BLD-Final | 7/7/2009 | 7/8/2009 | 7/8/2009 | A | PASS |
Dave Hannah
|
|
|
Ken Phone #: ###-####
|
DOC - Permit Finaled | 7/8/2009 | 7/8/2009 | 7/8/2009 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Other | 5/11/2009 | 5/12/2009 | 5/12/2009 | P | PASS |
Dave Hannah
|
|
|
Ken Phone #: ###-#### spa ok to shot
|
BLD-Other | 4/21/2009 | 4/21/2009 | 4/22/2009 | P | PASS |
Dave Hannah
|
|
|
Ken- rebar for pool Phone #: ###-####
|
PubWorks Subgrade Approval | 4/21/2009 | 4/21/2009 | 4/21/2009 | | DONE |
Terry Records
|
|
|
Pool subgrade approved by the geotechnical engineer
|
Plan assigned to (PEP) | 3/23/2009 | 3/23/2009 | 3/23/2009 | | DONE |
Perry Paine
|
|
|
|
Application received | | 3/23/2009 | 3/23/2009 | | DONE |
|
|
|
|
Routing Walk-In (PW Hillside) | 3/23/2009 | 3/23/2009 | 3/23/2009 | A | PASS |
Terry Records
|
|
|
A letter from the applicants geotechnical engineer indicating that the pool subgrade is acceptable must be approved by Public Works prior to scheduling an inspection. call Terry Records at ###-#### with questions.
|
Routing Walk-In (Zoning) | 3/23/2009 | 3/23/2009 | 3/23/2009 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 3/23/2009 | 3/23/2009 | 3/23/2009 | P | DONE |
Perry Paine
|
|
|
3/23/2009 13:21:55 PEP - activity updated through activity BLDA022 from case BLD09-00368.
|
Case Summary (BLD) | | | 3/23/2009 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/23/2009 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/23/2009 | | |
|
|
|
|
1st review completed | | | 3/23/2009 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/23/2009 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/23/2009 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/23/2009 | | DONE |
Darla L Downs
|
|
|
|
CHANGE STATUS TO (ISS) | | | 3/23/2009 | | DONE |
Darla L Downs
|
|
|
|