Third Notice | | 6/1/2010 | 5/25/2010 | | DONE |
|
|
|
|
Third Notice | | 4/12/2010 | 5/21/2010 | | DONE |
|
|
|
faxed
|
Third Notice | | 3/15/2010 | 3/29/2010 | | DONE |
|
|
|
faxed
|
Second Notice | | 3/5/2010 | 3/10/2010 | | DONE |
|
|
|
|
First Notice | | 2/13/2010 | 2/23/2010 | | DONE |
|
|
|
|
BLD-Final | 2/3/2010 | 2/3/2010 | 2/3/2010 | P | PASS |
Jim Storey
|
|
|
|
Permanent Occupancy | | | 2/3/2010 | | DONE |
|
|
|
|
FIRE-Final Inspection | 1/29/2010 | 1/29/2010 | 1/29/2010 | P | PASS |
Forrest France
|
|
|
Fire life safety passed, ceiling tile to be replaced prior to structural final.
|
BLD-Final | 1/28/2010 | 1/29/2010 | 1/29/2010 | P | PART |
Jim Storey
|
|
|
Craig Phone #: ###-#### final occ ok pending plm perm sign off.
|
FIRE-Final Inspection | 1/27/2010 | 1/28/2010 | 1/28/2010 | P | DEFR |
Forrest France
|
|
|
Pending project related fire alarm permit final.
|
BLD-Final | 1/27/2010 | 1/28/2010 | 1/28/2010 | P | DEFR |
Jim Storey
|
|
|
Craig Phone #: ###-####
|
PubWorks Occupancy Approval | 1/11/2010 | 1/11/2010 | 1/11/2010 | | DONE |
Tiffany Lowery
|
|
|
|
Zoning Approval | 1/8/2010 | 1/8/2010 | 1/8/2010 | | PASS |
Josh Wilson
|
|
|
|
FIRE-Conference | 1/5/2010 | 1/5/2010 | 1/7/2010 | P | DONE |
Forrest France
|
|
|
Regarding items needed for final including project related fire alarm work, door hardware, fire life safety issues.
|
BLD-Wall cover | 12/7/2009 | 12/7/2009 | 12/7/2009 | P | PASS |
Jim Storey
|
|
|
ceilling firestop ok
|
FIRE-Conference | 12/3/2009 | 12/3/2009 | 12/3/2009 | A | DONE |
Forrest France
|
|
|
Regarding exit sign location at the new vestibule.
|
BLD-Energy code compliance | 12/1/2009 | 12/2/2009 | 12/2/2009 | P | PASS |
Jim Storey
|
|
|
craig Phone #: ###-####
|
BLD-Framing/Rough-in | 11/30/2009 | 12/1/2009 | 12/1/2009 | P | PASS |
Jim Storey
|
|
|
Graig Phone #: ###-####
|
BLD-Framing/Rough-in | 11/24/2009 | 11/25/2009 | 11/25/2009 | P | CANC |
Jim Storey
|
|
|
CRAIG Phone #: ###-####
|
BLD-Conference | 11/12/2009 | 11/13/2009 | 11/13/2009 | A | PASS |
Jim Storey
|
|
|
CRAIG Phone #: ###-#### steel support beams ok si ok for epoxy holddowns and ab's in plate interior bearing wall.
|
BLD-Framing/Rough-in | 10/28/2009 | 10/29/2009 | 10/29/2009 | P | PASS |
Jim Storey
|
|
|
Craig Phone #: ###-#### exterior and roof ok to apply gyp and rooffing materials.
|
BLD-Conference | 10/28/2009 | 10/28/2009 | 10/28/2009 | P | PASS |
Jim Storey
|
|
|
Craig Phone #: ###-####
|
BLD-Framing/Rough-in | 10/20/2009 | 10/21/2009 | 10/21/2009 | P | PART |
Jim Storey
|
|
|
craig Phone #: ###-#### ok to gyp coridor walls pending achor bolt/plate rfi to engineer.
