Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD09-00614
StatusFinaled
Name HILL CONSTRUCTION CO
Site Address 7311 W POTOMAC DR
Project NameBOISE POLICE ASSOCIATION
Customer Number 
ePlanReviewNo
Description
(BOISE POLICE ASSOCIATION - CLUBHOUSE AND EVENT CENTER) A fire sprinkler system is required to be installed throughout this building. To convert an existing 13,087 square foot office building (12,437 square feet inside and 650 square feet outside) to an event center. The basement has a total floor area of about 6,227 square feet and the 1st story has a total floor area of about 6,860 square feet (6,210 square feet inside and 650 square feet outside). The work is to include 4 restrooms accessible to the disabled, an interior bearing wall in the basement with a new concrete footing, altered open web floor trusses to shorten their span, two glu-lam roof beams, a tube steel column, and interior finishes. Special inspection is required for welding and for the modifications to the open web floor trusses. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. In conjunction with this permit, this building is required to be fully fire sprinklered per NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  6/6/2012 DONE
First Notice 12/4/200912/30/2009 DONE
Permanent Occupancy  11/25/2009 DONE
BLD-Final11/24/200911/24/200911/24/2009PPASS
DetailsTom Arcoraci
request late pm, please call 45-30 min prior///Troy Blanton Phone #: ###-####
BLD-Final10/27/200910/28/200910/28/2009ANR
DetailsTom Arcoraci
Troy Blanton ###-#### needs handrails completed
PubWorks Occupancy Approval10/28/200910/28/200910/28/2009 DONE
DetailsTiffany Lowery
FIRE-Final Inspection10/26/200910/27/200910/27/2009APASS
DetailsTroy Cobbley
Life safety passed.
Zoning Approval10/12/200910/12/200910/12/2009 PASS
DetailsJosh Wilson
BLD-Other9/30/200910/1/200910/1/2009APASS
DetailsTom Arcoraci
Troy Phone #: ###-#### grid maintained as built
BLD-Framing/Rough-in8/28/20098/31/20098/31/2009APART
DetailsJim Storey
TROY Phone #: ###-#### 450 c/n still pending papper work to recieve at next insp. header ok. sheer wall with staples ok if papper work is 8 and 8 oc/ lvl just fied on plan note as opsunal.
BLD-Framing/Rough-in8/25/20098/26/20098/26/2009PPART
DetailsMike Jordan
Troy Phone #: ###-####. Interior wood framed walls. Need RFI from engineer for shearwall attachment in basement. Noted descrepency on plans and fasterners to be used not listed. Also needs detailfrom engineer justifing use os wood framed wall in leiu of LVL as shown on approved plans.
BLD-Footing7/30/20097/31/20097/31/2009PPASS
DetailsJim Storey
troy Phone #: ###-#### - early afternoon please center bearing ft ok need si for 3000psi concrete pending.
Telephone call  7/29/2009 DONE
Details
left vm for mike fairchild at ###-#### - permit ready and fees given
Permit Ready to Issue  7/29/2009 DONE
Details
Issue PAID IN FULL permit  7/29/2009 DONE
Routing - PLAN CHECK7/28/2009 7/28/2009 DONE
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  7/28/2009 DONE
Print Occupancy Form  7/28/2009 DONE
Details
Routing - PUBLIC WORKS7/27/2009 7/28/2009 PASS
DetailsBeverly Hall
Revised drainage plans submitted. Took to Bev.
Routing PW Drainage7/27/2009 7/28/2009 PASS
DetailsBrian Murphy
Plan assigned to (CJW)5/19/2009 7/28/2009 PASS
DetailsCarl Westfall
7/28/2009 13:26:32 CJW - activity updated through activity BLDA022 from case BLD09-00614.
Plan resubmittals received  7/27/2009 DONE
received 2 O& M plan,and 5 copies of sheet SW-100 taken to Carl W.
Routing - PLAN CHECK7/15/2009 7/27/2009 PASS
DetailsCarl Westfall
Drawings approved on July 22, 2009 after the resubmittal review.
