Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD09-00646
StatusFinaled
Name HCD INC
Site Address 5208 W IRVING ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(PERMIT FORMERLY FOR IDAHO DESIGN CENTER) (2-1-10 PERMIT NOW FOR "SHELL - NO TENANT") (2-1-10 PLAN MODIFICATION TO REDUCE THE SCOPE OF WORK TO ONLY CONSTRUCTING THE PARAPET ON THE WEST WALL. THIS IS A SHELL PERMIT AND DOES NOT ESTABLISH A CERTIFICATE OF OCCUPANCY FOR ANY TENANT. TENANT IMPROVEMENT WORK WILL BE DONE UNDER PERMIT BLD10-00115.) Fire sprinklers used for building area increase. To remodel an existing 16,372 square foot building. This permit is to complete work authorized by BLD06-00026 but never finished. Work is to include a 2-hr fire-resistance-rated parapet on the West wall, exit signs, emergency lights, a new entrance door, a service sink, and a parking space accessible to the disabled. The mezzanine level is NOT approved for occupancy. Storage racks over 8 feet tall are NOT allowed under this permit. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to be maintained in compliance with NFPA 13 as regulated by the Fire Department. **CJW** 5-7-10 FINAL CERT OF VALUE PER GC 9,856.00///DLD
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Plan Reviewer's activity  6/21/2010 DONE
Took office copy to Records.
First Notice4/13/20104/13/20105/10/2010 DONE
DetailsTom Arcoraci
DOC - Permit Finaled4/13/20104/13/20104/13/2010APASS
DetailsTom Arcoraci
BLD-Aging Inspection4/12/20104/12/20104/13/2010 PASS
DetailsTom Arcoraci
BLD-Final2/8/20102/9/20102/9/2010APASS
DetailsTom Arcoraci
Dennis Phone #: ###-####
FIRE-Final Inspection2/5/20102/8/20102/8/2010APASS
DetailsTroy Cobbley
This inspection did not require fire sign off since the scope of work had been changed. I did perform a conference with the contractor and the owner on requirements for the upcoming permit being issued for the tenant improvement. I noted missing sprinkler heads under a rear overhead door and a office in the warehouse area that will have a ceiling installed. Door hardware is missing or incorrect in several areas.
CHANGE STATUS TO (ISS)  2/2/2010 DONE
(F) Reprint permit  2/2/2010 DONE
Plan assigned to (CJW)1/21/20101/21/20102/1/2010 PASS
DetailsCarl Westfall
2/1/2010 13:42:14 CJW - activity updated through activity BLDA022 from case BLD09-00646.
Routing - PLAN CHECK1/21/2010 2/1/2010 PASS
DetailsCarl Westfall
Completed and approved the plan modification.
PLANS/APPL TAKEN TO FRONT DESK  2/1/2010 DONE
Permit Ready to Issue  2/1/2010 DONE
DetailsBarbara Stitt
Telephone call  2/1/2010 DONE
DetailsBarbara Stitt
Left voice message for Pat McKeegan that permit is readyand fees due @ 4:42pm 2-1-10///BAS
Plan Modification Accepted  1/21/2010  
DetailsTisha Gallop
plan modification accepted for Bld09-00646 (Idaho Design Center) for "as built" plan to show work that was not completed when tenant left building; submitted on plan sheets T1.0, A2.1, A2.2, A3.1, ST-1, A-2, M1.0, revised cert of value; routed to Carl Westfall
Received Certificate of Value  1/21/2010 DONE
DetailsTisha Gallop
received revised cert of value with plan mod; new project value is $10,515; plm,mech,ele,fire n/a//1/21/10 LEG
BLD-Aging Inspection12/14/200912/14/200912/14/2009 PASS
DetailsTom Arcoraci
Case Summary (BLD)  11/30/2009 DONE
Meeting  10/29/2009  
property manager/owner in office wanted to change permit. Idaho Design Center is not occupying space, new tenat will be applying for occupancy w/in a month but wants credit for what work has already been done to space. Spoke to Carl Westfall, customer needs to submit Plan Modification for new scope of work and then get final inspections to close out permit.
BLD-Other10/13/200910/13/200910/13/2009APASS
DetailsTom Arcoraci
BLD-Aging Inspection10/13/200910/13/200910/13/2009 PASS
DetailsTom Arcoraci
BLD-Framing/Rough-in7/23/20097/23/20097/23/2009PPART
DetailsTom Arcoraci
BLD-Framing/Rough-in7/20/20097/23/20097/23/2009APART
DetailsTom Arcoraci
Bill Phone #: ###-#### wip ok
Issue PAID IN FULL permit  7/8/2009 DONE
DetailsTisha Gallop
Telephone call  7/2/2009 DONE
Details
left vm for pat mckeegan at ###-#### - permit ready and fees given
Permit Ready to Issue  7/2/2009 DONE
Details
PLANS/APPL TAKEN TO FRONT DESK  7/1/2009 DONE
Print Occupancy Form  7/1/2009 DONE
Details
Routing - PLAN CHECK5/21/2009 7/1/2009 PASS
DetailsCarl Westfall
Completed the resubmittal review. Drawings approved.
Plan assigned to (CJW)5/7/2009 7/1/2009 PASS
DetailsCarl Westfall
7/1/2009 15:45:32 CJW - activity updated through activity BLDA022 from case BLD09-00646.
Plan resubmittals received  6/26/2009  
DetailsCarl Westfall
Received 1 response letter (2 pgs), 2 copies of sheets T1.0, T1.1, A2.1, A2.2, A3.1, ST-1, A-2, M-0.1, M-0.0, M-1.0 and taken to Carl Westfall's desk 6-26-09 @ 4:10pm BAS
Routing - FIRE5/18/20095/18/20095/21/2009 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  5/21/2009 FAIL
Failed Plan Check
Route to Impact Fee Review5/18/20095/21/20095/18/2009 PASS
DetailsCindy M. Gould
Tenant improvement no impact fees
Routing - PLAN CHECK5/8/2009 5/18/2009 FAIL
DetailsCarl Westfall
The IBC plan review was started on May 13, 2009 and was finished on May 18, 2009 (5 work days). Revised drawings were required. See the plan review report.
Routing - PUBLIC WORKS5/7/2009 5/8/2009 PASS
DetailsBeverly Hall
Service Sink being relocated from previous plan.
Routing - Design Review5/8/2009 5/8/2009 PASS
DetailsSarah Schafer
Sarah Schafer CZC05-00241. Approved per the original CZC. Since work was started under the original permit and the design is the same, there is no need to file another application.
Routing PW Sewer Rating5/8/2009 5/8/2009 PASS
DetailsConnie Baumgartner
Routing - Addressing5/7/2009 5/7/2009 PASS
DetailsApril Wing
Pending Assignment by JCB5/6/2009 5/7/2009 DONE
DetailsJason Blais
Recd Pcfee & Taken To Pln CK  5/6/2009 DONE
Application received 5/5/2009