Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD09-00516
StatusFinaled
Name PERKINS CONSTRUCTION
Site Address 238 E GOWEN RD
Project NamePERKINS OFFICE & STORAGE UNITS
Customer Number 
ePlanReviewNo
Description
Perkins Office & Self Storage Units - Parking Garage & Shop - (Buildings #2 & #3) - To construct a new 3,595 sq. ft., one story, wood frame parking garage and maintenance shop and related site improvements. The parking garage contains 10 parking spaces. This building was reviewed as nonseparated occupancies. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 11/8/201012/8/2010 DONE
Third Notice 10/12/201010/25/2010 DONE
faxed
Second Notice 10/4/201010/7/2010 DONE
First Notice 9/17/20109/24/2010 DONE
Permanent Occupancy  9/7/2010 DONE
DetailsBarbara Stitt
BLD-Final9/1/20109/1/20109/1/2010PPASS
DetailsJim Storey
James Phone #: ###-####
Zoning Approval9/1/20109/1/20109/1/2010 PASS
DetailsJosh Wilson
BLD-Aging Inspection7/6/20107/6/20107/8/2010 PASS
DetailsJim Storey
temp ok
BLD-Final5/6/20105/6/20105/6/2010APASS
DetailsJim Storey
temp ok
BLD-Final5/5/20105/5/20105/6/2010PDEFR
DetailsJim Storey
james Phone #: ###-#### out of time
FIRE-Final Inspection5/3/20105/4/20105/4/2010APASS
DetailsForrest France
Corrections finished, life safety final approved for the scope of this permit.
Zoning Approval Temp5/4/20105/4/20105/4/2010 PASS
DetailsJosh Wilson
Temporary occupnacy through December 4, 2010. A $41,195.00 surety for landscaping has been submitted.
FIRE-Final Inspection4/9/20104/13/20104/13/2010AFAIL
DetailsForrest France
Missing one EM light per plan sheet E2.1, door hardware at two locations is not yet installed due to paint finishes underway, building address numbers are not posted. Note, the PFE is due annual certification this month.
FIRE-Conference4/12/20104/12/20104/12/2010ADONE
DetailsForrest France
Regarding final inspection.
BLD-Energy code compliance2/17/20102/17/20102/17/2010APASS
DetailsJim Storey
BLD-Framing/Rough-in1/20/20101/21/20101/21/2010APASS
DetailsJim Storey
James Phone #: ###-####
BLD-Aging Inspection1/11/20101/11/20101/11/2010ADONE
DetailsForrest France
Work in progress
BLD-Framing/Rough-in12/21/200912/21/200912/21/2009PPASS
DetailsJim Storey
Shear inspection please-James Phone #: ###-#### nail insp ok to cover w/gyp. as per plan
BLD-Foundation10/27/200910/27/200910/27/2009PPASS
DetailsMike Jordan
chris Phone #: ###-####. Column pad footings for bldg. #2. ok.
BLD-Foundation10/22/200910/23/200910/23/2009APART
DetailsJim Storey
chris - wall - steel Phone #: ###-#### ok pending ab and pad ft.
BLD-Footing10/20/200910/21/200910/21/2009APASS
DetailsJim Storey
Chris Phone #: ###-####
BLD-Aging Inspection10/6/200910/6/200910/6/2009 PASS
DetailsJim Storey
wip
Plan resubmittals received  7/20/2009  
DetailsTisha Gallop
Received deferred resubmittal: four copy of Site Grading; taken to Brian Murphy
Issue PAID IN FULL permit  7/7/2009 DONE
Telephone call  6/24/2009 DONE
DetailsBarbara Stitt
Called Dan Pritchard and faxed him a breakdown of fees for individual buildings and explained to him that we need ACHD information///6-24-09 @ 10:00am BAS
Permit Ready to Issue  6/24/2009 DONE
Routing - PLAN CHECK6/19/2009 6/22/2009 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  6/22/2009 DONE
DetailsJohn Menard
Print Occupancy Form  6/22/2009 DONE
Plan assigned to (JCM)4/16/2009 6/22/2009 PASS
DetailsJohn Menard
6/22/2009 11:20:38 JCM - activity updated through activity BLDA022 from case BLD09-00516.
Routing - PUBLIC WORKS6/12/2009 6/19/2009 PASS
DetailsBeverly Hall
Routing - PLUMBING6/19/2009 6/19/2009 PASS
DetailsBill VanDegrift
per plans and 2003 upc
Plan resubmittals received  6/18/2009 DONE
received 5 copies of Site Grading inserted by Angela from Engineering & Waste Solutions. Plans taken back by Brian M.
