Permit for the construction of a 1183 sq. ft., two story ( first story 630 sq. ft., second story 553 sq. ft. ) townhouse with 2 bedrooms, two bathrooms and a 307 sq. ft. attached garage. The south side of this unit is at the 5' setaback and requires the eaves to be rated on the underside. Distance to property line for fire rated construction is measured from the finished exterior of the exterior wall. Any walls less than 5' from the property line are required to be one hour fire wall assemblies. All work to be done per the approved plans, plan review report and any notations. CUP07-150, DRH08-43 and setbacks per Planning and zoning.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/4/20102/5/20102/5/2010APASS
DetailsMike Jordan
Phone #: ###-#### Internet Inspection Request from: James Larkin
DOC - Permit Finaled2/5/20102/5/20102/5/2010PPASS
DetailsMike Jordan
Cert. of occ. issued.
Zoning Approval2/5/20102/5/20102/5/2010 PASS
DetailsSarah Schafer
Meets the application requirements.
BLD-Framing/Rough-in1/27/20101/27/20101/27/2010APASS
DetailsTom Arcoraci
framing / energy seal Phone #: ###-#### Internet Inspection Request from: James Larkin
BLD-Framing/Rough-in1/18/20101/19/20101/19/2010PPASS
DetailsMike Jordan
Fire Rate eave Phone #: ###-#### Internet Inspection Request from: James Larkin. Verified 2layers of 5/8 type x rock at soffitt. ok.
BLD-Energy code compliance1/15/20101/15/20101/15/2010PPASS
DetailsMike Jordan
BLD-Energy code compliance1/15/20101/15/20101/15/2010ANR
DetailsMike Jordan
Insulation crews will be there first thing this mornig. Please wait until 10:30 to 11:00 to inspect. Thanks!! Phone #: ###-#### Internet Inspection Request from: James Larkin
BLD-Framing/Rough-in1/14/20101/14/20101/14/2010APASS
DetailsMike Jordan
Framing / Energy seal Phone #: ###-#### Internet Inspection Request from: James Larkin
BLD-Framing/Rough-in1/8/20101/8/20101/8/2010PPASS
DetailsMike Jordan
Fire wall construction inspection please-Jim Phone #: ###-####. BAse and face layers of 5/8 type x rock at overbuild section. Also verified fire rated ply at 4ft. laydown parapet area.
BLD-Framing/Rough-in1/7/20101/7/20101/7/2010PNR
DetailsMike Jordan
Fire wall construction in overbuild Phone #: ###-#### Internet Inspection Request from: James Larkin
BLD-Framing/Rough-in1/5/20101/5/20101/5/2010PPART
DetailsMike Jordan
Jim-Fire wall construction inspection please Phone #: ###-####. Base and face layer of 5/8 type x rock for 2hr firewall from 2nd. floor ceiling to to roof deck.
BLD-Framing/Rough-in12/30/200912/30/200912/30/2009PPART
DetailsMike Jordan
Jim Phone #: ###-####. 2nd. floor, face layer of 5/8 type x rock, both sides for 2hr. firewall.
BLD-Framing/Rough-in12/23/200912/23/200912/23/2009PPART
DetailsMike Jordan
Fire Wall Construction Phone #: ###-#### Internet Inspection Request from: James Larkin. 2nd. floor, base layer of 5/8 type x rock for 2hr. fire wall.
BLD-Framing/Rough-in12/23/200912/23/200912/23/2009ACANC
DetailsMike Jordan
Fire Wall Construction Phone #: ###-#### Internet Inspection Request from: James Larkin
BLD-Framing/Rough-in12/8/200912/8/200912/8/2009PPART
DetailsMike Jordan
Fire Wall Construction Phone #: ###-#### Internet Inspection Request from: James Larkin. FAce layer of 5/8 type x rock 1st. floor, both sides for 2hr. firewall.
BLD-Framing/Rough-in12/6/200912/7/200912/7/2009PPART
DetailsMike Jordan
Should be ready any time after 11:00 Phone #: ###-#### Internet Inspection Request from: James Larkin. 1st. floor, base layer of 5/8 type x rock, both sides for 2hr. firewall.
BLD-Framing/Rough-in12/4/200912/4/200912/4/2009PNR
DetailsMike Jordan
Fire Wall Phone #: ###-#### Internet Inspection Request from: James Larkin
BLD-Footing12/1/200912/1/200912/1/2009APART
DetailsMike Jordan
Phone #: ###-#### Internet Inspection Request from: James Larkin. wip on interior footings, to be placed with slab on grade.
BLD-Energy code compliance11/24/200911/24/200911/24/2009PPASS
DetailsMike Jordan
Jim Phone #: ###-####. Rigid foam insulation at interior side of stemwall ok.
BLD-Foundation11/20/200911/23/200911/23/2009APASS
DetailsMike Jordan
Bill Phone #: ###-####
BLD-Footing11/18/200911/19/200911/19/2009APASS
DetailsMike Jordan
bill Phone #: ###-####
BLD-Footing11/18/200911/18/200911/18/2009PCANC
DetailsMike Jordan
Jim Phone #: ###-####. rescheduled for 11-19-09.
Issue PAID IN FULL permit  11/18/2009 DONE
DetailsTisha Gallop
Route to Impact Fee Review5/19/20095/22/20096/1/2009 PASS
DetailsCindy M. Gould
Inspection Record Card- Bld  6/1/2009 DONE
Permit Ready to Issue  6/1/2009 DONE
Telephone call  6/1/2009 DONE
Called Jim and told him that permit is ready & fees due///6-1-09 @ 12:15pm BAS
Plan assigned to (CDM)5/26/20095/26/20095/29/2009 PASS
DetailsCarl D Madsen
5/29/2009 15:49:00 CDM - activity updated through activity BLDA022 from case BLD09-00737.
Case Summary (BLD)  5/29/2009 DONE
1st review completed  5/29/2009 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/29/2009  
Routing - PLAN CHECK  5/29/2009 PASS
DetailsCarl D Madsen
Routing - PUBLIC WORKS5/21/2009 5/26/2009 PASS
DetailsBeverly Hall
Routing - Design Review5/21/2009 5/21/2009 PASS
DetailsAndrea Tuning
Routing - PLANNING5/20/2009 5/21/2009 PASS
DetailsSue Cummings
CUP07-150 CUP08-48
Routing - Addressing5/19/2009 5/20/2009 PASS
DetailsApril Wing
Application received 5/19/20095/19/2009 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  5/19/2009 DONE
DetailsTisha Gallop