BLD-Aging Inspection | 8/25/2011 | 8/25/2011 | 8/25/2011 | | PASS |
Tom Arcoraci
|
|
|
|
Print Occupancy Form | | | 8/25/2011 | | DONE |
Barbara Stitt
|
|
|
|
Permanent Occupancy | | | 8/25/2011 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 3/30/2011 | 3/30/2011 | 3/30/2011 | P | PASS |
Tom Arcoraci
|
|
|
Call 20 min before arrival---Vern Phone #: ###-####
|
FIRE-Final Inspection | 3/29/2011 | 3/29/2011 | 3/29/2011 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Aging Inspection | 3/28/2011 | 3/28/2011 | 3/28/2011 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 1/25/2011 | 1/25/2011 | 1/31/2011 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 11/1/2010 | 11/25/2010 | 11/26/2010 | A | PASS |
Tom Arcoraci
|
|
|
ok per jg
|
Extend Review Timeline | | | 11/24/2010 | | DONE |
Jenifer Gilliland
|
|
|
Per Jenifer extend permit to requested date 4/1/2011. TLW Refer to attached extension letter.
|
FIRE-Final Inspection | 11/8/2010 | 11/8/2010 | 11/8/2010 | P | FAIL |
Troy Cobbley
|
|
|
Resubmit plans showing the shed that has been built on the north side of the building. Repair the exit sign/emergency light at the main door. Remove the thumbturn lock at the main door (keyed on egress side is ok). Discuss hardware issues on the double doors to the new shed with the plan reviewer. Currently there is lever passage hardware down low and a thumbturn dead bolt up high on the active leaf. The inactive leaf has manual flush bolts.
|
BLD-Aging Inspection | 11/1/2010 | 11/1/2010 | 11/1/2010 | | PART |
Tom Arcoraci
|
|
|
|
DOC - Permit Expired | 8/27/2010 | 8/30/2010 | 8/30/2010 | P | CANC |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 8/27/2010 | 8/27/2010 | 8/27/2010 | | PART |
Tom Arcoraci
|
|
|
|
Issue PAID IN FULL permit | | | 5/28/2010 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/27/2010 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 5/27/2010 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 5/27/2010 | | DONE |
Barbara Stitt
|
|
|
Called and ledt message for Vern that permit is ready @ 10:00am on 5-27-10///BAS
|
Routing - PLAN CHECK | 5/25/2010 | | 5/25/2010 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/25/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 5/25/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | 4/1/2009 | | 5/25/2010 | | PASS |
Tim L. Woodard
|
|
|
5/25/2010 16:32:37 TLW - activity updated through activity BLDA022 from case BLD09-00414.
|
Extend Review Timeline | | | 12/8/2009 | | DONE |
|
|
|
Cannot complete occupancy review until a site visit occurs from planning department and cannot install landscaping because of the winter season. DR approval is the only thing remaining for a permanent C of O. The Building was finaled as a storage building originally but never received a C of O. New permit application expiration date is March 29, 2010. This is the only permit application extension that will be granted.
|
Routing - PLAN CHECK | 4/1/2009 | | 4/8/2009 | | FAIL |
Tim L. Woodard
|
|
|
Awaiting site visit from Sarah Schafer. Old DR never finaled. DR-9-92.
|
1st review completed | | | 4/8/2009 | | FAIL |
Tim L. Woodard
|
|
|
|
Application received | | 4/1/2009 | 4/1/2009 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/1/2009 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/1/2009 | | DONE |
Tisha Gallop
|
|
|
|
First Notice | | 9/4/2011 | | | |
|
|
|
|