Routing - PLANNING7/15/2009 7/15/2009 PASS
DetailsJosh Wilson
OK per DRH09-00127 and CUP09-00009. Parking agreement shall be submitted prior to sign off on occupancy.
Routing - PUBLIC WORKS7/10/2009 7/15/2009 FAIL
DetailsConnie Baumgartner
Routing PW Drainage7/10/2009 7/14/2009 FAIL
DetailsBrian Murphy
NEEDS REVISIONS TO PLAN AND O AND M TIMELINE. BRIAN MURPHY ###-####
Plan resubmittals received  7/10/2009  
DetailsCarl Westfall
Rec'd transmittal sheet, and two copies or sheet 2a- taken to Carl W
Routing - PLAN CHECK6/11/2009 7/10/2009 FAIL
DetailsCarl Westfall
Completed the IBC resubmittal review. 2 items were not resolved. Sent an E-mail to the architect and routed the drawing back to PW.
Plan resubmittals received  7/7/2009  
Received 1 letter of transmittal,2 structural reports,2 copies of sheets 1,2,7s3,s4,s1,m-100,s-101,s-103,p-100,p-101,p-102,p-103,e-100,e-101,e-102,e-103,e-104 and 3 copies of sheets 5 & 6

Also received 1 transmittal letter,2 copies of O & M manual & 2 copies of sheet SW-100 sent all resubmittals to Carl Westfall
Routing - FIRE6/5/20096/5/20096/11/2009 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  6/11/2009 FAIL
Failed Public Works, Planning, Plan Check
Route to Impact Fee Review6/5/20096/10/20096/8/2009 PASS
DetailsCindy M. Gould
Tenant improvements.
Routing - PLAN CHECK5/28/2009 6/5/2009 FAIL
DetailsCarl Westfall
The IBC plan review was started on June 1, 2009 and was finished on June 5, 2009. Revised drawings were required. See the plan review report.
Routing PW Drainage5/27/2009 5/28/2009 FAIL
DetailsBrian Murphy
NEED MONITORING WELL. SPEC C33 OR EQUAL SAND..BED LENG . SEPERATION DISTANCE . ECT. BRIAN MURPHY ###-####
Routing - PLAN CHECK5/20/2009 5/27/2009  
DetailsCarl Westfall
Taken out of Plan Review by Public Works for further review.
Routing - PUBLIC WORKS5/19/2009 5/20/2009 FAIL
DetailsBeverly Hall
Original review did not route to BM for parking lot - plans are failed.
Routing - Erosion and Sediment  5/20/2009 PASS
DetailsSteven Webb
ESC plan approved with attached conditions. ESC09-00259
Routing - PLANNING5/20/2009 5/20/2009 FAIL
DetailsSue Cummings
Sue Cummings CUP09-00009. PASS- Needs to submit shared parking agreement and the landscaping needs to be completed prior to issuance of a C of O. Design Review Josh Wilson FAIL- DR application not yet approved.
Routing - Addressing5/19/2009 5/19/2009 PASS
DetailsApril Wing
Pending Assignment by JCB5/19/2009 5/19/2009 DONE
DetailsJason Blais
Intake Approval  5/15/2009 PASS
DetailsDan Stuart
Visited with Cody Riddle 4/29/09 concerning intake of plans while Planning approval for associated new parking lot and landscaping is processing. He indicated there wouldn't be a problem. A letter provided by architect noting understanding that a permit will not be issued before Planning requirements are met. This is an occupancy use change and a CZC has been issued.
Intake Approval  5/13/2009 FAIL
DetailsDan Stuart
Telephone call  5/11/2009 DONE
DetailsDan Stuart
Mike Fairchild called to set up second Plan Intake T.I. for Boise Police Association Activities Building, 7311 Potomac, occupancy use change.
Intake Approval  4/29/2009 FAIL
DetailsDan Stuart
Application received 4/29/2009   
Routing - Design Review5/20/2009    
DetailsJosh Wilson
Josh Wilson DRH09-00127.