Permit Information
Permit NumberBLD09-00808
StatusExpired
Name H & K MECHANICAL INC
Site Address 11101 W EXECUTIVE DR
Project NameClean Energy
Customer Number 
ePlanReviewNo
Description
(CLEAN ENERGY) To add a new compressed natural gas (CNG) fueling system at the existing Allied Waste facility. This new (CNG) system will be designed as an unattended private (CNG) fueling facility and is intended to serve the refueling needs for (CNG) powered vehicles. Work to include: Installation of a new electrically driven (CNG) compressor system, a low pressure gas dryer, a (CNG) storage vessel, twenty four time fill fueling stalls, the associated controls, equipment pads, interconnecting piping, electrical and safety system, construction and installation of dedicated electrical and gas services to serve the proposed (CNG) system, and a 6ft tall chain link fence. Reinforced concrete equipment pads and anchorage systems per engineering. All work per the approved plans and all other reviewing agencies approvals. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection11/4/201011/4/201011/9/2010 CANC
DetailsMike Jordan
DOC - Permit Expired11/9/201011/9/201011/9/2010PPASS
DetailsMike Jordan
Case Summary (BLD)  5/6/2010 DONE
FIRE-Final Inspection10/27/200910/28/200910/28/2009APASS
DetailsTroy Cobbley
Life safety passed
BLD-Final10/19/200910/20/200910/20/2009ACANC
DetailsMike Jordan
Mike Henderson Phone #: ###-####
BLD-Footing10/20/200910/20/200910/20/2009APASS
DetailsMike Jordan
Mike Henderson Phone #: ###-####. Reinforcement for light pole bases ok.
FIRE-Final Inspection8/26/20098/27/20098/27/2009APART
DetailsTroy Cobbley
A temporary occupancy is being given with Mark Sentenno's permission until the remaining filling stations have been installed and inspected as per the approved scope of work. Per Dave Fisher, the general manager of Allied Waste, the should be complete in roughly 45 days. I notified the general contractor the Dave Fisher needs to contact Mark about an operational permit for this facility. Signage was installed and the emergency shutoff switches functioned correctly. FIre extinguishers have been placed.
FIRE-Final Inspection8/26/20098/26/20098/27/2009PCANC
DetailsTroy Cobbley
Cancelled due to time constraints.
BLD-Foundation7/28/20097/29/20097/29/2009APASS
DetailsMike Jordan
Mike Henderson Phone #: 1-###-####. Will have special inspector on site.
BLD-Conference7/13/20097/14/20097/14/2009APASS
DetailsTom Arcoraci
Mike Phone #: ###-####
Inspection Record Card- Bld  7/13/2009 DONE
Issue PAID IN FULL permit  7/13/2009 DONE
DetailsAlexandra L. DeYoung
Plan assigned to (SRZ)5/29/20096/2/20096/18/2009 PASS
DetailsSam Zahorka
6/18/2009 10:20:06 SRZ - activity updated through activity BLDA022 from case BLD09-00808.
Routing - PLAN CHECK6/17/2009 6/18/2009 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  6/18/2009 DONE
DetailsSam Zahorka
Inspection Record Card- Bld  6/18/2009 DONE
Details
Permit Ready to Issue  6/18/2009 DONE
Telephone call  6/18/2009 DONE
Called Monica left message permit ready and fee given Also need GC,RCE# AND RP before we can issue this permit.
Routing - PLAN CHECK6/12/2009 6/17/2009 PASS
DetailsSam Zahorka
Do not issue until the Zoning Certificate has been approved.
Routing - Design Review6/17/2009 6/17/2009 PASS
DetailsJosh Wilson
Josh Wilson - CZC09-00096
Routing - FIRE6/9/20096/9/20096/12/2009 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  6/12/2009 PASS
Route to Impact Fee Review6/9/20096/12/20096/10/2009 PASS
DetailsCindy M. Gould
fueling station only, no buildings listed on permit, therefore no impact fees apply.
Case Summary (BLD)  6/9/2009 DONE
DetailsSam Zahorka
Routing - PLAN CHECK6/2/2009 6/9/2009 PASS
DetailsSam Zahorka
Routed to Fire.
Case Summary (BLD)  6/8/2009 DONE
DetailsSam Zahorka
Routing - PLUMBING6/1/2009 6/2/2009 PASS
DetailsBill VanDegrift
no plumbing
Routing - PUBLIC WORKS5/29/2009 6/1/2009 PASS
DetailsBeverly Hall
Routing - Erosion and Sediment6/1/2009 6/1/2009 PASS
DetailsSteven Webb
ESC plan waiver approved with attached conditions. ESC09-00294
Pending Assignment by JCB5/29/2009 5/29/2009 DONE
DetailsJason Blais
Routing PW Drainage5/29/2009 5/29/2009 PASS
DetailsBrian Murphy
jersey barriers to have holes on bottom for storm water
Routing PW Sewer Rating5/29/2009 5/29/2009 PASS
DetailsConnie Baumgartner
Application received 5/27/2009