Third Notice | | 11/8/2010 | 12/8/2010 | | DONE |
|
|
|
|
Third Notice | | 10/12/2010 | 10/25/2010 | | DONE |
|
|
|
faxed
|
Second Notice | | 10/4/2010 | 10/7/2010 | | DONE |
|
|
|
|
First Notice | | 9/17/2010 | 9/24/2010 | | DONE |
|
|
|
|
Permanent Occupancy | | | 9/7/2010 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 9/1/2010 | 9/1/2010 | 9/1/2010 | P | PASS |
Jim Storey
|
|
|
James Phone #: ###-####
|
Zoning Approval | 9/1/2010 | 9/1/2010 | 9/1/2010 | | PASS |
Josh Wilson
|
|
|
|
BLD-Aging Inspection | 7/6/2010 | 7/6/2010 | 7/8/2010 | | PASS |
Jim Storey
|
|
|
temp ok
|
BLD-Final | 5/6/2010 | 5/6/2010 | 5/6/2010 | A | PASS |
Jim Storey
|
|
|
temp ok
|
BLD-Final | 5/5/2010 | 5/5/2010 | 5/6/2010 | P | DEFR |
Jim Storey
|
|
|
james Phone #: ###-#### out of time
|
FIRE-Final Inspection | 5/3/2010 | 5/4/2010 | 5/4/2010 | A | PASS |
Forrest France
|
|
|
Corrections finished, life safety final approved for the scope of this permit.
|
Zoning Approval Temp | 5/4/2010 | 5/4/2010 | 5/4/2010 | | PASS |
Josh Wilson
|
|
|
Temporary occupnacy through December 4, 2010. A $41,195.00 surety for landscaping has been submitted.
|
FIRE-Final Inspection | 4/9/2010 | 4/13/2010 | 4/13/2010 | A | FAIL |
Forrest France
|
|
|
Missing one EM light per plan sheet E2.1, door hardware at two locations is not yet installed due to paint finishes underway, building address numbers are not posted. Note, the PFE is due annual certification this month.
|
FIRE-Conference | 4/12/2010 | 4/12/2010 | 4/12/2010 | A | DONE |
Forrest France
|
|
|
Regarding final inspection.
|
BLD-Energy code compliance | 2/17/2010 | 2/17/2010 | 2/17/2010 | A | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 1/20/2010 | 1/21/2010 | 1/21/2010 | A | PASS |
Jim Storey
|
|
|
James Phone #: ###-####
|
BLD-Aging Inspection | 1/11/2010 | 1/11/2010 | 1/11/2010 | A | DONE |
Forrest France
|
|
|
Work in progress
|
BLD-Framing/Rough-in | 12/21/2009 | 12/21/2009 | 12/21/2009 | P | PASS |
Jim Storey
|
|
|
Shear inspection please-James Phone #: ###-#### nail insp ok to cover w/gyp. as per plan
|
BLD-Foundation | 10/27/2009 | 10/27/2009 | 10/27/2009 | P | PASS |
Mike Jordan
|
|
|
chris Phone #: ###-####. Column pad footings for bldg. #2. ok.
|
BLD-Foundation | 10/22/2009 | 10/23/2009 | 10/23/2009 | A | PART |
Jim Storey
|
|
|
chris - wall - steel Phone #: ###-#### ok pending ab and pad ft.
|
BLD-Footing | 10/20/2009 | 10/21/2009 | 10/21/2009 | A | PASS |
Jim Storey
|
|
|
Chris Phone #: ###-####
|
BLD-Aging Inspection | 10/6/2009 | 10/6/2009 | 10/6/2009 | | PASS |
Jim Storey
|
|
|
wip
|
Plan resubmittals received | | | 7/20/2009 | | |
Tisha Gallop
|
|
|
Received deferred resubmittal: four copy of Site Grading; taken to Brian Murphy
|
Issue PAID IN FULL permit | | | 7/7/2009 | | DONE |
|
|
|
|
Telephone call | | | 6/24/2009 | | DONE |
Barbara Stitt
|
|
|
Called Dan Pritchard and faxed him a breakdown of fees for individual buildings and explained to him that we need ACHD information///6-24-09 @ 10:00am BAS
|
Permit Ready to Issue | | | 6/24/2009 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/19/2009 | | 6/22/2009 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/22/2009 | | DONE |
John Menard
|
|
|
|
Print Occupancy Form | | | 6/22/2009 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 4/16/2009 | | 6/22/2009 | | PASS |
John Menard
|
|
|
6/22/2009 11:20:38 JCM - activity updated through activity BLDA022 from case BLD09-00516.
|
Routing - PUBLIC WORKS | 6/12/2009 | | 6/19/2009 | | PASS |
Beverly Hall
|
|
|
|
Routing - PLUMBING | 6/19/2009 | | 6/19/2009 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Plan resubmittals received | | | 6/18/2009 | | DONE |
|
|
|
received 5 copies of Site Grading inserted by Angela from Engineering & Waste Solutions. Plans taken back by Brian M.
