Information based on query as of Thursday, July 25, 2024.
Permit Information
Permit NumberBLD09-00650
StatusFinaled
Name CM COMPANY
Site Address 619 W BANNOCK ST
Project NameAT&T BLDG
Customer Number 
ePlanReviewNo
Description
(QWEST COMMUNICATIONS - 6TH STORY) This building is fire sprinklered for high-rise. To remodel the 6 story of the existing Qwest Communications building. Some nonstructural, nonbearing masonry walls will be removed. Work is to include creating a 1,677 square foot battery room, creating a 2,076 square foot telecommunication equipment room, and combining rooms to create a 897 square foot mechanical room. One-hr fire-resistance-rated fire barrier walls will be constructed. Spill containment for the battery room will be provided. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. Spaces used exclusively for telecommunications equipment, associated electrical power distribution equipment, and batteries are not required to be fire sprinklered provided those spaces are equipped throughout with an automatic fire alarm system and are separated from the remainder of the building by fire barriers consisting of not less than 1-hr fire-resistance-rated walls and 2-hr fire-resistance-rated floors (2006 IBC Section 903.2). **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 11/6/200911/25/2009 DONE
BLD-Final10/26/200910/26/200910/27/2009PPASS
DetailsDave Hannah
Brian Phone #: ###-####
Permanent Occupancy  10/27/2009 DONE
BLD-Final10/22/200910/23/200910/24/2009AFAIL
DetailsDave Hannah
Brian Phone #: ###-#### needs 60 min fire doors
BLD-Final10/21/200910/22/200910/22/2009PCANC
DetailsDave Hannah
Brian Phone #: ###-####
FIRE-Final Inspection10/20/200910/21/200910/21/2009PPASS
DetailsTroy Cobbley
Life safety passed.
FIRE-Final Inspection10/19/200910/20/200910/20/2009ANR
DetailsForrest France
Need project related fire alarm permit final prior to building fire life safety approvals.
BLD-Conference9/18/20099/18/20099/21/2009PPART
DetailsLee Rice
called troy on mechanical because someone in office noticed them working on the roof.
BLD-Framing/Rough-in9/3/20099/4/20099/4/2009APASS
DetailsDave Hannah
Brian Phone #: ###-####
Routing - PLAN CHECK7/22/2009 7/22/2009 DONE
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  7/22/2009 DONE
Print Occupancy Form  7/22/2009 DONE
Details
Telephone call  7/22/2009 DONE
Details
left message w margie for bob smith at ###-#### - permit ready and fees given
Permit Ready to Issue  7/22/2009 DONE
Details
Issue PAID IN FULL permit  7/22/2009 DONE
DetailsTisha Gallop
Plan assigned to (CJW)5/7/2009 7/22/2009 PASS
DetailsCarl Westfall
7/22/2009 09:19:09 CJW - activity updated through activity BLDA022 from case BLD09-00650.
Routing - PLANNING7/21/2009 7/22/2009 PASS
DetailsSarah Schafer
Exterior improvements are very minor and not visible.
Routing - PLAN CHECK6/16/2009 7/21/2009 PASS
DetailsCarl Westfall
Completed the resubmittal review. Drawings approved.
Telephone call  7/20/2009 DONE
DetailsTim Frost
Per Cameron at Shilo the pipe size reconnecting the grid will the same size (3") as existing not 2" as shown on the drawings.
Plan resubmittals received  7/14/2009  
DetailsTisha Gallop
Received response from architect, two copies of response from engineer, supplemental structural calcs for the relocated HVAC units, supplemental structural calcs for new HVAC fraiming over and existing HVAC frame, supplemental structural calcs for the connection of the battery racks to the floor and reanalyze the 6th floor for the battery, plan sheet A-1; taken to Carl Westfall
Routing - FIRE6/10/2009 6/16/2009 PASS
DetailsScott Arellano
Attached IFC comments to plans
Routing - PLAN CHECK5/14/2009 6/10/2009 FAIL
DetailsCarl Westfall
Completed the resubmittal review. Sent an E-mail to the Architect asking for additional information.
Plan resubmittals received  6/4/2009  
received 1 response, 2 structural calcs, 2 flooded battery rack books and 2 copies of sheets A-1,A-2,A-3,M-2.0,M-4.1 taken to Carl W.
Route to Impact Fee Review5/12/20095/15/20095/15/2009 PASS
DetailsCindy M. Gould
Remodel of existing building. Tenant improvements.
Routing - FIRE5/12/20095/12/20095/14/2009 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
1st review completed  5/14/2009 FAIL
Failed Plan Check, Fire
Plan resubmittals received  5/12/2009  
DetailsTisha Gallop
received transmittal and two copies of Structural Calculations; taken to Carl Westfall
Routing - PLAN CHECK5/7/2009 5/12/2009 FAIL
DetailsCarl Westfall
The IBC plan review was started on May 8, 2009 and was finished on May 12, 2009. Revised drawings and additional structural analysis and design were required. See the plan review report. E-mailed a copy of the report to the architect and the applicant.
Plans ACCEPTED BY PLAN TECH  5/7/2009 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  5/7/2009 DONE
DetailsTisha Gallop
Pending Assignment by JCB5/7/2009 5/7/2009 DONE
DetailsJason Blais
Intake Approval  5/6/2009 PASS
Application received 5/6/2009