Permit Information
Permit NumberBLD09-00762
StatusFinaled
Name ARMADA HOMES
Site Address 1054 E CARTER ST
Project Name 
Customer Number 
ePlanReviewNo
Description
For the construction of a 1503 sq. ft. 2 story ( first story 1051 sq. ft., second story 452 sq. ft. ) with 3 bedrooms, 2 1/2 bathrooms and a 594 sq. ft. attached garage. The north and south sides of this structure are at the 5' setback and require the eave to be one hour rated on the underside. For distance from property line for the measurement is to be taken from the finished wall. Any walls that are less than 5 feet from the property line to the exterior finish of the exterior wall are required to be one hour rated fire wall assemblies. All wall bracing shall comply with section 602 of the IRC currently adopted by The City of Boise. All work is to be done per the approved plans, plan review report and any notations. R-1C zoning and setbacks per CC. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/27/20097/27/20097/27/2009PPASS
DetailsJim Storey
Phone #: ###-#### Internet Inspection Request from: Kelly Stover
DOC - Permit Finaled7/27/20097/27/20097/27/2009PPASS
DetailsJim Storey
BLD-Energy code compliance6/22/20096/23/20096/23/2009APASS
DetailsJim Storey
Kelly Phone #: ###-#### c/n made ok insulation ok
BLD-Framing/Rough-in6/19/20096/19/20096/19/2009PPART
DetailsJim Storey
Phone #: ###-#### Internet Inspection Request from: Kelly Stover truss bracing in garage and pending aproval from mech. ok to insulate.
BLD-Framing/Rough-in6/18/20096/19/20096/19/2009APASS
DetailsJim Storey
Fire stop on gable ends Phone #: ###-#### Internet Inspection Request from: Kelly Stover gyp ok
BLD-Foundation6/2/20096/3/20096/3/2009APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/2/2009 at 5:55:50 PM. Contact: ###-####.
BLD-Footing6/2/20096/2/20096/2/2009PPASS
DetailsJim Storey
rob Phone #: ###-####
Route to Impact Fee Review5/20/20095/26/20096/1/2009 PASS
DetailsCindy M. Gould
Lot split, there was a garage only on this lot per Bev in Sewer
Plan assigned to (CDM)5/26/20095/26/20096/1/2009 PASS
DetailsCarl D Madsen
6/1/2009 09:41:39 CDM - activity updated through activity BLDA022 from case BLD09-00762.
Case Summary (BLD)  6/1/2009 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/1/2009  
Inspection Record Card- Bld  6/1/2009 DONE
Details
Telephone call  6/1/2009 DONE
Details
left vm for kelly stover at ###-#### - permit ready and fees given
Permit Ready to Issue  6/1/2009 DONE
Details
Issue PAID IN FULL permit  6/1/2009 DONE
DetailsAlexandra L. DeYoung
Telephone call  5/29/2009 DONE
Talked to Kelly Stover and requested the truss engineering. 5-29-09 CDM
1st review completed  5/27/2009 DONE
Routing - PLAN CHECK  5/27/2009 PASS
DetailsCarl D Madsen
Truss engineering is required for beaam and header verification
Called and left a message with Brad he said to call Kelly in the morning 5-27-09 CDM
Routing - PUBLIC WORKS5/22/2009 5/26/2009 PASS
DetailsBeverly Hall
Routing - PLANNING5/21/2009 5/22/2009 PASS
DetailsColleen T Carroll
Routing - Addressing5/21/2009 5/21/2009 PASS
DetailsApril Wing
Application received 5/20/20095/20/2009 DONE
DetailsBarbara Stitt