Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD09-00364
StatusFinaled
Name CHESAPEAKE HOMES
Site Address 10532 W PALAZZO LN
Project Name
Customer Number 
ePlanReviewNo
Description
This permit is for the construction of a new single level townhouse attached to one other unit. The attached garage is 400 square feet, the covered back porch is 95 square feet, and the covered front patio is 84 square feet. The living space is 1137 square feet with two bedrooms and two bathrooms. The separation wall is a common two hour wall built to gypsum detail WP 4135 or WP 4136 both details are shown on page A-4.0 of the plans. The side setback on this property is five feet and the roof eave will project into the fire separation distance and will be protected to one hour per the detail on page A-4.0 on the plans. THE PERMIT HOLDER is responsible to comply with section R602.10 for wall bracing or build to an engineered design. R-1C zoning district, building setbacks and CUP05-00087 per Planning and Zoning. Built per all approved plans, red lining and plan review report. (BSP)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/9/20097/9/20097/9/2009PPASS
DetailsJim Storey
Kevin Phone #: ###-####
DOC - Permit Finaled7/9/20097/9/20097/9/2009PPASS
DetailsJim Storey
BLD-Final7/7/20097/8/20097/8/2009ANR
DetailsTom Arcoraci
kevin Phone #: ###-####
Zoning Approval7/8/20097/8/20097/8/2009 PASS
DetailsDavid Moser
Will issue CO. Sub needs amenities installed/constructed. Will not issue further bld permits.
BLD-Energy code compliance6/16/20096/16/20096/16/2009PPASS
DetailsMike Jordan
Eric if possable late afternoon Phone #: ###-####. Framing and permitissues were resolved. ok to cover.
BLD-Framing/Rough-in6/15/20096/15/20096/15/2009PFAIL
DetailsMike Jordan
eric Phone #: ###-####. Provide 2 additional studs at bearing point for T15 2-ply truss. Pull mech permit for fire place and get rough in inspection. ok to insul. c/n posted.
BLD-Conference4/24/20094/24/20094/24/2009PPART
DetailsMike Jordan
Remainder of 2hr. firewall from ceiling to roof deck as well as soffitts, patio aqnd garage extensions.
BLD-Framing/Rough-in4/22/20094/22/20094/22/2009APART
DetailsMike Jordan
Nailing for 5/8 type x rock for 2hr. fire wall.
BLD-Concrete4/13/20094/14/20094/14/2009APART
DetailsMike Jordan
chris - wall Phone #: ###-####
BLD-Footing4/10/20094/10/20094/10/2009APASS
DetailsMike Jordan
Inspection Record Card- Bld  4/6/2009 DONE
Details
Issue PAID IN FULL permit  4/3/2009 DONE
DetailsTisha Gallop
Telephone call  4/1/2009 DONE
DetailsAlexandra L. DeYoung
Talked to Eric- permit ready fees given
Permit Ready to Issue  4/1/2009 DONE
DetailsAlexandra L. DeYoung
Route to Impact Fee Review3/31/20094/3/20093/31/2009 PASS
DetailsCindy M. Gould
Plan assigned to (BSP)3/23/20093/23/20093/31/2009 PASS
DetailsBen S. Pavelka
3/31/2009 10:34:14 BSP - activity updated through activity BLDA022 from case BLD09-00364.
Routing - PLAN CHECK3/24/2009 3/31/2009 PASS
DetailsBen S. Pavelka
Inspection Record Card- Bld  3/31/2009 DONE
Details
Case Summary (BLD)  3/31/2009 DONE
DetailsBen S. Pavelka
PLANS/APPL TAKEN TO FRONT DESK  3/31/2009 DONE
DetailsBen S. Pavelka
Plans ACCEPTED BY PLAN CHECK  3/26/2009  
DetailsBen S. Pavelka
Telephone call  3/26/2009 DONE
DetailsBen S. Pavelka
Called Max Boesiger at ###-#### on 3-26-09 at 11:40 to notify him that I will need a new res check for this structure. (BSP)
1st review completed  3/26/2009 DONE
DetailsBen S. Pavelka
Routing - PLANNING3/23/2009 3/24/2009 PASS
DetailsSue Cummings
See redlines on site plan.
Routing - Addressing3/23/2009 3/23/2009 PASS
DetailsChris Pichardo
Routing - PUBLIC WORKS3/23/2009 3/23/2009 PASS
DetailsLouise Waldorf
Application received 3/23/2009