Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD09-00513
StatusExpired
Name DONA HORAN
Site Address 1020 E JEFFERSON ST
Project Name 
Customer Number 
ePlanReviewNo
Description
This permit is for the addition to an existing single family dwelling with a basement. The addition will be 491 square feet and include a basement with insulated concrete forms, with the South wall existing foundation wall. Work to include removing an existing set of stairs and rough in for future bathroom in basement. Separate permits are required for electrical, mechanical and plumbing. No deck to be installed at this time. Window by door will be moved to create a distance of two feet or the window will be tempered. Built per all approved plans, red lining and plan review report. R-2H zoning district, building setbacks, and DRH08-00204 per Planning and Zoning. (BSP)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Expired1/10/20111/10/20111/11/2011PPASS
DetailsDave Hannah
BLD-Aging Inspection1/10/20111/10/20111/10/2011 PASS
DetailsDave Hannah
BLD-Aging Inspection11/8/201011/8/201011/9/2010 PART
DetailsDave Hannah
work in progress
BLD-Final9/7/20109/8/20109/8/2010APART
DetailsTony Young
Dona-Please call at least 30 mins prior to inspection Phone #: ###-####,, verbal conf only,, need trades,, zoning, 1st,, ok to keep permit active,, may do a deck or patio,, when more $
Zoning Approval6/8/20106/8/20106/9/2010 DONE
DetailsMatthew A Halitsky
BLD-Aging Inspection6/7/20106/7/20106/7/2010 PASS
DetailsDave Hannah
home owner will schedule finals
BLD-Conference4/5/20104/5/20104/5/2010PPASS
DetailsDave Hannah
wip
BLD-Aging Inspection3/31/20103/31/20104/5/2010 PASS
DetailsDave Hannah
BLD-Aging Inspection1/29/20101/29/20102/2/2010 PASS
DetailsDave Hannah
work in progress
BLD-Energy code compliance9/8/20099/9/20099/10/2009APASS
DetailsDave Hannah
Dona- call 30 mins prior to going Phone #: ###-#### ok to cover
BLD-Energy code compliance8/28/20098/28/20098/28/2009PNR
DetailsDave Hannah
Dona Phone #: ###-####
BLD-Framing/Rough-in8/28/20098/28/20098/28/2009PPART
DetailsDave Hannah
Dona Phone #: ###-#### ok to insulate needs to fire block basement wall and install seal package
BLD-Foundation6/23/20096/23/20096/24/2009PPASS
DetailsDave Hannah
mike Phone #: ###-####
BLD-Footing6/12/20096/15/20096/16/2009APASS
DetailsDave Hannah
mike Phone #: ###-####
Routing Walk-In (BLD)5/21/20095/21/20095/21/2009APASS
DetailsPerry Paine
basement wall reinforcing ok to use the engineering calcs over the plan details. pep
Routing Walk-In (Zoning)4/16/20094/16/20094/16/2009APASS
DetailsColleen T Carroll
Routing Walk-In (BLD)4/16/20094/16/20094/16/2009ADONE
DetailsBen S. Pavelka
4/16/2009 11:57:47 BSP - activity updated through activity BLDA022 from case BLD09-00513.
Case Summary (BLD)  4/16/2009 DONE
Inspection Record Card- Bld  4/16/2009 DONE
PLANS/APPL TAKEN TO FRONT DESK  4/16/2009 DONE
Issue PAID IN FULL permit  4/16/2009 DONE
DetailsTisha Gallop
Application received 4/16/2009