Permit NumberBLD09-00695
StatusFinaled
Name JOE IGLESIAS
Site Address 250 S 5TH ST 120
Project NameVANILLA FINISH** STE# 120
Customer Number 
ePlanReviewNo
Description
(**VANILLA FINISH** STE# 120) Permit is to create two tenant spaces from one large tenant space. This tenant space was 5,040 square feet after this scope of work is completed it will now be 1,275 square feet. Approval per approved plans on file. Work to include: construction of interior non-bearing walls to create two tenant spaces from one, removing one light fixture and relocating one light fixture, relocating a door and sidelight, and interior finishes in compliance with chapter 8 of the 2006 IBC. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. This tenant space requires additional permits before occupancy. This permit in no way establishes occupancy of this space. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
MISC ACTIONS  9/13/2010 DONE
DetailsTisha Gallop
Per Lisa/Radix Const, send final values statement to Joe Iglesias/TOK
Third Notice 6/10/20106/9/2010 DONE
per note on FV to bill TOK for final fees.
Third Notice 5/15/20105/27/2010 DONE
faxed
Second Notice 5/6/20105/10/2010 DONE
First Notice4/14/20104/14/20104/26/2010 DONE
DetailsDave Hannah
BLD-Final4/14/20104/14/20104/14/2010PPASS
DetailsDave Hannah
DOC - Permit Finaled4/14/20104/14/20104/14/2010PPASS
DetailsDave Hannah
BLD-Final10/7/200910/8/200910/9/2009PPASS
DetailsDave Hannah
matt Phone #: ###-####
FIRE-Final Inspection9/21/20099/22/20099/22/2009APASS
DetailsForrest France
Vanilla permit fire life safety passed final inspection.
BLD-Framing/Rough-in7/15/20097/15/20097/16/2009PPASS
DetailsDave Hannah
matt Phone #: ###-####
Issue PAID IN FULL permit  6/12/2009 DONE
Plan assigned to (TLW)5/14/2009 5/18/2009 PASS
DetailsTim L. Woodard
5/18/2009 15:52:16 TLW - activity updated through activity BLDA022 from case BLD09-00695.
Routing - PLAN CHECK5/14/2009 5/18/2009 PASS
DetailsTim L. Woodard
approved as submitted. TLW
Routing - FIRE  5/18/2009 PASS
DetailsTim L. Woodard
Field Verify
1st review completed  5/18/2009 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  5/18/2009 DONE
DetailsTim L. Woodard
Case Summary (BLD)  5/18/2009 DONE
DetailsTim L. Woodard
Inspection Record Card- Bld  5/18/2009 DONE
Details
Telephone call  5/18/2009 DONE
Details
left vm for glenn walker at ###-#### - permit ready and fees given
Permit Ready to Issue  5/18/2009 DONE
Details
Plans ACCEPTED BY PLAN TECH  5/14/2009 DONE
Ok per Tim Woodard for a level one.
Application received 5/13/2009