(BOISE CITY LIBRARY - Main Entrance Ramp) Permit is to demo existing ramp and stair and install new ramp and stairs. Approval per approved plans on file and engineering attached to plans. Work to include: demolition of existing entrance steps and ramp, construction of new entrance steps and ramps, installation of new lighting for steps and ramps, and installation of a snow-melt system for new steps and ramps. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 7/7/20107/9/2010 DONE
Third Notice 6/10/20106/24/2010 DONE
faxed
Telephone call  6/1/2010 DONE
DetailsTisha Gallop
received vm the gentleman that usually does the FV for Panorama Consturction no longer works there, they are moving offices and will get the FV to me next week. If needed contact is Jeff ###-####
Third Notice 5/9/20105/27/2010 DONE
faxed
Second Notice 4/24/20105/4/2010 DONE
First Notice3/25/20103/25/20104/14/2010 DONE
DetailsDave Hannah
BLD-Final3/25/20103/25/20103/25/2010APASS
DetailsDave Hannah
DOC - Permit Finaled3/25/20103/25/20103/25/2010PPASS
DetailsDave Hannah
BLD-Other5/5/20095/6/20095/6/2009APASS
DetailsDave Hannah
Nate- wall Phone #: ###-####
Plan resubmittals received  5/5/2009 DONE
Received 1 transmittal,1 calc sent to Tim W.
BLD-Concrete4/28/20094/29/20094/29/2009APASS
DetailsDave Hannah
Jeff Phone #: ###-#### ok to pour ftgs
Application received 4/28/20094/28/2009 DONE
DetailsDarla L Downs
Plans ACCEPTED BY PLAN TECH  4/28/2009 DONE
Over the counter permit per Tim Woodard
Plan assigned to (TLW)4/28/2009 4/28/2009 PASS
DetailsTim L. Woodard
4/28/2009 15:04:35 TLW - activity updated through activity BLDA022 from case BLD09-00597.
Routing - PLAN CHECK4/28/2009 4/28/2009 PASS
DetailsTim L. Woodard
Plans approved per redlines on approved plans. TLW
Routing - Erosion and Sediment4/28/2009 4/28/2009 PASS
DetailsTim L. Woodard
An ESC permit was previously pulled on this project. ESC09-00202.
Routing - PLANNING4/28/2009 4/28/2009 PASS
DetailsTim L. Woodard
Andrea Tuning issued the czc over the counter for this project.
1st review completed  4/28/2009 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  4/28/2009 DONE
DetailsTim L. Woodard
Case Summary (BLD)  4/28/2009 DONE
DetailsTim L. Woodard
Issue PAID IN FULL permit  4/28/2009 DONE
Permit Ready to Issue  4/28/2009 DONE
DetailsDarla L Downs
CHANGE STATUS TO (ISS)  4/28/2009 DONE
DetailsDarla L Downs