First Notice | 10/5/2011 | 10/5/2011 | 10/6/2011 | | DONE |
Jim Sly
|
|
|
|
BLD-Final | 10/5/2011 | 10/5/2011 | 10/5/2011 | P | PASS |
Jim Sly
|
|
|
call 30 min prior to meet//Jesse Phone #: ###-#### Final inspection PASS
|
DOC - Permit Finaled | 10/5/2011 | 10/5/2011 | 10/5/2011 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 10/4/2011 | 10/4/2011 | 10/4/2011 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 10/3/2011 | 10/3/2011 | 10/3/2011 | P | CANC |
Troy Cobbley
|
|
|
Jesse Phone #: ###-####
|
BLD-Final | 9/29/2011 | 9/30/2011 | 9/30/2011 | P | PEND |
Jim Sly
|
|
|
Called.....Need Fire Final Insp.
|
FIRE-Conference | 9/22/2011 | 9/29/2011 | 9/30/2011 | A | DONE |
Troy Cobbley
|
|
|
Follow up on permit status with John blake ###-#### or jerry ###-####
|
FIRE-Final Inspection | 9/29/2011 | 9/30/2011 | 9/30/2011 | A | FAIL |
Troy Cobbley
|
|
|
Provide fire dept access curb painting as discussed.
|
FIRE-Final Inspection | 9/23/2011 | 9/27/2011 | 9/27/2011 | A | CANC |
Troy Cobbley
|
|
|
Jesse Phone #: ###-####
|
PubWorks Occupancy Approval | 9/27/2011 | 9/27/2011 | 9/27/2011 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 9/23/2011 | 9/27/2011 | 9/27/2011 | A | CANC |
Jim Sly
|
|
|
jesse Phone #: ###-####
|
Inspection Record Card- Bld | | | 9/23/2011 | | DONE |
Tisha Gallop
|
|
|
|
FIRE-Conference | 9/6/2011 | 9/20/2011 | 9/22/2011 | A | DONE |
Troy Cobbley
|
|
|
I spoke to Jesse about the permit status
|
FIRE-Final Inspection | 9/2/2011 | 9/6/2011 | 9/6/2011 | A | DONE |
Troy Cobbley
|
|
|
I spoke to jerry at ###-#### and he said to call John blake at ###-####. I left a message on John's voice mail.
|
Inspection Record Card- Bld | | | 9/1/2011 | | |
Barbara Stitt
|
|
|
|
BLD-Aging Inspection | 4/11/2011 | 4/11/2011 | 4/18/2011 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Final | 9/24/2009 | 9/24/2009 | 9/24/2009 | P | NR |
Jim Sly
|
|
|
WIP
|
Routing - PLAN CHECK | 6/9/2009 | | 6/10/2009 | | PASS |
Tisha Gallop
|
|
|
Tisha
|
Case Summary (BLD) | | | 6/10/2009 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 6/10/2009 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 6/10/2009 | | DONE |
Tisha Gallop
|
|
|
Called Jason Densmer w/the Land Group and told him permit ready, fees and need RP
|
Permit Ready to Issue | | | 6/10/2009 | | DONE |
Tisha Gallop
|
|
|
|
Issue PAID IN FULL permit | | | 6/10/2009 | | DONE |
Tisha Gallop
|
|
|
|
Plan resubmittals received | | | 6/9/2009 | | |
Tisha Gallop
|
|
|
received the second set of erosion narrative, routed to erosion
|
Routing - Erosion and Sediment | 6/9/2009 | | 6/9/2009 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions. ESC09-00298
|
Plan resubmittals received | | | 6/8/2009 | | |
Tisha Gallop
|
|
|
received one copy of narrative; called Tracy at C & A Paving told her need 2 copies of narrative to reroute to erosion.
|
1st review completed | | | 6/5/2009 | | FAIL |
|
|
|
Failed Erosion & Soil Control
|
Routing - FIRE | 6/4/2009 | | 6/5/2009 | | PASS |
Scott Arellano
|
|
|
No seperate comments attached.
|
Routing - Erosion and Sediment | 6/3/2009 | | 6/4/2009 | | FAIL |
Steven Webb
|
|
|
ESC09-00298 plan waiver failed due to the size of project area.
|
Routing - PLANNING | 6/4/2009 | | 6/4/2009 | | PASS |
Cody Riddle
|
|
|
no change
|
Routing - PUBLIC WORKS | 6/1/2009 | | 6/3/2009 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Drainage | 6/1/2009 | | 6/3/2009 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLANNING Land Div | 6/1/2009 | | 6/1/2009 | | PASS |
Dave Abo
|
|
|
Site is over 5 acres (9.5 acres) in size.
|
Routing - Addressing | 6/1/2009 | | 6/1/2009 | | PASS |
April Wing
|
|
|
|
Application received | | 5/29/2009 | 5/29/2009 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/29/2009 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/29/2009 | | DONE |
Tisha Gallop
|
|
|
|