Permit NumberBLD09-00857
StatusFinaled
Name KING EXCAVATION
Site Address 4655 S ENTERPRISE ST
Project NameAIRPORT CUSTOMS
Customer Number 
ePlanReviewNo
Description
Boise Airport - Customs and Border Protection Facility - To construct a new 5,145 square foot, one story Customs and Boarder Protection small plane international flight customs terminal. This terminal will be constructed of masonry exterior walls with steel structural roof and interior frame construction. This permit will also include related site improvements. This building will be fully fire sprinkled. There is an existing warehouse building that is being demolished and removed at the building site. The demolition is being done under permit BLD09-00404. All construction per the approved plans and attached comment list. DRH08-00377 JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 5/7/20115/2/2011 DONE
First Notice 4/8/20114/27/2011 DONE
Permanent Occupancy  3/29/2011 DONE
DetailsBarbara Stitt
BLD-Final3/24/20113/25/20113/24/2011APASS
DetailsJim Storey
DOC - Permit Finaled3/24/20113/24/20113/24/2011PPASS
DetailsJim Storey
DOC - Permit Finaled3/24/20113/24/20113/24/2011PPASS
DetailsJim Storey
BLD-Final3/24/20113/24/20113/24/2011PDEFR
DetailsJim Storey
nh
Print Occupancy Form  3/24/2011 DONE
Change Expiration Date Only  2/24/2011 DONE
DetailsBarbara Stitt
Temp Occupancy extension approved per Bob Archibald for 4-1-11//BAS
Extend Permit 90/180 days2/23/20112/23/20112/23/2011PPASS
DetailsJim Storey
need north door hardware per bo letter on file extention granted til 4/1/2011
BLD-Final2/22/20112/23/20112/23/2011AFAIL
DetailsJim Storey
rachel - please call for access Phone #: ###-#### or ###-#### need north door hardware per bo letter on file extention granted til 4/1/2011
BLD-Final2/22/20112/22/20112/23/2011PDEFR
DetailsJim Storey
rachel - please call for access Phone #: ###-#### or ###-####
PubWorks Occupancy Approval1/31/20111/31/20111/31/2011 DONE
DetailsTiffany Lowery
Temporary Occupancy11/30/20102/28/201111/30/2010 DONE
DetailsTisha Gallop
pending PW and Building sign off for perm
Zoning Approval11/30/201011/30/201011/30/2010 PASS
DetailsJosh Wilson
Final OK
PubWorks Occupancy Approval11/30/201011/30/201011/30/2010 PART
DetailsBrian Murphy
temp occ ok. Need letter from engineer noting drainage was completed per plan.
BLD-Final11/19/201011/19/201011/19/2010PPART
DetailsJim Storey
duane Phone #: ###-#### temp ok/ singage/ plank out/ hardware change out on order. ok for temp for it work.
FIRE-Final Inspection11/19/201011/19/201011/19/2010PPASS
DetailsForrest France
Fire life safety finaled. Note- door hardware approved per Building Official J. Blais. Refer to architects letter on file.
FIRE-Final Inspection10/25/201010/27/201010/28/2010AFAIL
DetailsForrest France
Refer to item #9 on the fire code review regarding door hardware, missing one EM light in the conference room.
BLD-Final10/27/201010/28/201010/28/2010ACANC
DetailsJim Storey
ryan Phone #: ###-####
BLD-Final10/21/201010/22/201010/22/2010PNR
DetailsJim Storey
ryan Phone #: ###-#### no fire alarm permit issued pending aproval and insp.
BLD-Conference10/21/201010/22/201010/22/2010APASS
DetailsJim Storey
ryan Phone #: ###-####
FIRE-Final Inspection10/21/201010/22/201010/22/2010ACANC
DetailsTroy Cobbley
No life safety inspection was performed due to two project related FIR permits not being called in, one of which is still in the REV status due to a resubmittal. I also noted that the address posted on the building is not the address listed on the city approved plans. I spoke to Ryan about these issues and what to due for next week.
BLD-Framing/Rough-in9/7/20109/8/20109/8/2010APART
DetailsJim Sly
final t-grid inspection please-Ryan-Please call at least 30 mins prior to inspection Phone #: ###-####
All Grid.....OK.
BLD-Other7/14/20107/14/20107/14/2010PPASS
DetailsJim Storey
Mark - ceiling grid Phone #: ###-#### hard lids
BLD-Framing/Rough-in6/18/20106/21/20106/21/2010PPASS
DetailsJim Storey
instaltion of backing for ada.
BLD-Energy code compliance6/17/20106/18/20106/18/2010APASS
DetailsJim Storey
Mark Phone #: ###-####
BLD-Framing/Rough-in6/10/20106/10/20106/10/2010PPASS
DetailsJim Storey
mark Phone #: ###-####
BLD-Aging Inspection4/19/20104/19/20104/19/2010 PASS
DetailsJim Storey
under si
BLD-Foundation2/12/20102/12/20102/12/2010PPASS
DetailsJim Storey
John Phone #: ###-####
BLD-Footing2/8/20102/9/20102/9/2010APASS
DetailsJim Storey
John Phone #: ###-####
Issue PAID IN FULL permit  1/19/2010 DONE
Permit Ready to Issue  10/29/2009 DONE
Routing - PLAN CHECK10/8/2009 10/8/2009 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  10/8/2009 DONE
DetailsJohn Menard
Print Occupancy Form  10/8/2009 DONE
Routing - PUBLIC WORKS10/5/2009 10/8/2009 PASS
DetailsBeverly Hall
Plan assigned to (JCM)6/3/2009 10/8/2009 PASS
DetailsJohn Menard
10/8/2009 10:39:59 JCM - activity updated through activity BLDA022 from case BLD09-00857.
