Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD09-00326
StatusFinaled
Name DOUBLE L CONSTRUCTION LLC
Site Address 3494 S TK AVE
Project NameB AND D FOODS
Customer Number 
ePlanReviewNo
Description
(B&D FOODS) Permit is to remodel an existing warehouse to accommodate new tenant. Approval per approved plans on file. Work to include: [construction of interior non-bearing walls to create 6 new offices, one new conference room, new unisex restroom, new utility room, new quality control kitchen, and a small storage closet], construction of a new egress stair off 2nd floor, relocating existing lighting, new two compartment sink, installation of new equipment, new doors and hardware, and interior finishes in compliance with chapter 8 of the 2006 IBC. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. **TLW** 9-22-09 FINAL CERT OF VALUE PER GC $ 184,184.91 ///DLD
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  6/1/2016 DONE
Third Notice 10/2/20099/22/2009 DONE
Application received 3/13/20099/22/2009 DONE
Second Notice 7/22/20098/5/2009 DONE
First Notice 6/23/20097/22/2009 DONE
Permanent Occupancy UNPAID FEE  6/23/2009 DONE
DetailsAlexandra L. DeYoung
FIRE-Final Inspection6/19/20096/22/20096/22/2009APASS
DetailsForrest France
Fire life safety is satisfactory when deadbolts at two existing exterior warehouse doors are removed and one EM light in the new stairway is repaired-to be verified for completion prior to structural final as agreed. Self contained type one kitchen appliance is as indicated on plans is not installed.
BLD-Final6/19/20096/22/20096/22/2009APASS
DetailsJim Storey
Hollis Phone #: ###-#### pending if p&z need sign off. final ok
Zoning Approval6/22/20096/22/20096/22/2009 PASS
DetailsCody Riddle
Interior work only. No zoning inspection required.
FIRE-Final Inspection6/16/20096/16/20096/16/2009ANR
DetailsForrest France
Project related fire sprinkler permit needs finaled prior to building life safety.
BLD-Framing/Rough-in5/11/20095/11/20095/11/2009PPASS
DetailsJim Storey
Hollis Phone #: ###-####
BLD-Framing/Rough-in4/15/20094/15/20094/15/2009APASS
DetailsJim Storey
first floor headers ok to cover upon ele aproval.
BLD-Conference4/13/20094/13/20094/13/2009APASS
DetailsJim Storey
Issue PAID IN FULL permit  4/6/2009 DONE
Routing - FIRE4/2/2009 4/3/2009 PASS
DetailsScott Arellano
Attached updated IFC comments to plans
Routing - PLAN CHECK4/3/2009 4/3/2009 PASS
DetailsTim L. Woodard
Approved with comments in Plan Review Report. TLW
PLANS/APPL TAKEN TO FRONT DESK  4/3/2009 DONE
DetailsTim L. Woodard
Case Summary (BLD)  4/3/2009 DONE
DetailsTim L. Woodard
Print Occupancy Form  4/3/2009 DONE
Details
Telephone call  4/3/2009 DONE
Details
left vm for lloyd at ###-#### - permit ready and fees given
Permit Ready to Issue  4/3/2009 DONE
Details
Plan assigned to (TLW)3/13/2009 4/3/2009 PASS
DetailsTim L. Woodard
4/3/2009 14:33:18 TLW - activity updated through activity BLDA022 from case BLD09-00326.
Routing - PLAN CHECK3/26/2009 4/2/2009 PEND
DetailsTim L. Woodard
routed to fire.
Plan resubmittals received  3/30/2009  
DetailsTim L. Woodard
Received 1 response plan review letter, 1 copy of letter written to George Slane dated 3-12-09 requesting a modification, 3 copies of sheets A-1.1, A-1.2, A-1.3 and taken to Tim Woodard's desk///3-30-09 @ 4:45pm BAS
Routing - FIRE3/23/2009 3/26/2009 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
1st review completed  3/26/2009 FAIL
Failed Plan Check, Fire
Routing - PUBLIC WORKS3/20/2009 3/23/2009 PASS
DetailsBeverly Hall
Routing PW Sewer Rating3/20/2009 3/23/2009 PASS
DetailsLouise Waldorf
Routing PW Environmental  3/23/2009 PASS
DetailsWalt Baumgartner
OK,
Routing - PLAN CHECK3/13/2009 3/20/2009 FAIL
DetailsTim L. Woodard
Plan review report emailed to Peter Rockwell. TLW
Plans ACCEPTED BY PLAN TECH  3/13/2009 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  3/13/2009 DONE
DetailsTisha Gallop