ###-####
Additional plans submitted  6/18/2009 PASS
Deferred submittal Design engineering calcs & letter concerning aluminum design data and plan sheets provided. Idaho licensed structural engineer was Fred Rafar. Design per 2006 IBC, ICC-300 referenced in IBC and ASCE 7-05 indicated on calc sheet & Plan sheet. Reviewed for code compliance.
Telephone call  6/18/2009 DONE
Call to Corey Gillaspy, field project manager fro KMO Const. (###-####) to come and pick up field copy of reviewed engineering & Plan sheets. Left voice message.
PLANS/APPL TAKEN TO FRONT DESK  6/18/2009 PASS
Copy of deferred submittal plans and engineering calcs for bleachers to permit desk for pick up by contractor.
CHANGE STATUS TO (ISS)  6/18/2009 DONE
DetailsTisha Gallop
permit never should have changed to REV status per Dan S. because these are dererred resubmittals. Applicant was notified by Dan S. defrerred resubs ready for pick up at permit counter.
Plan resubmittals received  6/17/2009  
DetailsTisha Gallop
Received transmittal and two copies of structural calcs; taken to Dan Stuart
Telephone call  6/11/2009 DONE
DetailsSam Zahorka
Recieved telephone call from a Cory inquiring about status of permit. I let him know it is Revision status and gave him Dan Stuarts telephone number. SRZ
Plan resubmittals received  6/9/2009  
DetailsTisha Gallop
received deferred resubmittals; two copies of comments, design calculations and test results and properties, soil anchor design calcs, sheets, A1, A2, A3, B1, B2, B3, C1, C2, C3, SD1, SD2; taken to Dan Stuart
BLD-Footing6/1/20096/1/20096/1/2009PPART
DetailsTom Arcoraci
after 3 if possible please--###-#### Cory ok pending mti
Additional plans submitted  5/28/2009 FAIL
Bleacher engineered design calc and details and plan sheets provided under deferred submittal requirements as noted on original architectural plan sheets and permit scope have failed. Architect Scott Roberts & David L. Turner and Chris Wendrowski of Boise School District were sent a e-mail copy of noted deficiencies. A copy was e-mailed to Jason Blais, Building Official and Plan Review Supervisor.
Routing - PLAN CHECK5/26/2009 5/28/2009 FAIL
DetailsDan Stuart
Deferred Submittals for bleacher design engineering and plan sheets failed for code compliance requirements.
Plan resubmittals requested  5/28/2009 DONE
Copy of review e-mailed to Scott Roberts.
Plan resubmittals received  5/26/2009  
DetailsTisha Gallop
deferred resubmittals received: two copies of revised calculations and plan sheets A1, A2, A3, B1, B2, B3, C1, C2, C3, SD1; taken to Dan Stuart
Issue PAID IN FULL permit  5/18/2009 DONE
DetailsTisha Gallop
Permit Ready to Issue  3/25/2009 DONE
Telephone call  3/25/2009 DONE
DetailsBarbara Stitt
Called and left voice message for Scott Robertsx that permit is ready, fees due, need GC name and registration # and RP///3-25-09 @ 12:15pm BAS
Plan assigned to (DRS)3/19/20093/19/20093/23/2009 PASS
DetailsDan Stuart
3/23/2009 14:55:00 B_S - activity updated through activity BLDA022 from case BLD09-00321.
Routing - PUBLIC WORKS3/19/2009 3/23/2009 PASS
DetailsBeverly Hall
routed to Public Works per Brian Murphys request
Routing PW Drainage3/20/2009 3/23/2009 PASS
DetailsBrian Murphy
no inspections required
Routing PW Sewer Rating  3/23/2009 PASS
DetailsLouise Waldorf
Plan resubmittals received  3/23/2009  
DetailsTisha Gallop
received transmittal, letter from Architect, and three copies of page A101; inserted into plans by LEG and taken back to Brian Murphy
PLANS/APPL TAKEN TO FRONT DESK  3/23/2009 DONE
DetailsLouise Waldorf
Inspection Record Card- Bld  3/19/2009 DONE
DetailsAlexandra L. DeYoung
Telephone call  3/19/2009 DONE
DetailsAlexandra L. DeYoung
LM for Scott Roberts, permit ready, fees given, need GC and RP
Permit Ready to Issue  3/19/2009 DONE
DetailsAlexandra L. DeYoung
Telephone call  3/19/2009 DONE
DetailsTisha Gallop
left message for Scott that permit is not ready yet because Public Works, grading wanted to look at the plans before issued.
Plan assigned to (DRS)3/13/2009 3/18/2009 PASS
DetailsDan Stuart
3/18/2009 18:09:20 DRS - activity updated through activity BLDA022 from case BLD09-00321.
Routing - PLAN CHECK3/17/2009 3/18/2009 PASS
DetailsDan Stuart
RESUBMITTALS DESIGNATING ACCESSIBLE SEATING AT NEW BLEACHERS PROVIDED ON SHEET A101 ALONG WITH CODE SECTION AND DIRECTIONS ON PROCESSING OF DEFERRED SUBMITTALS AND LIMITATION ON WORK UNTIL DEFERRED SUBMITTAL REQUIREMENTS ARE RECIEVED AND APPROVED BY PDS PLAN REVIEW.
Plan resubmittals received  3/18/2009 DONE
DetailsTisha Gallop
Received transmittal and two copies of sheet A101; inserted by arch. rep. and taken back to Dan Stuart
PLANS/APPL TAKEN TO FRONT DESK  3/18/2009 PASS
Routing - PLAN CHECK3/13/2009 3/17/2009 FAIL
DetailsDan Stuart
Accessibility compliant wheel chair and companion seating not shown and deferred submittal code section and specifics of deferred submittal items for bleachers not noted on plans. Routing to ESC for review. Copy of plan review to Scott Roberts @ CTA Group.
Routing - Erosion and Sediment3/17/2009 3/17/2009 PASS
DetailsSteven Webb
ESC plan waiver approved with attached conditions. ESC09-00117
Plan resubmittals requested  3/17/2009 DONE
Plan review e-mailed to architect.
Plans ACCEPTED BY PLAN TECH  3/13/2009 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  3/13/2009 DONE
DetailsTisha Gallop
Pending Assignment by JCB3/13/2009 3/13/2009 DONE
DetailsJason Blais
Plan Reviewer's activity  3/13/2009 DONE
DetailsJason Blais
Discussed project with Sarah Schafer in DR Planning. No planning approval required with replacement of existing bleachers. (Same locations)
Application received 3/13/2009