Routing PW Drainage10/5/2009 10/7/2009 PASS
DetailsBrian Murphy
Plan resubmittals received  10/6/2009  
DetailsBrian Murphy
rec'd 5 copies of sheets C2.2; C4.3- taken to Brian M
Plan Reviewer's activity  9/22/2009 PASS
DetailsJohn Menard
Reviewed and approved final nonstructural revisions. JCM
Routing - Erosion and Sediment9/21/2009 9/21/2009 PASS
DetailsSteven Webb
ESC plan approved with attached conditions. ESC09-00312
Routing - FIRE9/15/2009 9/21/2009 PASS
DetailsScott Arellano
Attached updated IFC comments to plans
Plan resubmittals received  9/16/2009  
DetailsTisha Gallop
received 2 copies of ESC narratives; put into plans by LEG and taken back to Fire review
Routing - Erosion and Sediment9/14/2009 9/15/2009 FAIL
DetailsSteven Webb
ESC submittals did not include narrative or the ESC permit application. Informed applicant, M. Gier (CSHQA) that information is needed prior to performing a plan review. ESC09-00312.
Plan resubmittals received  9/14/2009  
DetailsTisha Gallop
Received response letter and three copies of sheet C2.3 and two copies of sheets A5.1, A2.1, F0.1; inserted into plans by arch. rep. and taken back to Brian Murphy
Routing - PUBLIC WORKS9/8/2009 9/14/2009 FAIL
DetailsConnie Baumgartner
Failed by Brian Murphy-contact at ###-####
Routing PW Drainage9/9/2009 9/12/2009 FAIL
DetailsBrian Murphy
NEEDS TO TREAT BASIN B WATER QUILITY STORM. BRIAN MURPHY ###-####
Routing PW Sewer Design9/9/2009 9/9/2009 PASS
DetailsJon R. Gunnerson
Sewer Tap Permit required.
Routing - PLAN CHECK6/29/2009 9/8/2009 FAIL
DetailsJohn Menard
Plan Reviewer's activity  9/8/2009 PASS
DetailsJohn Menard
Reviewed and approved structural revisions. JCM
Plan resubmittals requested  9/8/2009 DONE
DetailsJohn Menard
E-mailed the architect requesting additional revision. JCM
Plan resubmittals received  9/3/2009  
DetailsTisha Gallop
received response letter and comments, three copies of Drainage Report and plan sheets C0.1, C0.2, C1.1, ECP, C2.1, C2.2, C2.3, C3.1, C3.2, C4.1, C4.2, C4.3, L1.1, L1.2, A1.1, A2.1, A2.3, A3.2, A4.1, A4.2, A5.1, A6.1, A8.1, A8.3, A9.1, V1.0, S0.1, S1.1, S3.1, P4.1, E1.0, E1.1, E2.1, E4.1, E5.1, T0.1, T0.2, T1.0, T2.1; inserted by arch. rep. and taken back to John Menard
Routing - FIRE6/24/20096/24/20096/29/2009 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
1st review completed  6/29/2009 FAIL
Failed Public Works, Erosion & Soil Control, Plan Check, Fire
Route to Impact Fee Review6/24/20096/29/20096/24/2009 PASS
DetailsDonna Wolf
Change in use - demo 4,000 sq ft, new 5,145 sq ft. Fees on difference.
Plan resubmittals requested  6/24/2009 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural and nonstructural plan review comments requesting revisions. JCM
Routing - PLAN CHECK6/17/2009 6/24/2009 FAIL
DetailsJohn Menard
Routing Off Site - STRUCTURAL6/4/2009 6/18/2009 FAIL
DetailsJohn Menard
Called Action Couriers for pick up - Received comments from consulting structural engineer requesting revisions. JCM
Routing - PLANNING6/16/2009 6/17/2009 PASS
DetailsJosh Wilson
Routing - PLUMBING6/15/2009 6/16/2009 PASS
DetailsBill VanDegrift
if chemical station is installed at the mop sink provide a water supply for it. BFP-1 to be a DCVA
Routing - Erosion and Sediment6/12/2009 6/15/2009 FAIL
DetailsSteven Webb
Routing submittals did not include a ESC/SWPPP narrative as required. Notified applicant.
Routing - PUBLIC WORKS6/4/2009 6/12/2009 FAIL
DetailsBeverly Hall
Routing PW Drainage6/10/2009 6/12/2009 FAIL
DetailsBrian Murphy
talked to matt petia airport he said he most likly does not want a pond with water in it much of the year as it may be an attractant for wildlife ect. BRIAN MURPHY ###-####
Routing PW Sewer Rating6/8/2009 6/10/2009 PASS
DetailsConnie Baumgartner
Routing PW Solid Waste6/9/2009 6/9/2009 PASS
DetailsPeter J. McCullough
Routing PW Street Lights  6/8/2009 PASS
Routing PW Sewer Design6/5/2009 6/8/2009 FAIL
DetailsJon R. Gunnerson
Engineer to resubmit utility plans. Sewer service connection to be made into mainline, NOT in manhole.
Routing - Addressing6/4/2009 6/4/2009 PASS
DetailsApril Wing
Plan routing begun/NEW & ADDTN  6/4/2009 DONE
Routing - PLANNING Land Div6/4/2009 6/4/2009 PASS
DetailsDave Abo
Existing structure on parcel that was annexed in 1974.
Plans ACCEPTED BY PLAN TECH  6/4/2009 DONE
DetailsDarla L Downs
Pending Assignment by JCM6/3/2009 6/3/2009 BLDA
DetailsJohn Menard
6/3/2009 14:33:22 JCM - activity updated through activity BLDA166 from case BLD09-00857.
Application received 6/3/2009