Third Notice | | 3/29/2010 | 4/15/2010 | | DONE |
|
|
|
|
Third Notice | | 3/15/2010 | 3/15/2010 | | DONE |
|
|
|
e-mailed and faxed Stu White
|
Third Notice | | 2/28/2010 | 2/23/2010 | | DONE |
|
|
|
e-maild Stu White and faxed
|
Second Notice | | 1/23/2010 | 1/26/2010 | | DONE |
|
|
|
|
First Notice | | 1/23/2010 | 1/26/2010 | | DONE |
|
|
|
|
First Notice | | 1/23/2010 | 1/13/2010 | | DONE |
|
|
|
|
Permanent Occupancy | | | 1/13/2010 | | DONE |
|
|
|
|
Permanent Occupancy | | | 1/13/2010 | | DONE |
|
|
|
|
BLD-Final | 1/5/2010 | 1/5/2010 | 1/6/2010 | P | PASS |
Jim Storey
|
|
|
key is in the front electrical box Phone #: ###-#### Internet Inspection Request from: Todd Blackwell
|
BLD-Final | 1/5/2010 | 1/5/2010 | 1/6/2010 | P | PASS |
Jim Storey
|
|
|
isued l/c
|
DOC - Permit Finaled | 1/6/2010 | 1/6/2010 | 1/6/2010 | P | PASS |
Jim Storey
|
|
|
|
PubWorks Occupancy Approval | 1/6/2010 | 1/6/2010 | 1/6/2010 | | DONE |
Angela Brosious
|
|
|
Ok for final occupancy per Jim Wylie.
|
Zoning Approval | 1/5/2010 | 1/5/2010 | 1/5/2010 | | DONE |
Sarah Schafer
|
|
|
|
BLD-Final | 11/19/2009 | 11/19/2009 | 11/19/2009 | P | PASS |
Jim Storey
|
|
|
GEORGE Phone #: ###-####
|
BLD-Final | 9/29/2009 | 9/29/2009 | 9/29/2009 | P | PART |
Jim Storey
|
|
|
temp ok pending mti si final report.
|
Temporary Occupancy UNPAID FEE | | | 9/29/2009 | | DONE |
|
|
|
|
FIRE-Final Inspection | 9/15/2009 | 9/17/2009 | 9/17/2009 | A | PASS |
Forrest France
|
|
|
Fire life safety passed inspection, project related FIR09-00391 scope of work tested with the adjacent truck maintenance and dispatch building fire alarm permit work.
|
FIRE-Final Inspection | 9/9/2009 | 9/10/2009 | 9/10/2009 | A | PART |
Forrest France
|
|
|
George Phone #: ###-####
|
BLD-Final | 9/9/2009 | 9/10/2009 | 9/10/2009 | A | NR |
Jim Storey
|
|
|
George Phone #: ###-#### si report and missing bolts/need all sign offs
|
BLD-Aging Inspection | 9/2/2009 | 9/2/2009 | 9/3/2009 | | PASS |
Jim Storey
|
|
|
|
Issue PAID IN FULL permit | | | 6/3/2009 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (JCM) | 5/7/2009 | | 6/1/2009 | | PASS |
John Menard
|
|
|
6/1/2009 09:22:29 JCM - activity updated through activity BLDA022 from case BLD09-00656.
|
Routing - PUBLIC WORKS | 5/28/2009 | | 6/1/2009 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Drainage | 5/28/2009 | | 6/1/2009 | | PASS |
Jim Wyllie
|
|
|
|
Routing - PLAN CHECK | 6/1/2009 | | 6/1/2009 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/1/2009 | | DONE |
John Menard
|
|
|
|
Print Occupancy Form | | | 6/1/2009 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/1/2009 | | DONE |
|
|
|
|
Telephone call | | | 6/1/2009 | | DONE |
|
|
|
Left voice message for Jim Parker and told him that permit is ready, fees due and need ACHD///6-1-09 @ 3:15pm BAS
|
Permit Ready to Issue | | | 6/1/2009 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/13/2009 | | 5/28/2009 | | |
John Menard
|
|
|
|
Plan resubmittals received | | | 5/28/2009 | | DONE |
|
|
|
received 1 transmittal,1 comment,and 2 copies of sheets DM-P-100 , DM-P-700 taken to John M.
|
1st review completed | | | 5/20/2009 | | FAIL |
John Menard
|
|
|
Failed Public Works, Plan Check
|
Routing Off Site - STRUCTURAL | 5/6/2009 | | 5/20/2009 | | PASS |
John Menard
|
|
|
Received letter from consulting structural engineer approving structural plans and calcualtions as submitted. JCM
|
Routing - FIRE | 5/12/2009 | 5/12/2009 | 5/13/2009 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Route to Impact Fee Review | 5/12/2009 | 5/15/2009 | 5/12/2009 | | PASS |
Cindy M. Gould
|
|
|
No impact fees on canopies CMG
|
Routing - PLAN CHECK | 5/11/2009 | | 5/12/2009 | | PASS |
John Menard
|
|
|
Plans approved with attached comment list. JCM
|
Routing - Erosion and Sediment | 5/8/2009 | | 5/11/2009 | | PASS |
Steven Webb
|
|
|
ESC is under ESC08-0049. Approved with those permit attached conditions and approved ESC plan.
|
Routing - PLANNING | 5/11/2009 | | 5/11/2009 | | PASS |
Sarah Schafer
|
|
|
DRH07-00594- Sarah Schafer
|
Routing - PLUMBING | 5/11/2009 | | 5/11/2009 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Routing PW Drainage | 5/8/2009 | | 5/8/2009 | | FAIL |
Jim Wyllie
|
|
|
Sheet DM-P-100 / Need details for valve between fuel spill containment sump and oil/water separator. For normal operations, valve should be left in a closed position. Jim Wyllie / ###-####
|
Routing PW Environmental | | | 5/8/2009 | | PASS |
|
|
|
WINCO re fueling canopy OK fuel island area drains to storm sys, repair bay shoop interior drains to sewer, both via 1500 gal flamm incpt
|
Routing PW Sewer Design | 5/8/2009 | | 5/8/2009 | | PASS |
Javier Guzman
|
|
|
Connect to existing service provided.
|
Routing PW Sewer Rating | 5/8/2009 | | 5/8/2009 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 5/7/2009 | | 5/8/2009 | | FAIL |
Connie Baumgartner
|
|
|
|
Routing - PLANNING Land Div | 5/7/2009 | | 5/7/2009 | | PASS |
Dave Abo
|
|
|
Parcel "B" on ROS 8276.
|
Pending Assignment by JCM | 5/7/2009 | | 5/7/2009 | | BLDA |
John Menard
|
|
|
5/12/2009 07:50:30 JCM - activity updated through activity BLDA166 from case BLD09-00656.
|
Routing - Addressing | 5/7/2009 | | 5/7/2009 | | PASS |
April Wing
|
|
|
|
Application received | | 5/6/2009 | 5/6/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/6/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 5/6/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|