BLD-Final | 5/14/2009 | 5/14/2009 | 5/14/2009 | P | PASS |
Jim Storey
|
|
|
Glenn- call 15 mins prior to going for access Phone #: ###-#### final ok
|
FIRE-Final Inspection | 5/13/2009 | 5/14/2009 | 5/14/2009 | A | PASS |
Forrest France
|
|
|
Items on correction notice verified for completion, life safety finaled.
|
First Notice | | 5/14/2009 | 5/14/2009 | | DONE |
|
|
|
|
MISC ACTIONS | | | 5/14/2009 | | DONE |
Tisha Gallop
|
|
|
tenant wanted to change name from Green Tea Spa to Tea Leaf Spa
|
Permanent Occupancy | | | 5/14/2009 | | DONE |
Tisha Gallop
|
|
|
|
FIRE-Final Inspection | 5/11/2009 | 5/12/2009 | 5/13/2009 | A | FAIL |
Forrest France
|
|
|
Need to terminate exposed electrical wiring in approved junction boxes with covers at five locations, remove the manual thumbturn at the main entry/exit door, disable deadbolts at second exits. Fire extinguishers, exit signs and EM lights okayed.
|
FIRE-Final Inspection | 5/8/2009 | 5/8/2009 | 5/11/2009 | P | CANC |
Forrest France
|
|
|
Inspection rescheduled for 5/12 AM per phone call from contractor recieved 5/11.
|
BLD-Final | 5/8/2009 | 5/8/2009 | 5/8/2009 | P | FAIL |
Jim Storey
|
|
|
Glenn--Please call at least 1 hour prior to set up meeting at this site Phone #: ###-#### need exit signs w one drectional sign to 2 nd first foor exit door. charge fire ext. / all exit hardware single function no dead bolt to be functional except main exit w signage to remain unlocked.
|
Issue PAID IN FULL permit | | | 5/8/2009 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 5/5/2009 | 5/5/2009 | 5/7/2009 | | PASS |
Carl D Madsen
|
|
|
5/7/2009 14:31:33 CDM - activity updated through activity BLDA022 from case BLD09-00647.
|
Routing - PLAN CHECK | 5/5/2009 | | 5/7/2009 | | FAIL |
Carl D Madsen
|
|
|
This building was constructed in 1984 as a single tenant building For John Hunt DDS. Separation of this building into a multiple tenant space to occupy the basement and main level separately will require an accessible route to the basement level.
|
Case Summary (BLD) | | | 5/7/2009 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/7/2009 | | 5/7/2009 | | PASS |
Carl D Madsen
|
|
|
This will be a single occupant building CDM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/7/2009 | | |
|
|
|
|
Print Occupancy Form | | | 5/7/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Telephone call | | | 5/7/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
LM for Glenn- permit ready, no fees
|
Permit Ready to Issue | | | 5/7/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
1st review completed | | | 5/6/2009 | | DONE |
|
|
|
|
Application received | | 5/5/2009 | | | |
|
|
|
|