Third Notice | | 10/2/2009 | 9/22/2009 | | DONE |
|
|
|
|
Second Notice | | 9/27/2009 | 9/22/2009 | | DONE |
|
|
|
|
First Notice | | 8/27/2009 | 9/17/2009 | | DONE |
|
|
|
|
Permanent Occupancy UNPAID FEE | | | 8/27/2009 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 8/26/2009 | 8/26/2009 | 8/26/2009 | P | PASS |
Dave Hannah
|
|
|
Nathan Phone #: ###-#### ok for perm occ
|
Zoning Approval | 8/21/2009 | 8/21/2009 | 8/21/2009 | | PASS |
Andrea Tuning
|
|
|
The applicant has updated the buildign plans and restriped the site to match the approval.
|
Temporary Occupancy UNPAID FEE | | | 8/21/2009 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 8/17/2009 | 8/18/2009 | 8/18/2009 | P | PART |
Jim Storey
|
|
|
Phone #: ###-#### need p$z sign off/ ada vertical bar installed. ok for temp upon aproval from others.
|
BLD-Final | 8/12/2009 | 8/18/2009 | 8/18/2009 | A | NR |
Jim Storey
|
|
|
Nathan Phone #: ###-#### pending p$z
|
FIRE-Final Inspection | 8/17/2009 | 8/18/2009 | 8/18/2009 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Zoning Approval | 8/18/2009 | 8/18/2009 | 8/18/2009 | | FAIL |
Andrea Tuning
|
|
|
The parkign striping is in the incorrect location, the enitre site is not striped, the windows on the north and south elevations are not the correct size and do not show the sils on two of the windows, the storefront door system was installed in reverse, the door on the west elevation is cream as opposed to blue. The applicant was instructed to restripe the parking area in the correct location and provide DR and building staff with revised drawings of the building as it has been built for the building plans and the DR file. 8-18-09 ANT
|
FIRE-Final Inspection | 8/12/2009 | 8/14/2009 | 8/14/2009 | A | FAIL |
Troy Cobbley
|
|
|
Provide "Door to remain....." sticker at the main exit, provide correct address numbers atleast 4" in size and install single action hardware on the restroom door.
|
Issue PAID IN FULL permit | | | 6/17/2009 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/12/2009 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/12/2009 | | DONE |
|
|
|
|
Telephone call | | | 6/12/2009 | | DONE |
Barbara Stitt
|
|
|
Called and told Bill with Design Resources that permit is ready, fees due, also need GC and their RC # and RP///6-12-09 @ 10:30am BAS
|
Plan assigned to (TLW) | 6/1/2009 | | 6/11/2009 | | PASS |
Tim L. Woodard
|
|
|
6/11/2009 16:17:28 TLW - activity updated through activity BLDA022 from case BLD09-00838.
|
Routing - PLAN CHECK | 6/2/2009 | | 6/11/2009 | | PASS |
Tim L. Woodard
|
|
|
Approved with redlines and plan review report. TLW
|
Routing - FIRE | | | 6/11/2009 | | PASS |
Tim L. Woodard
|
|
|
Field Verify
|
1st review completed | | | 6/11/2009 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/11/2009 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 6/11/2009 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - Erosion and Sediment | 6/11/2009 | | 6/11/2009 | | PASS |
Tim L. Woodard
|
|
|
Waiver letter approved. Applicant must comply with the attached conditions. TLW
|
Routing - PUBLIC WORKS | 6/1/2009 | | 6/2/2009 | | PASS |
Beverly Hall
|
|
|
|
Routing - PLUMBING | 6/2/2009 | | 6/2/2009 | | PASS |
Bill VanDegrift
|
|
|
min. grade on 2" and 3" waste is 1/4", min building drain is 4". MIN. 2" dcva required on service. thermol expansion protection required. min. toilet vent is 2". provide cleanouts per upc. additional cross connection protection may be required.
|
Routing - PLAN CHECK | 6/1/2009 | | 6/1/2009 | | PEND |
Tim L. Woodard
|
|
|
Routed to Public Works for review before the actual Plan Review.
|
Plans ACCEPTED BY PLAN TECH | | | 5/29/2009 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/29/2009 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | 5/29/2009 | | | |
|
|
|
|