Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD09-00436
StatusFinaled
Name HC COMPANY INC
Site Address 11311 W CHINDEN BLVD
Project NameHP #3
Customer Number409031
ePlanReviewNo
Description
(HEWLETT PACKARD BLDG 3 - UPPER Conference Room) For minor tenant improvements to an existing 1,267 sq. ft. conference room on the 75,000 sq. ft. second level with work to include the removal of an existing accordian door and the installation of a new non-combustible partition wall to divide the large conference room into one 552 sq. ft. and one 715 sq. ft. conference room. All work to be done per the aproved plans. THIS IS A FULLY SPRINKLERED BUILDING, ANY ALTERATIONS TO THE SPRINKLER SYSTEM WILL REQUIRE A SEPARATE PERMIT AND SHALL COMPLY WITH NFPA#13 AS REGULATED BY BOISE CITY FIRE DEPARTMENT. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 9/15/20099/16/2009 DONE
Third Notice 9/4/20099/15/2009 DONE
Telephone call  9/15/2009 DONE
DetailsTisha Gallop
called and left voice message for Matt Smith w/HC Company, need final values
Third Notice 8/5/20099/4/2009 DONE
Second Notice 7/22/20098/5/2009 DONE
First Notice4/28/20094/28/20097/22/2009 DONE
DetailsMike Jordan
Letter of compliance  5/21/2009 DONE
DetailsTisha Gallop
BLD-Final4/27/20094/28/20094/28/2009PPASS
DetailsMike Jordan
Please call one half hour upon arrival. Thanks. Phone #: ###-#### Internet Inspection Request from: Darren Gossett
DOC - Permit Finaled4/28/20094/28/20094/28/2009PPASS
DetailsMike Jordan
FIRE-Final Inspection4/27/20094/28/20094/28/2009APASS
DetailsTroy Cobbley
life safety passed
BLD-Framing/Rough-in4/10/20094/10/20094/10/2009PPASS
DetailsJim Sly
BLD-Framing/Rough-in4/9/20094/10/20094/10/2009APASS
DetailsJim Sly
Please call one 1/2 hour upon arrival, thanks. Phone #: ###-#### Internet Inspection Request from: Darren Gossett
Issue PAID IN FULL permit  4/9/2009 DONE
Inspection Record Card- Bld  4/8/2009 DONE
Details
Telephone call  4/8/2009 DONE
Details
t/c w stan cole at ###-#### - permit ready and fees given
Permit Ready to Issue  4/8/2009 DONE
Details
Plan assigned to (CDM)4/7/20094/7/20094/7/2009 DONE
DetailsCarl D Madsen
Routing - FIRE  4/7/2009 PASS
verify in field CDM
Case Summary (BLD)  4/7/2009 DONE
PLANS/APPL TAKEN TO FRONT DESK  4/7/2009  
Plans ACCEPTED BY PLAN TECH  4/7/2009 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  4/7/2009 DONE
DetailsTisha Gallop
Plan assigned to (TLW)4/7/2009 4/7/2009 DEFR
DetailsTim L. Woodard
Routing - PLAN CHECK4/7/2009 4/7/2009 PASS
DetailsCarl D Madsen
1st review completed  4/7/2009 DONE
DetailsCarl D Madsen
Application received 4/6/2009