Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD09-00349
StatusFinaled
Name JAMES FROHOCK
Site Address 61 W HORIZON DR
Project Name
Customer Number 
ePlanReviewNo
Description
4-20-2009 THIS PERMIT IS MODIFIED TO REFLECT THE REPLACEMENT OF AN EXISTING REAR DECK SUPPORT BEAM, POST AND FOOTING FOR SAME 4-20-2009 PEP This interior remodel project is to include the reconfiguration of the basement bathroom; 2-bathrooms and utility area and kitchen on the main level. The project will also include a new code complying stairway and basement window relocation, a larger kitchen window and new floor framing around the new stairway area. R-1B ok per Colleen Carroll. Separate electrical, plumbing and mechanical permits are required. All per the approved plans as marked and the plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/14/20097/14/20097/14/2009PPASS
DetailsTony Young
Eric Phone #: ###-####
DOC - Permit Finaled7/14/20097/14/20097/14/2009PPASS
DetailsTony Young
c of c issued
BLD-Final7/13/20097/13/20097/13/2009PNR
DetailsTony Young
eric Phone #: ###-####
need trades
Routing Walk-In (Zoning)4/20/20094/20/20094/20/2009PPASS
DetailsLucinda Grames
Modify permit to allow replacement of support post and beam only. Not to allow patio cover at this time.
Routing Walk-In (BLD)4/20/20094/20/20094/20/2009PPASS
DetailsPerry Paine
BLD-Energy code compliance4/14/20094/16/20094/16/2009APASS
DetailsTony Young
Phone #: ###-####
BLD-Framing/Rough-in4/14/20094/15/20094/15/2009APART
DetailsTony Young
Phone #: ###-####
ok to insulate,, still need mech permit rough in
BLD-Framing/Rough-in4/14/20094/14/20094/14/2009PPART
DetailsTony Young
Phone #: ###-####
need mech sign off 1st,, frame walk through,, ok to insulate after mech. pass,, need straps, fireblocks,, stairs not in yet
BLD-Conference4/3/20094/3/20094/3/2009PPART
DetailsTony Young
Phone #: ###-####
on site stair ?s,, need to meet code by final
Application received 3/19/20093/20/2009 DONE
DetailsTisha Gallop
Routing Walk-In (BLD)3/19/20093/19/20093/20/2009PDONE
DetailsPerry Paine
3/20/2009 08:08:23 PEP - activity updated through activity BLDA022 from case BLD09-00349.
Plan assigned to (PEP)3/19/20093/19/20093/20/2009 PASS
DetailsPerry Paine
3/20/2009 08:08:23 PEP - activity updated through activity BLDA022 from case BLD09-00349.
Case Summary (BLD)  3/20/2009  
Case Summary (BLD)  3/20/2009  
1st review completed  3/20/2009 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/20/2009 DONE
Inspection Record Card- Bld  3/20/2009  
Permit Ready to Issue  3/20/2009 DONE
DetailsBarbara Stitt
Telephone call  3/20/2009 DONE
DetailsBarbara Stitt
Called and left voice message that permit is ready & fees due///3-20-09 BAS
Issue PAID IN FULL permit  3/20/2009 DONE
DetailsTisha Gallop
Routing Walk-In (Zoning)3/19/20093/19/20093/19/2009PPASS
DetailsColleen T Carroll