BLD-Final | 9/3/2009 | 9/3/2009 | 9/3/2009 | P | PASS |
Jim Sly
|
|
|
kelly Phone #: ###-####
|
DOC - Permit Finaled | 9/3/2009 | 9/3/2009 | 9/3/2009 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 6/9/2009 | 6/9/2009 | 6/9/2009 | P | PASS |
Jim Sly
|
|
|
kelly Phone #: ###-#### Frame and energy...OK
|
Telephone call | | | 5/15/2009 | | DONE |
|
|
|
Called Vicki to let her know that I would make a modification to the permit that indicates the hot tub will not be installed in the shed. CDM 5-15-09
|
Routing Walk-In (Zoning) | 5/8/2009 | 5/8/2009 | 5/8/2009 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 5/8/2009 | 5/8/2009 | 5/8/2009 | P | PASS |
Carl D Madsen
|
|
|
The hot tub is no longer being installed in the shed CDM 5-15-09
|
Case Summary (BLD) | | | 5/8/2009 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/8/2009 | | DONE |
|
|
|
|
1st review completed | | | 5/8/2009 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/8/2009 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/8/2009 | | DONE |
|
|
|
|
Application received | | 5/8/2009 | | | |
|
|
|
|