|
Routing PW Street Lights | 6/18/2009 | | 6/18/2009 | | PASS |
Hank Alarcon
|
|
|
|
Routing PW Drainage | 6/12/2009 | | 6/18/2009 | | PASS |
|
|
|
|
Plan resubmittals received | | | 6/16/2009 | | |
Alexandra L. DeYoung
|
|
|
Rec'd two copies of sheets EN-1; A-2.1; A-3.2; M-1; M-2; M-3; M-4; M-5; two copies of eng. calcs and two copies of response letter- inserted by architect and taken back to Brian Murphy
|
Routing - PLAN CHECK | 6/12/2009 | | 6/12/2009 | | FAIL |
John Menard
|
|
|
|
Plan resubmittals requested | | | 6/12/2009 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of a letter requesting additional revisions. JCM
|
Routing - PUBLIC WORKS | 6/3/2009 | | 6/12/2009 | | FAIL |
Connie Baumgartner
|
|
|
|
Routing PW Drainage | 6/4/2009 | | 6/11/2009 | | FAIL |
Brian Murphy
|
|
|
need geotech and revisions bmurphy ###-####
|
Routing PW Sewer Design | 4/24/2009 | | 6/4/2009 | | PASS |
Jon R. Gunnerson
|
|
|
Connect onto sanitary sewer seervice.
|
Routing - PLAN CHECK | 6/2/2009 | | 6/3/2009 | | |
John Menard
|
|
|
|
Routing PW Solid Waste | 4/28/2009 | | 6/3/2009 | | PASS |
Peter J. McCullough
|
|
|
|
Routing - FIRE | 5/28/2009 | | 6/2/2009 | | PASS |
Scott Arellano
|
|
|
No changes
|
Plan Reviewer's activity | | | 5/28/2009 | | PASS |
John Menard
|
|
|
Reviewed and approved structural revisions. JCM
|
Plan resubmittals requested | | | 5/28/2009 | | DONE |
John Menard
|
|
|
E-mailed the architect a letter requesting additional revisions. JCM
|
Routing - PLAN CHECK | 5/11/2009 | | 5/28/2009 | | FAIL |
John Menard
|
|
|
|
Plan resubmittals received | | | 5/26/2009 | | |
Tisha Gallop
|
|
|
Received trasmittals to structural and fire, three copies of revised structural calcs, and two copies of ESC narrative, Storm Drain Report, response comments from engineering company, plan sheets G-1, EN-1, 1, 2, 3, 4, L1.1, L1.2, SD-2, A-1.1, A-1.2, A-1.3, A-2.1, A-3.1, A-3.2, A-3.3, A-3.4, S1.1, S1.2, S1.3, S1.4, S1.5, S1.6, S2.1, S2.2, S2.3, M-1, M-2, M-3, M-4, M-5, E3.1, E3.2, four copies of sheet SD-1; inserted by LEG and taken back to John Menard
|
Route to Impact Fee Review | 5/6/2009 | 5/11/2009 | 5/15/2009 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - FIRE | 5/6/2009 | 5/6/2009 | 5/11/2009 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans.
|
1st review completed | | | 5/11/2009 | | FAIL |
|
|
|
Failed Public Works, Structural, Plumbing, Planning, Plan Check
|
Plan resubmittals requested | | | 5/6/2009 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the structural and nonstructural plan reviews requesting revisions. JCM
|
Routing - PLAN CHECK | 5/4/2009 | | 5/6/2009 | | FAIL |
John Menard
|
|
|
|
Routing Off Site - STRUCTURAL | 4/17/2009 | | 5/4/2009 | | FAIL |
John Menard
|
|
|
|
Routing - PLANNING | 5/1/2009 | | 5/4/2009 | | PASS |
Josh Wilson
|
|
|
DRH08-00400 Josh W.
|
Routing - PLUMBING | 4/30/2009 | | 5/1/2009 | | FAIL |
Bill VanDegrift
|
|
|
provide gas tight lids for the septic tank and pump chamber. pump chamber requires a min. 2" vent. cleanouts required on the pressure sewer every 100'. provide services to building 2 (SHOP). complete public works sewer design review prior to plumbing review approval.
|
Routing - Erosion and Sediment | 4/29/2009 | | 4/30/2009 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions. ESC09-00182
|
Routing - PUBLIC WORKS | 4/17/2009 | | 4/29/2009 | | FAIL |
Connie Baumgartner
|
|
|
|
Routing PW Street Lights | 4/27/2009 | | 4/28/2009 | | FAIL |
Hank Alarcon
|
|
|
|
Routing PW Sewer Rating | 4/28/2009 | | 4/28/2009 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Drainage | 4/20/2009 | | 4/24/2009 | | FAIL |
Brian Murphy
|
|
|
NEEDS REVISIONS. BRIAN MURPHY ###-####
|
Telephone call | | | 4/17/2009 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for pick up
|
Routing - PLANNING Land Div | 4/17/2009 | | 4/17/2009 | | PASS |
Dave Abo
|
|
|
|
Application received | | 4/16/2009 | 4/16/2009 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/16/2009 | | |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/16/2009 | | |
Tisha Gallop
|
|
|
|
Pending Assignment by JCM | 4/16/2009 | | 4/16/2009 | | BLDA |
John Menard
|
|
|
4/16/2009 16:13:55 JCM - activity updated through activity BLDA166 from case BLD09-00516.
|
PubWorks Occupancy Approval | 8/31/2010 | 8/31/2010 | | | DONE |
Terry Records
|
|
|
|