|
BLD-Foundation | 10/12/2009 | 10/13/2009 | 10/13/2009 | A | PASS |
Jim Storey
|
|
|
craig Phone #: ###-####
|
BLD-Conference | 10/8/2009 | 10/9/2009 | 10/9/2009 | A | PASS |
Jim Storey
|
|
|
craig Phone #: ###-####
|
BLD-Footing | 10/9/2009 | 10/9/2009 | 10/9/2009 | A | PASS |
Jim Storey
|
|
|
craig Phone #: ###-#### ft and rebar ok
|
Issue PAID IN FULL permit | | | 9/28/2009 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/23/2009 | | 5/4/2009 | | |
John Menard
|
|
|
|
Routing - PLANNING | 5/4/2009 | | 5/4/2009 | | PASS |
Josh Wilson
|
|
|
Revised landcsape plan ok JGW
|
Routing - PLAN CHECK | 5/4/2009 | | 5/4/2009 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/4/2009 | | DONE |
John Menard
|
|
|
|
Print Occupancy Form | | | 5/4/2009 | | DONE |
|
|
|
|
Telephone call | | | 5/4/2009 | | DONE |
|
|
|
t/c w cornel larsen at ###-#### - pemit ready and fees given - also need rp and ACHD receipt
|
Permit Ready to Issue | | | 5/4/2009 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 3/27/2009 | | 5/4/2009 | | PASS |
John Menard
|
|
|
5/4/2009 10:16:30 JCM - activity updated through activity BLDA022 from case BLD09-00378.
|
Plan resubmittals received | | | 4/30/2009 | | |
John Menard
|
|
|
Received 1 cover transmittal and 2 copies of sheet L-1 and taken to John Menards desk///4-30-09 @ 9:07am BAS
|
Routing - PLANNING | 4/22/2009 | | 4/23/2009 | | FAIL |
Josh Wilson
|
|
|
Routed for resubmittals/revisions- FAIL- need revised landscape plan to match revised civil plans
|
Routing - PLAN CHECK | 4/15/2009 | | 4/22/2009 | | PASS |
John Menard
|
|
|
|
Plan resubmittals received | | | 4/21/2009 | | |
John Menard
|
|
|
Received 1 cover transmittal, 1 copy of plan review response, 2 copies of sheets ST-1, C-1, C-2, C-3, A-1, A-2, A-3, A-6, A-7, A-8, A-9, M1.0, P1.0, E1.1 and inserted into pland then taken to John Menard's desk///4-22-09 @ 10:25am BAS
|
Plan resubmittals received | | | 4/21/2009 | | |
John Menard
|
|
|
Received 1 cover transmittal and 3 copies of sheets C-1, C-2, C-3 and inserted into plans then taken to John Menard's desk///4-22-09 @ 10:25am BAS
|
Routing - FIRE | 4/13/2009 | 4/13/2009 | 4/15/2009 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 4/15/2009 | | FAIL |
|
|
|
Failed Plan Check
|
Route to Impact Fee Review | 4/13/2009 | 4/16/2009 | 4/13/2009 | | PASS |
Cindy M. Gould
|
|
|
|
Plan Reviewer's activity | | | 4/13/2009 | | PASS |
John Menard
|
|
|
Reviewed and approved structural portion of this project. JCM
|
Plan resubmittals requested | | | 4/13/2009 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
Routing - PLAN CHECK | 4/9/2009 | | 4/13/2009 | | FAIL |
John Menard
|
|
|
|
Routing - PLANNING | 4/9/2009 | | 4/9/2009 | | PASS |
Josh Wilson
|
|
|
|
Routing - PLUMBING | 4/3/2009 | | 4/9/2009 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Routing - Erosion and Sediment | 4/2/2009 | | 4/3/2009 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions. ESC09-00138.
|
Routing - PUBLIC WORKS | 3/30/2009 | | 4/2/2009 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Drainage | 3/31/2009 | | 4/1/2009 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Environmental | 3/31/2009 | | 3/31/2009 | | PASS |
Walt Baumgartner
|
|
|
OK, no pretreatment needed for minimal "containental breakfast" food service, single service sink only.
|
Routing PW Sewer Rating | 3/31/2009 | | 3/31/2009 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING Land Div | 3/27/2009 | | 3/30/2009 | | PASS |
Dave Abo
|
|
|
Legal parcel with existing building.
|
Plans ACCEPTED BY PLAN TECH | | | 3/27/2009 | | DONE |
Darla L Downs
|
|
|
|
Pending Assignment by JCM | 3/27/2009 | | 3/27/2009 | | BLDA |
John Menard
|
|
|
3/27/2009 10:23:20 JCM - activity updated through activity BLDA166 from case BLD09-00378.
|
Plan routing begun/NEW & ADDTN | | | 3/27/2009 | | DONE |
|
|
|
|
Application received | | 3/26/2009 | 3/26/2009 | | DONE |
Darla L Downs
|
|
|
|