Routing PW Street Lights6/18/2009 6/18/2009 PASS
DetailsHank Alarcon
Routing PW Drainage6/12/2009 6/18/2009 PASS
Details
Plan resubmittals received  6/16/2009  
DetailsAlexandra L. DeYoung
Rec'd two copies of sheets EN-1; A-2.1; A-3.2; M-1; M-2; M-3; M-4; M-5; two copies of eng. calcs and two copies of response letter- inserted by architect and taken back to Brian Murphy
Routing - PLAN CHECK6/12/2009 6/12/2009 FAIL
DetailsJohn Menard
Plan resubmittals requested  6/12/2009 DONE
DetailsJohn Menard
E-mailed the architect a copy of a letter requesting additional revisions. JCM
Routing - PUBLIC WORKS6/3/2009 6/12/2009 FAIL
DetailsConnie Baumgartner
Routing PW Drainage6/4/2009 6/11/2009 FAIL
DetailsBrian Murphy
need geotech and revisions bmurphy ###-####
Routing PW Sewer Design4/24/2009 6/4/2009 PASS
DetailsJon R. Gunnerson
Connect onto sanitary sewer seervice.
Routing - PLAN CHECK6/2/2009 6/3/2009  
DetailsJohn Menard
Routing PW Solid Waste4/28/2009 6/3/2009 PASS
DetailsPeter J. McCullough
Routing - FIRE5/28/2009 6/2/2009 PASS
DetailsScott Arellano
No changes
Plan Reviewer's activity  5/28/2009 PASS
DetailsJohn Menard
Reviewed and approved structural revisions. JCM
Plan resubmittals requested  5/28/2009 DONE
DetailsJohn Menard
E-mailed the architect a letter requesting additional revisions. JCM
Routing - PLAN CHECK5/11/2009 5/28/2009 FAIL
DetailsJohn Menard
Plan resubmittals received  5/26/2009  
DetailsTisha Gallop
Received trasmittals to structural and fire, three copies of revised structural calcs, and two copies of ESC narrative, Storm Drain Report, response comments from engineering company, plan sheets G-1, EN-1, 1, 2, 3, 4, L1.1, L1.2, SD-2, A-1.1, A-1.2, A-1.3, A-2.1, A-3.1, A-3.2, A-3.3, A-3.4, S1.1, S1.2, S1.3, S1.4, S1.5, S1.6, S2.1, S2.2, S2.3, M-1, M-2, M-3, M-4, M-5, E3.1, E3.2, four copies of sheet SD-1; inserted by LEG and taken back to John Menard
Route to Impact Fee Review5/6/20095/11/20095/15/2009 PASS
DetailsCindy M. Gould
Routing - FIRE5/6/20095/6/20095/11/2009 PASS
DetailsScott Arellano
Attached IFC comments to plans.
1st review completed  5/11/2009 FAIL
Failed Public Works, Structural, Plumbing, Planning, Plan Check
Plan resubmittals requested  5/6/2009 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural and nonstructural plan reviews requesting revisions. JCM
Routing - PLAN CHECK5/4/2009 5/6/2009 FAIL
DetailsJohn Menard
Routing Off Site - STRUCTURAL4/17/2009 5/4/2009 FAIL
DetailsJohn Menard
Routing - PLANNING5/1/2009 5/4/2009 PASS
DetailsJosh Wilson
DRH08-00400 Josh W.
Routing - PLUMBING4/30/2009 5/1/2009 FAIL
DetailsBill VanDegrift
provide gas tight lids for the septic tank and pump chamber. pump chamber requires a min. 2" vent. cleanouts required on the pressure sewer every 100'. provide services to building 2 (SHOP). complete public works sewer design review prior to plumbing review approval.
Routing - Erosion and Sediment4/29/2009 4/30/2009 PASS
DetailsSteven Webb
ESC plan approved with attached conditions. ESC09-00182
Routing - PUBLIC WORKS4/17/2009 4/29/2009 FAIL
DetailsConnie Baumgartner
Routing PW Street Lights4/27/2009 4/28/2009 FAIL
DetailsHank Alarcon
Routing PW Sewer Rating4/28/2009 4/28/2009 PASS
DetailsConnie Baumgartner
Routing PW Drainage4/20/2009 4/24/2009 FAIL
DetailsBrian Murphy
NEEDS REVISIONS. BRIAN MURPHY ###-####
Telephone call  4/17/2009 DONE
DetailsTisha Gallop
called Action Couriers for pick up
Routing - PLANNING Land Div4/17/2009 4/17/2009 PASS
DetailsDave Abo
Application received 4/16/20094/16/2009 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  4/16/2009  
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  4/16/2009  
DetailsTisha Gallop
Pending Assignment by JCM4/16/2009 4/16/2009 BLDA
DetailsJohn Menard
4/16/2009 16:13:55 JCM - activity updated through activity BLDA166 from case BLD09-00516.
PubWorks Occupancy Approval8/31/20108/31/2010  DONE
DetailsTerry Records