Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD09-00613
StatusFinaled
Name JOHN CUNNINGHAM
Site Address 245 S CAPITOL BLVD
Project NameGrove Hotel
Customer Number 
ePlanReviewNo
Description
**(PIZZA STAND)** Application for inspection to determine requirements for issuance of a Certificate of Occupancy for an existing 800 square foot kitchen (Pizza Stand) off the arena seating area. NO NEW WORK IS AUTHORIZED UNDER THIS PERMIT, EXCEPT THE PATIAL HIEGHT WALL ONTOP OF THE EXISTING COUNTER BECAUSE IT WAS LESS THAN 500 DOLLARS TO CONSTRUCT. This space was created under BLD97-01902. There are no changes to occupancy or use under this permit. TLW
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  10/8/2009 DONE
BLD-Final10/7/200910/7/200910/7/2009PPASS
DetailsDave Hannah
This temp occupancy is about to expire and Fire passed 10-6-09 could you please check it out and see if we can issue perm occ? Barb Phone #: ###-####
FIRE-Final Inspection10/6/200910/6/200910/6/2009PPASS
DetailsForrest France
Items on correction notice are finished, fire life safety finaled.
Temporary Occupancy5/5/20098/3/20095/5/2009 DONE
DetailsDarla L Downs
Temporary Occupancy5/5/20098/3/20095/5/2009 DONE
DetailsDarla L Downs
BLD-Final4/30/20095/1/20095/1/2009PPART
DetailsDave Hannah
John If possible please do this inspection around 1pm as he has a meeting with Mr Bieter at 3:30 Thanks Phone #: ###-#### ok for temp occ
FIRE-Final Inspection4/30/20095/1/20095/1/2009APART
DetailsTroy Cobbley
A temporary occupancy was given for the fire issues. See the city approved review notes for the corrections that are needed. That include providing the suite number, repair or remove the exit sign and emergency light. Also remove the exit sign that directs people to the new tenant space 180.
Permit Ready to Issue  4/30/2009 DONE
DetailsDarla L Downs
CHANGE STATUS TO (ISS)  4/30/2009 DONE
DetailsDarla L Downs
Plan assigned to (TLW)4/29/2009 4/30/2009 PASS
DetailsTim L. Woodard
4/30/2009 16:10:05 TLW - activity updated through activity BLDA022 from case BLD09-00613.
Routing - PLAN CHECK4/30/2009 4/30/2009 PASS
DetailsTim L. Woodard
Per redline of non-combustable material in partial hieght framed wall. TLW
Routing - PUBLIC WORKS4/29/2009 4/30/2009 PASS
DetailsTim L. Woodard
Signed off on attached rating worksheet. TLW
Routing PW Sewer Rating4/30/2009 4/30/2009 PASS
DetailsLouise Waldorf
1st review completed  4/30/2009 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  4/30/2009 DONE
DetailsTim L. Woodard
Case Summary (BLD)  4/30/2009 DONE
DetailsTim L. Woodard
Print Occupancy Form  4/30/2009 DONE
Issue PAID IN FULL permit  4/30/2009 DONE
First Notice 10/18/2009   
Application received 4/29/2009