Permit Information
Permit NumberBLD09-00777
StatusFinaled
Name RAISTRICK CONSTRUCTION
Site Address 2719 W STEWART AVE
Project NameISLAMIC CENTER OF IDAHO
Customer Number 
ePlanReviewNo
Description
(ISLAMIC CENTER OF IDAHO) Remodel of an existing two story, 2,720 sq. ft. (2,509sq. ft. Main floor / 281 sq. ft. second) building for "change of occupancy use group " ("B" to an "A3" occupancy) for a new a new tenant. Work to include select interior demolition in preparation of restroom & door / hardware code compliance based on new occupancy use. To provide fully accessible Men's Restroom. Women's restroom to stay as-is; To post maximum occupant load signs in Prayer Room #1 - MAX. 23; Prayer Room #2A - MAX. 45; Prayer Room / Multi-purpose Room #2B - MAX. 75, all in accordance with approved occupant load reduction (see copy attached to plans); Maximum Total Occupant Load set at 150. Add emergency lighting at inside and over exterior exit landings, exit signage & TACTILE exit signage at all exit discharge doors as indicated on Sheet A2.0; and limited electrical & plumbing work as indicated on reviewed plans. drs CUP09-00022
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 7/9/20107/15/2010 DONE
First Notice 6/4/20106/29/2010 DONE
BLD-Final5/20/20105/25/20105/25/2010APASS
DetailsDave Hannah
Dennis Phone #: ###-#### ok for perm occ
FIRE-Final Inspection5/20/20105/25/20105/25/2010APASS
DetailsForrest France
Noted correction items field verified for completion, life safety inspection passed.
Permanent Occupancy UNPAID FEE  5/25/2010 DONE
DetailsTisha Gallop
FIRE-Final Inspection5/20/20105/20/20105/20/2010PFAIL
DetailsForrest France
Missing max. occupant load signs at three rooms per review note #8, hardware at both restroom doors is not approved, need access provided to the second floor level- one fire extinguisher req. at the 2nd floor, post tactile exit sign per plan annotations. EM and exit signs tested okay.
Issue PAID IN FULL permit  4/16/2010 DONE
DetailsTisha Gallop
Telephone call  3/31/2010 DONE
Called Matt Rhees concerning his client, Tariq Mian, The Islamic Center of Boise and them picking up their building permit & plans. Plans have been up front for pick up since 1/20/10. Matt said they had selected a contractor and was suprized the permit had not been picked up. He will e-mail Tariq Mian contact information.
Routing - PLANNING Land Div1/20/2010 1/20/2010 PASS
DetailsDave Abo
Parcels have combined into one parcel.
PLANS/APPL TAKEN TO FRONT DESK  1/20/2010 PASS
Approved with all attached comments and conditions as part of the approved plans.
Print Occupancy Form  1/20/2010 DONE
Permit Ready to Issue  1/20/2010  
Telephone call  1/20/2010 DONE
called Matt Rhees permit ready and fee given Also need GC 1-20-10 dld
Plan assigned to (DRS)5/26/2009 1/20/2010 PASS
DetailsDan Stuart
1/20/2010 09:31:44 DRS - activity updated through activity BLDA022 from case BLD09-00777.
Plan resubmittals received  1/19/2010  
DetailsTisha Gallop
received transmittal and Notice of Buildable Parcel (6 pgs); taken to Dan Stuart
Routing - FIRE11/20/2009 11/25/2009 PASS
DetailsScott Arellano
Attached updated IFC comments to plans
Plan resubmittals requested  11/20/2009 DONE
Copy of plan review e-mailed to architect.
Routing - PLAN CHECK6/23/2009 11/20/2009 FAIL
DetailsDan Stuart
Owner changed architects and resubmitted new plans and application. Resubmittal clarification / plan required for property line issue. Routing to fire code analyst.
Check Permit for Holds  11/18/2009 CANC
Extended permit application an additional 180 days due to difficulties associated with switching architects. jlg.
Meeting  11/18/2009 DONE
DetailsTisha Gallop
New applications, plans, and Registered Design Professional (Matthew Rhees) on project, see resubmittals received on 11/17/09 and scanned documents
Plan resubmittals received  11/18/2009 DONE
DetailsTisha Gallop
received revised applications and certs of values from new Registered Design Professional in Charge, response to comments, special request letter addressed to Building Official, two copies of floor framing engineering and two copies of plan sheets A0.0, A1.0, A2.0; taken to Dan Stuart. New applications were scanned into documents.
Extend Review Timeline  11/17/2009 DONE
DetailsJenifer Gilliland
Extended permit application until May 17, 2010 due to difficulties the project had when they switched to using a different architect. jlg.
CHANGE STATUS TO (REV)  11/17/2009 DONE
DetailsJason Blais
Case still under reviewed status. A new architect has been hired to take over the project. A request for permit application extension has been submitted to the Building Division Manager.
Application WITHDRAWN  10/27/2009 FAIL
Received notification from Jeff Likes, BRS Architects to formaly remove the plans / application they submitted for the Islamic Center from our system. copy of request to Jenifer Gilliland, Bob Archibald & Jason Blais for further direction. Scanned request and attached to permit.
Plan Reviewer's activity  10/13/2009 DONE
Sent warning notification informing the architect for Islamic Center of Boise that there are 30 days remaining before the submitted application will expire.
Routing - FIRE6/19/20096/19/20096/23/2009 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
1st review completed  6/23/2009 FAIL
Failed Plan Check, Fire
Route to Impact Fee Review6/19/20096/24/20096/22/2009 PASS
DetailsDonna Wolf
Tenant improvements - existing.
Plan resubmittals requested  6/19/2009 DONE
E-mail to Trent.
Routing - PLAN CHECK5/28/2009 6/19/2009 FAIL
DetailsDan Stuart
Resubmittals required. Plan review comments e-mail to Trent Koci at BRS. Routing to fire code analyst.
Routing - PLANNING5/27/2009 5/28/2009 PASS
DetailsJohn Johnson
Occupant Load must be dictated by CUP09-00022 at 52

Routed to Plan Check
Routing - PUBLIC WORKS5/26/2009 5/27/2009 PASS
DetailsBeverly Hall
Routing - Addressing5/27/2009 5/27/2009 PASS
DetailsApril Wing
Routing PW Sewer Rating5/27/2009 5/27/2009 PASS
DetailsConnie Baumgartner
Pending Assignment by JCB5/22/2009 5/26/2009 DONE
DetailsJason Blais
Recd Pcfee & Taken To Pln CK  5/22/2009 DONE
DetailsAlexandra L. DeYoung
Intake Approval  5/22/2009 PASS
DetailsSam Zahorka
Plans ACCEPTED BY PLAN TECH  5/22/2009 DONE
DetailsAlexandra L. DeYoung
Routing - PLAN CHECK11/25/2009 1/20/2009 PASS
DetailsDan Stuart
Parcels combined and copy of recorded documents provided and attached to plans. Approved by Planning Land Div. To permit desk to issue permit.
Application received 5/22/2009