BLD-Other | 8/11/2011 | 8/11/2011 | 8/11/2011 | P | PASS |
Dave Hannah
|
|
|
BOB Phone #: ###-#### everthing ok gate to the top of the tower is temperary at time of insection it was sealed off and locked up.
|
DOC - Permit Finaled | 8/11/2011 | 8/11/2011 | 8/11/2011 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 8/2/2011 | 8/3/2011 | 8/3/2011 | A | PART |
Dave Hannah
|
|
|
Bob Phone #: ###-#### ok to move in furniture needs gate to stop access to roof
|
BLD-Aging Inspection | 4/25/2011 | 4/25/2011 | 4/26/2011 | | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 2/22/2011 | 2/22/2011 | 2/22/2011 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 2/18/2011 | 2/22/2011 | 2/22/2011 | A | PASS |
Dave Hannah
|
|
|
Bob Phone #: ###-####
|
BLD-Framing/Rough-in | 2/2/2011 | 2/3/2011 | 2/3/2011 | A | PART |
Dave Hannah
|
|
|
bob Phone #: ###-#### ok to start to insulate fire blocking will need to be checked after the house is finished
|
BLD-Aging Inspection | 1/17/2011 | 1/17/2011 | 1/17/2011 | | PASS |
Dave Hannah
|
|
|
|
BLD-Footing | 11/16/2010 | 11/16/2010 | 11/16/2010 | P | PASS |
Dave Hannah
|
|
|
Bob Phone #: ###-#### ftgs between house and garage
|
BLD-Other | 10/25/2010 | 10/25/2010 | 10/25/2010 | A | PASS |
Dave Hannah
|
|
|
work in progress
|
BLD-Aging Inspection | 10/25/2010 | 10/25/2010 | 10/25/2010 | | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 8/25/2010 | 8/25/2010 | 8/25/2010 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/24/2010 | 8/24/2010 | 8/25/2010 | | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 6/24/2010 | 6/24/2010 | 6/24/2010 | P | PASS |
Dave Hannah
|
|
|
Bob Phone #: ###-#### walked project with new contractor
|
BLD-Aging Inspection | 6/1/2010 | 6/1/2010 | 6/1/2010 | | PASS |
Dave Hannah
|
|
|
|
MISC ACTIONS | | | 4/13/2010 | | DONE |
Tisha Gallop
|
|
|
received fax from owner Bloomco no longer on project and to transfer GC to owner Timothy Barber, see fax and GC form in documents.
|
Case Summary (BLD) | | | 4/13/2010 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Aging Inspection | 4/1/2010 | 4/1/2010 | 4/1/2010 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 1/29/2010 | 1/29/2010 | 2/1/2010 | | PASS |
Dave Hannah
|
|
|
work in progress
|
BLD-Other | 9/4/2009 | 9/4/2009 | 9/4/2009 | P | PASS |
Dave Hannah
|
|
|
Jerry- rebar Phone #: ###-#### window wells ok to pour
|
BLD-Footing | 8/26/2009 | 8/26/2009 | 8/27/2009 | P | PART |
Dave Hannah
|
|
|
Chuck Phone #: ###-#### ok to pour window well ftgs
|
BLD-Framing/Rough-in | 8/12/2009 | 8/13/2009 | 8/13/2009 | A | PART |
Dave Hannah
|
|
|
doug Phone #: ###-#### east side of garage wall ok to cover also ceiling over stairs
|
BLD-Foundation | 7/27/2009 | 7/27/2009 | 7/27/2009 | P | PART |
Jim Storey
|
|
|
Chuck-late afternoon please Phone #: ###-#### west and south round walls ok
|
BLD-Foundation | 7/16/2009 | 7/17/2009 | 7/17/2009 | A | PART |
Dave Hannah
|
|
|
chuck - pouring at 10 Phone #: ###-#### ok to pour south half
|
BLD-Footing | 7/2/2009 | 7/2/2009 | 7/6/2009 | A | PASS |
Dave Hannah
|
|
|
Chuck Phone #: ###-####
|
BLD-Footing | 6/29/2009 | 7/1/2009 | 7/2/2009 | P | NR |
Dave Hannah
|
|
|
Chuck Phone #: ###-####
|
BLD-Footing | 6/26/2009 | 6/29/2009 | 6/29/2009 | A | CANC |
Dave Hannah
|
|
|
Chuck-late am please Phone #: ###-####
|
BLD-Concrete | 6/25/2009 | 6/25/2009 | 6/25/2009 | P | CANC |
Dave Hannah
|
|
|
chuck - late afternoon please Phone #: ###-####
|
BLD-Concrete | 6/23/2009 | 6/24/2009 | 6/25/2009 | A | PART |
Dave Hannah
|
|
|
chuck - late morning please Phone #: ###-#### cmu wall ok to grout
|
BLD-Other | 6/22/2009 | 6/23/2009 | 6/23/2009 | A | PART |
Dave Hannah
|
|
|
Chuck Phone #: ###-#### cmu wall 8 to 12 ft
|
BLD-Foundation | 6/19/2009 | 6/22/2009 | 6/23/2009 | A | PART |
Dave Hannah
|
|
|
Chuck--rebar inspection please Phone #: ###-#### cmu wall 4to 8ft
|
BLD-Concrete | 6/18/2009 | 6/19/2009 | 6/19/2009 | A | PART |
Dave Hannah
|
|
|
chuck - masonary wall - as early as possible Phone #: ###-#### first 4 ft of cmu wall ok to grout
|
BLD-Foundation | 6/3/2009 | 6/4/2009 | 6/5/2009 | A | PASS |
Dave Hannah
|
|
|
chuck - stemwall Phone #: ###-#### ok to pour garage stem wall
|
BLD-Footing | 5/29/2009 | 6/1/2009 | 6/2/2009 | P | PART |
Dave Hannah
|
|
|
charles bloom ###-#### garage ftgs ok to pour
|
Issue PAID IN FULL permit | | | 5/27/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Permit Ready to Issue | | | 5/26/2009 | | |
|
|
|
|
Telephone call | | | 5/26/2009 | | DONE |
Barbara Stitt
|
|
|
Called and left voice message for Jeff that permit is ready, need RP information and fees due///5-26-09 @ 1:39pm BAS
|
Route to Impact Fee Review | 5/22/2009 | 5/26/2009 | 5/22/2009 | | PASS |
Cindy M. Gould
|
|
|
|
Plan assigned to (CDM) | 5/22/2009 | 5/22/2009 | 5/22/2009 | | DONE |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 5/22/2009 | | DONE |
|
|
|
|
1st review completed | | | 5/22/2009 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/22/2009 | | |
|
|
|
|
Routing - PLAN CHECK | 5/13/2009 | | 5/22/2009 | | PASS |
Carl D Madsen
|
|
|
|
Inspection Record Card- Bld | | | 5/22/2009 | | DONE |
|
|
|
|
Routing - PLANNING | 5/13/2009 | | 5/13/2009 | | PASS |
Colleen T Carroll
|
|
|
ADU not approved at this time, will submit at a later date.
|
Routing - PUBLIC WORKS | 5/13/2009 | | 5/13/2009 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | 4/27/2009 | 4/27/2009 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/27/2009 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLANNING | 4/27/2009 | | 4/27/2009 | | FAIL |
Colleen T Carroll
|
|
|
Spoke with Wayne with Epikos Planning + Architecture. They will be submitting a ADU application.
|
Routing - Addressing | 4/27/2009 | | 4/27/2009 | | PASS |
April Wing
|
|
|
|