BLD-Final | 9/9/2009 | 9/9/2009 | 9/9/2009 | P | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 9/9/2009 | 9/9/2009 | 9/9/2009 | P | PASS |
Jim Storey
|
|
|
|
Zoning Approval | 9/9/2009 | 9/9/2009 | 9/9/2009 | | DONE |
Josh Wilson
|
|
|
Ok per DRH09-00029.
|
BLD-Conference | 9/8/2009 | 9/8/2009 | 9/8/2009 | P | FAIL |
Jim Storey
|
|
|
andy Phone #: ###-#### need gyp under stairs and protect vappor bairrior to meet flame spread in future bath rm. down stairs.
|
BLD-Energy code compliance | 7/22/2009 | 7/22/2009 | 7/22/2009 | P | PASS |
Jim Storey
|
|
|
Andy Phone #: ###-####
|
BLD-Energy code compliance | 7/20/2009 | 7/21/2009 | 7/22/2009 | P | NR |
Jim Storey
|
|
|
Andy Phone #: ###-####
|
BLD-Framing/Rough-in | 7/20/2009 | 7/20/2009 | 7/20/2009 | P | PART |
Jim Storey
|
|
|
andy Phone #: ###-#### pending plm c/n frame ok to insulate.
|
BLD-Framing/Rough-in | 7/14/2009 | 7/14/2009 | 7/14/2009 | P | PASS |
Jim Storey
|
|
|
Andy-Fire wall inspection please Phone #: ###-#### soffit gyp ok to cover.
|
BLD-Footing | 5/19/2009 | 5/20/2009 | 5/20/2009 | A | PASS |
Jim Storey
|
|
|
Andy Phone #: ###-#### garage
|
BLD-Foundation | 5/12/2009 | 5/13/2009 | 5/13/2009 | A | PASS |
Tom Arcoraci
|
|
|
andy Phone #: ###-####
|
BLD-Foundation | 5/11/2009 | 5/12/2009 | 5/12/2009 | P | CANC |
Jim Storey
|
|
|
andy Phone #: ###-####
|
BLD-Footing | 5/11/2009 | 5/11/2009 | 5/11/2009 | P | PASS |
Jim Storey
|
|
|
Andy Phone #: ###-####
|
BLD-Conference | 5/7/2009 | 5/7/2009 | 5/7/2009 | P | PASS |
Jim Storey
|
|
|
andy Phone #: ###-####
|
Inspection Record Card- Bld | | | 5/1/2009 | | DONE |
|
|
|
|
Telephone call | | | 5/1/2009 | | DONE |
|
|
|
t/c w andy at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 5/1/2009 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/1/2009 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (BSP) | 4/17/2009 | 4/17/2009 | 4/30/2009 | | PASS |
Ben S. Pavelka
|
|
|
4/30/2009 09:55:40 BSP - activity updated through activity BLDA022 from case BLD09-00538.
|
Routing - PLAN CHECK | 4/28/2009 | | 4/30/2009 | | PASS |
Ben S. Pavelka
|
|
|
|
1st review completed | | | 4/30/2009 | | DONE |
Ben S. Pavelka
|
|
|
Called designer to request a new roof layout that will show what the roof will be constructed of. 4-29-09 BSP
|
Case Summary (BLD) | | | 4/30/2009 | | DONE |
Ben S. Pavelka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/30/2009 | | DONE |
Ben S. Pavelka
|
|
|
|
Route to Impact Fee Review | 4/17/2009 | 4/22/2009 | 4/29/2009 | | PASS |
Cindy M. Gould
|
|
|
House is offset by removal of an existing mobil home Ada county parcel #MEMP1560801.
|
Routing - PUBLIC WORKS | 4/27/2009 | | 4/28/2009 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING | 4/27/2009 | | 4/27/2009 | | PASS |
Sarah Schafer
|
|
|
Approve the site plan and elevations. The residential floor area shall not exceed the 55% allowed by ordinance. Currently no additional square feet can be added to the property.
|
Routing - PLANNING | 4/20/2009 | | 4/23/2009 | | FAIL |
Sarah Schafer
|
|
|
Routed to Sarah Schafer DRH09-00029
Square footage added to the structure. Exceeds the ordinance allowance.
I have called and left a message on Evelyn Grime's phone (###-####) detailing the problem and will try to call again on 4/23/09.
The plans were placed in the "Failed Plans" drawer behind the reception area.
|
Meeting | | | 4/23/2009 | | DONE |
Sarah Schafer
|
|
|
I met with the applicant's rep today. She will be getting me the calculations for the square footages to verify they don't exceed the ordinance requirements.
|
Routing - Addressing | 4/17/2009 | | 4/20/2009 | | PASS |
Chris Pichardo
|
|
|
|
Application received | | 4/17/2009 | | | |
|
|
|
|