BLD-Final | 7/27/2009 | 7/27/2009 | 7/27/2009 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Kelly Stover
|
DOC - Permit Finaled | 7/27/2009 | 7/27/2009 | 7/27/2009 | P | PASS |
Jim Storey
|
|
|
|
BLD-Energy code compliance | 6/22/2009 | 6/23/2009 | 6/23/2009 | A | PASS |
Jim Storey
|
|
|
Kelly Phone #: ###-#### c/n made ok insulation ok
|
BLD-Framing/Rough-in | 6/19/2009 | 6/19/2009 | 6/19/2009 | P | PART |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Kelly Stover truss bracing in garage and pending aproval from mech. ok to insulate.
|
BLD-Framing/Rough-in | 6/18/2009 | 6/19/2009 | 6/19/2009 | A | PASS |
Jim Storey
|
|
|
Fire stop on gable ends Phone #: ###-#### Internet Inspection Request from: Kelly Stover gyp ok
|
BLD-Foundation | 6/2/2009 | 6/3/2009 | 6/3/2009 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/2/2009 at 5:55:50 PM. Contact: ###-####.
|
BLD-Footing | 6/2/2009 | 6/2/2009 | 6/2/2009 | P | PASS |
Jim Storey
|
|
|
rob Phone #: ###-####
|
Route to Impact Fee Review | 5/20/2009 | 5/26/2009 | 6/1/2009 | | PASS |
Cindy M. Gould
|
|
|
Lot split, there was a garage only on this lot per Bev in Sewer
|
Plan assigned to (CDM) | 5/26/2009 | 5/26/2009 | 6/1/2009 | | PASS |
Carl D Madsen
|
|
|
6/1/2009 09:41:39 CDM - activity updated through activity BLDA022 from case BLD09-00762.
|
Case Summary (BLD) | | | 6/1/2009 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/1/2009 | | |
|
|
|
|
Inspection Record Card- Bld | | | 6/1/2009 | | DONE |
|
|
|
|
Telephone call | | | 6/1/2009 | | DONE |
|
|
|
left vm for kelly stover at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 6/1/2009 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/1/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Telephone call | | | 5/29/2009 | | DONE |
|
|
|
Talked to Kelly Stover and requested the truss engineering. 5-29-09 CDM
|
1st review completed | | | 5/27/2009 | | DONE |
|
|
|
|
Routing - PLAN CHECK | | | 5/27/2009 | | PASS |
Carl D Madsen
|
|
|
Truss engineering is required for beaam and header verification
Called and left a message with Brad he said to call Kelly in the morning 5-27-09 CDM
|
Routing - PUBLIC WORKS | 5/22/2009 | | 5/26/2009 | | PASS |
Beverly Hall
|
|
|
|
Routing - PLANNING | 5/21/2009 | | 5/22/2009 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - Addressing | 5/21/2009 | | 5/21/2009 | | PASS |
April Wing
|
|
|
|
Application received | | 5/20/2009 | 5/20/2009 | | DONE |
Barbara Stitt
|
|
|
|