Permit Information
Permit NumberBLD09-00651
StatusFinaled
Name RAISTRICK CONSTRUCTION
Site Address 950 W BANNOCK ST Unit: 510
Project NameMilliman - suite 510
Customer Number 
ePlanReviewNo
Description
(Milliman - suite 510) For minor tenant improvements to an existing tenant space with work to include the reconfiguration of an adjacent space to increse the square footage of suite 510 by approximately 1200 sq.ft. making the remodeled tenant spac appproximately 4437 sq. ft., including the mechanical room. The reconfiguration will be done with the use of the existing modular wall system, istalled per the approval letter attached to the plan. The break/kitchen area will be relocated. THIS IS A FULLY SPRINKLERD BUILDING, ANY ALTERATION TO THE SPRINKLER SYSTEM WILL REQUUIRE A SEPARATE PERMIT AND SHALL COMPLY WITH NFPA13 AS REGULATED BY THE CITY OF BOISE FIRE DEPARTMENT. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  11/6/2015 DONE
Telephone call  10/29/2009 DONE
called and spoke with Dennis that because he marked no change on all values it requires an audit and I need contracts for all subs to verify values. He told me Christensen Corp. has some of the info, he doesn't have it all. I asked him to get me what he has and then I will contact Christensen Corp. He said will get it together and back to me.
Third Notice 10/16/200910/23/2009 DONE
faxed, mailed and called
Telephone call  10/23/2009 DONE
DetailsTisha Gallop
called and left voice message for Dennis/Raistrick Const. need final values and if not received w/in 2 weeks will put company on hold.
Third Notice 9/26/200910/6/2009 DONE
faxed, mailed and called
Telephone call  10/6/2009 DONE
DetailsTisha Gallop
called and left voice message for Dennis/Raistrick Const. need final values.
Third Notice 9/1/20099/16/2009 DONE
Second Notice 8/11/20099/1/2009 DONE
First Notice 7/2/20098/11/2009 DONE
Permanent Occupancy UNPAID FEE  7/2/2009 DONE
DetailsTisha Gallop
BLD-Final6/29/20096/30/20097/1/2009PPASS
DetailsDave Hannah
marva Phone #: ###-#### ok for perm occ
FIRE-Final Inspection6/29/20096/30/20096/30/2009APASS
DetailsForrest France
Fire life safety inspection passed.
BLD-Framing/Rough-in6/23/20096/23/20096/24/2009APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/23/2009 at 7:08:10 AM. Contact: ###-####.
BLD-Framing/Rough-in6/11/20096/11/20096/12/2009PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/11/2009 at 8:30:15 AM. Contact: ###-####.
Issue PAID IN FULL permit  5/13/2009 DONE
Plan assigned to (CDM)5/6/20095/6/20095/11/2009 PASS
DetailsCarl D Madsen
5/11/2009 11:56:01 CDM - activity updated through activity BLDA022 from case BLD09-00651.
Case Summary (BLD)  5/11/2009 DONE
1st review completed  5/11/2009 DONE
Routing - FIRE  5/11/2009 PASS
DetailsCarl D Madsen
Verify in field CDM
PLANS/APPL TAKEN TO FRONT DESK  5/11/2009  
Print Occupancy Form  5/11/2009 DONE
Details
Telephone call  5/11/2009 DONE
Details
left message w jeremy for douglas cooper at ###-#### - permit ready and fees given
Permit Ready to Issue  5/11/2009 DONE
Details
Routing - PLAN CHECK  5/11/2009 PASS
DetailsCarl D Madsen
Routing PW Sewer Rating5/7/2009 5/7/2009 PASS
DetailsConnie Baumgartner
Routing - PUBLIC WORKS5/6/2009 5/7/2009 PASS
DetailsBeverly Hall
Plans ACCEPTED BY PLAN TECH  5/6/2009 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  5/6/2009 DONE
DetailsTisha Gallop
Application received 5/6/2009