Permit Information
Permit NumberBLD09-00842
StatusFinaled
Name FLYNNER HOMES
Site Address 2719 N 26TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is to include the razing of an existing single family dwelling on this parcel and then to construct a new 3324s.f. 2-story single family dwelling in its place. The new dwelling is to have 2071s.f. on the main level and 1253s.f. on the upper level that extends over the 819s.f. 2-car drive through garage. THE SPECIFIC TRUSS ENGINEERING AND SPECIFIC FOUNDATION SIZING AS THE SUPPLIED TRUSS ENGINEERING AND THE FOUNDATION PLAN DO NOT MATCH. AN ENGINEER IS ALSO TO ADDRESS THE UPLIFT OF THE FRONT COVERED PORCH ROOF AREA FROM THE FOUNDATION TO POST TO BEAM TO TRUSS CONNECTIONS THIS AREA. R-1C ok per Colleen Carroll. All per the approved plans as marked REScheck and the plan review noted. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/9/200912/9/200912/9/2009PPASS
DetailsTony Young
JONATHAN Phone #: ###-####
c/n made ok at this point in time
DOC - Permit Finaled12/9/200912/9/200912/9/2009PPASS
DetailsTony Young
c of c issued
BLD-Final12/3/200912/3/200912/3/2009PFAIL
DetailsTony Young
Johnathon-please call for access information Phone #: ###-####
c/n posted
BLD-Energy code compliance9/14/20099/14/20099/15/2009PPASS
DetailsTony Young
jonathan Phone #: ###-####
BLD-Framing/Rough-in9/14/20099/14/20099/14/2009PPASS
DetailsTony Young
jonathan Phone #: ###-####
BLD-Framing/Rough-in9/9/20099/9/20099/9/2009PPART
DetailsTony Young
Johnathan Phone #: ###-####
c/n on site set of plans,, need reviewed plans next time at energy inspection,, ok to insulate,, met w/ framer on c/n
BLD-Foundation7/14/20097/15/20097/15/2009APART
DetailsTony Young
sabastion Phone #: ###-####
wip
BLD-Footing7/13/20097/14/20097/15/2009PPART
DetailsTony Young
sebastian Phone #: ###-####
wip,, need to dig ftgs out deeper
Issue PAID IN FULL permit  6/18/2009 DONE
DetailsAlexandra L. DeYoung
Telephone call  6/11/2009 DONE
Details
left message at ###-#### - permit ready and fees given
Permit Ready to Issue  6/11/2009 DONE
Details
Plan assigned to (PEP)6/4/20096/4/20096/10/2009 PASS
DetailsPerry Paine
6/10/2009 10:33:01 PEP - activity updated through activity BLDA022 from case BLD09-00842.
Route to Impact Fee Review5/29/20096/3/20096/10/2009 PASS
DetailsCindy M. Gould
No fees, this house replaces one that is to be demolished.
Case Summary (BLD)  6/10/2009  
Inspection Record Card- Bld  6/10/2009  
1st review completed  6/10/2009 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/10/2009 DONE
Case Summary (BLD)  6/10/2009  
Routing - PLAN CHECK6/3/2009 6/10/2009 PASS
DetailsPerry Paine
Plan assigned to (CDM)5/29/20095/29/20096/4/2009 DONE
DetailsCarl D Madsen
Routing - Addressing5/29/2009 6/3/2009 PASS
DetailsApril Wing
Routing - PUBLIC WORKS6/3/2009 6/3/2009 PASS
DetailsConnie Baumgartner
Routing - PLANNING6/3/2009 6/3/2009 PASS
DetailsColleen T Carroll
Application received 5/29/2009