Permit Information
Permit NumberBLD09-00350
StatusFinaled
Name JORDAN-WILCOMB CONSTRUCTION
Site Address 9289 W BARNES DR
Project NamePINTAIL CENTER, BLACKEAGLE SUB
Customer Number 
ePlanReviewNo
Description
(SUNDANCE INVESTMENTS, LMT/COLLEGE OF WESTERN IDAHO) No new construction under this permit. Scope of work includes interior demolition within the existing 52, 295 sq. ft. commercial building, of non-bearing walls, finishes, ceilings, applicable electrical, plumbing and mechanical in preparation for future tenant improvement. Owner & proposed tenant are proceeding at their own risk with no guarantee that a building permit for the project will be issued. See letter provided by owner/tenant. Contractor is responsible for compliance with Chapter 14, 2006 IFC, Fire Safety During Construction and Demolition and Chapter 33 of the 2006 IBC, Safeguards During construction. Copies of code sections can be reviewed at PDS Department, 2nd floor, Boise City Hall, 150 N. Capitol Blvd. Sprinkler and alarm systems to be maintained operational per NFPA 13 at all times during the demolition, having a certified fire suppression system contractor, contracted by demolition contractor, available on job site to work in conjunction with demolition work to maintain the existing fire & life-safety requirements. All proposed exceptions to this fire-life safety requirement shall be approved in writing from the fire department before demolition work can proceed. Access & use of required existing exits & door hardware shall be maintained for use of contractors at all times. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 8/17/20108/18/2010 DONE
Third Notice 7/20/20108/4/2010 DONE
faxed
Second Notice 7/3/20107/15/2010 DONE
First Notice6/7/20106/7/20106/23/2010 DONE
DetailsMike Jordan
BLD-Final6/7/20106/7/20106/7/2010APASS
DetailsMike Jordan
DOC - Permit Finaled6/7/20106/7/20106/7/2010PPASS
DetailsMike Jordan
Demo is completed.
BLD-Aging Inspection2/25/20102/26/20102/26/2010APASS
DetailsMike Jordan
BLD-Aging Inspection6/23/20096/23/20096/25/2009 PASS
DetailsMike Jordan
wip.
Plan assigned to (DRS)3/19/20093/19/20093/24/2009 PASS
DetailsDan Stuart
3/24/2009 13:37:34 LEG - activity updated through activity BLDA022 from case BLD09-00350.
Routing - PLAN CHECK3/20/2009 3/24/2009 PASS
DetailsTisha Gallop
already passed by DRS on 3/19/09
PLANS/APPL TAKEN TO FRONT DESK  3/24/2009 DONE
Telephone call  3/24/2009 DONE
DetailsTisha Gallop
called Cornel Larson and told him permit is ready and fee
Permit Ready to Issue  3/24/2009 DONE
DetailsTisha Gallop
(F) Reprint permit  3/24/2009 DONE
Issue PAID IN FULL permit  3/24/2009 DONE
Routing - Erosion and Sediment3/19/2009 3/20/2009 PASS
DetailsSteven Webb
ESC plan waiver approved with attached conditions. ESC09-00129
Routing - FIRE3/20/2009 3/20/2009 PASS
DetailsScott Arellano
Plans approved with red line comments. A separate fire sprinkler permit will be required.
1st review completed  3/20/2009 PASS
Application received 3/19/20093/19/2009 DONE
DetailsDarla L Downs
Routing - PLAN CHECK3/19/2009 3/19/2009 PASS
DetailsDan Stuart
Routed to ESC then to fire code analyst.
Meeting  3/17/2009 DONE
DetailsDan Stuart
Meeting with Angie Brosious, PDS Project Manager; Cornel Larson & Donna Jenkins, Larson Architects; Chris Anderson, Sundance Properties; Frank Lee, Tenant Rep; Cody Riddle, Planning, Scott Arellano, Fire; George Slane, Jenifer Gilliland & Dan Stuart PDS Building. Discussed scope of work, time frames requirements, occupancy uses and submittal dates. Want to submit plans for review processing while going through Planning for review and approval. Angie will provide hold harmless agreement for tenant / building owner to sign with understanding that issuing an interior demolition permit and reviewing the plans before Planning DRH is approved does not guarantee that a permit will be issued for the project. Tenant & building owner proceed at their own risk. Plans and certificate of value for interior demolition permit to be submitted by 3/18/09 if proposed schedule is to be maintained. Plan Intake to see if plans can be received into plan routing for review process tentatively set for 4/1/09. Tentative permit date of 4/17/09 and occupancy on 7/1/09.