Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD09-00488
StatusFinaled
Name VISTA CONSTRUCTION INC
Site Address 303 N ALLUMBAUGH ST
Project NameINTERMOUNTAIN HOSPITAL
Customer Number 
ePlanReviewNo
Description
(INTERMOUNTAIN HOSPITAL) Remodel to physically divide existing "I-3" occupancies into two separate I-3 Occupancies by infill of door opening in 2-hour fire wall with 2-hour assembly. This permit scope is for the west building. Work to include select demolition to provide new exterior exit door and change use of one existing Therapy/Classroom into a Lobby as part of the new exit system leading to the court yard. To add new cabinetry, sinks, doors, hardware, exit signage and emergency illumination; and to secure the existing opposite swing double doors in the closed position and infill the opening at the door on the west building side with wall type W5 for 2-hour construction. At the new exterior door provide a landing and sloped (1:20 max slope) access path down to the secured court yard. The exit discharge into the secured court complies with section 408.3.4 with required refuge area beyond the 50' separation from the building. Also reference permit BLD09-00489, T.I. for the east building. This is an existing "I-3" occupancy under the 1997 UBC as reviewed and approved by the State of Idaho Division of Building Safety, regulating premanufactured modular building systems, #PA 11795FB, Tag #8960FB. This is a secured facility. Scope of work will not change occupancy use group, building area or the occupant load originally approved. Planning approval done under CZC09-00056. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  10/29/2009 DONE
DetailsBarbara Stitt
DOC - L/C Approved  10/29/2009 DONE
DetailsBarbara Stitt
BLD-Final10/27/200910/28/200910/28/2009APASS
DetailsTom Arcoraci
Mike Phone #: ###-####
FIRE-Final Inspection10/27/200910/28/200910/28/2009APASS
DetailsTroy Cobbley
Life safety passed.
BLD-Framing/Rough-in10/16/200910/16/200910/16/2009PPART
DetailsTom Arcoraci
BLD-Aging Inspection10/16/200910/16/200910/16/2009 PASS
DetailsTom Arcoraci
Issue PAID IN FULL permit  7/17/2009 DONE
DetailsTisha Gallop
Routing - FIRE4/27/20094/27/20094/29/2009 PASS
DetailsScott Arellano
Attached IFC comments to plans
Plan assigned to (DRS)4/14/2009 4/29/2009 PASS
DetailsDan Stuart
4/29/2009 10:47:23 DRS - activity updated through activity BLDA022 from case BLD09-00488.
1st review completed  4/29/2009 PASS
Routing - PLAN CHECK4/29/2009 4/29/2009 PASS
DetailsDan Stuart
To permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  4/29/2009 PASS
Inspection Record Card- Bld  4/29/2009 DONE
Details
Telephone call  4/29/2009 DONE
DetailsAlexandra L. DeYoung
Talked to Matt- permit ready, fees given- also need GC and RP
Permit Ready to Issue  4/29/2009  
DetailsAlexandra L. DeYoung
Route to Impact Fee Review4/27/20094/30/20094/28/2009 PASS
DetailsCindy M. Gould
existing building no impact fees
Routing - PLAN CHECK4/15/2009 4/27/2009 PEND
DetailsDan Stuart
No resubmittals required. Plans red-lined for code clarification as applicable. routing to fire code analyst.
Routing - PUBLIC WORKS4/14/2009 4/15/2009 PASS
DetailsBeverly Hall
Routing - Design Review4/15/2009 4/15/2009 PASS
DetailsAndrea Tuning
Andrea Tuning. CZC09-00056
Routing - Erosion and Sediment4/15/2009 4/15/2009 PASS
DetailsSteven Webb
ESC plan waiver approved with attached conditions. ESC09-00171
Routing PW Sewer Rating4/15/2009 4/15/2009 PASS
DetailsLouise Waldorf
Pending Assignment by JCB4/13/2009 4/14/2009 DONE
DetailsJason Blais
Recd Pcfee & Taken To Pln CK  4/13/2009 DONE
Plans ACCEPTED BY PLAN TECH  4/13/2009 DONE
DetailsDarla L Downs
Application received 4/10/2009