Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD09-00872
StatusFinaled
Name BIG D BUILDERS
Site Address 1625 E YAMHILL RD
Project NameJ M THOMAS LUMBER STORAGE BLDG
Customer Number 
ePlanReviewNo
Description
J M Thomas Lumber Storage Warehouse Building #2 - To constructed a new 9,800 square foot, one story, pre-engineered wood storage building and related site improvements. This building is replacing a demolished warehouse. This building is being constructed over an existing concrete slab. The required accessible plumbing fixtures are located within 500 feet at the existing office building. There is no plumbing or mechanical work being done in this building. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  5/13/2013 DONE
First Notice 8/20/20108/26/2010 DONE
Permanent Occupancy  8/10/2010 DONE
BLD-Final8/2/20108/3/20108/3/2010APASS
DetailsJim Storey
Shawn or Brian Phone #: ###-####
Print Occupancy Form  8/3/2010 DONE
Office Staff conference/action  8/3/2010 DONE
DetailsBarbara Stitt
E-mail to ACHD requesting approval to for Perm occupancy///8-3-10
FIRE-Final Inspection7/6/20107/9/20107/9/2010APASS
DetailsForrest France
Life safety inspection passed.
Zoning Approval7/7/20107/7/20107/7/2010 PASS
DetailsAndrea Tuning
BLD-Aging Inspection6/29/20106/29/20106/30/2010 PART
DetailsJim Storey
BLD-Conference6/29/20106/30/20106/30/2010APART
DetailsJim Storey
talked with owner to complet insp,
Application received 6/5/20096/5/2010 DONE
DetailsTisha Gallop
Case Summary (BLD)  6/4/2010 DONE
DetailsTisha Gallop
BLD-Aging Inspection4/28/20104/28/20104/28/2010 PASS
DetailsTom Arcoraci
BLD-Aging Inspection2/24/20102/24/20102/24/2010 PASS
DetailsJim Storey
work in progress
BLD-Aging Inspection12/16/200912/16/200912/16/2009 PASS
DetailsJim Storey
BLD-Conference12/16/200912/16/200912/16/2009APASS
DetailsJim Storey
wip
BLD-Aging Inspection10/7/200910/7/200910/7/2009 PASS
DetailsJim Storey
wip
BLD-Foundation8/5/20098/6/20098/6/2009APASS
DetailsJim Storey
todd - retaining wall Phone #: ###-####
BLD-Footing8/4/20098/5/20098/5/2009APASS
DetailsJim Storey
jared Phone #: ###-####
BLD-Footing7/20/20097/21/20097/21/2009APART
DetailsJim Storey
craig - pouring at 10:30 Phone #: ###-#### si pending wip ok
Issue PAID IN FULL permit  7/20/2009 DONE
OVERRIDE  6/25/2009  
Telephone call  6/25/2009 DONE
Details
t/c w rick bugatsch at ###-#### - permit ready and fees given - also need ACHD receipt
Permit Ready to Issue  6/25/2009 DONE
Details
Route to Impact Fee Review6/19/20096/24/20096/24/2009 PASS
DetailsDonna Wolf
New development - demo more than 12 mos.
Plan assigned to (JCM)6/5/2009 6/24/2009 PASS
DetailsJohn Menard
6/24/2009 11:20:24 JCM - activity updated through activity BLDA022 from case BLD09-00872.
Routing - PLAN CHECK6/22/2009 6/24/2009 PASS
DetailsJohn Menard
Plan resubmittals received  6/24/2009  
DetailsJohn Menard
Rec'd one transmittal letter, and two copies of sheet S1- inserted by arch taken to John M
Plan Reviewer's activity  6/24/2009 PASS
DetailsJohn Menard
Reviewed and approved structural revision. JCM
PLANS/APPL TAKEN TO FRONT DESK  6/24/2009 DONE
DetailsJohn Menard
Print Occupancy Form  6/24/2009 DONE
Details
Routing - FIRE6/19/20096/19/20096/22/2009 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  6/22/2009 FAIL
Failed Structural
Plan Reviewer's activity  6/19/2009 PASS
DetailsJohn Menard
Reviewed and approved nonstructural code items with attached comment list. JCM
Routing - PLAN CHECK6/18/2009 6/19/2009 PASS
DetailsJohn Menard
Plan resubmittals requested  6/19/2009 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural review requesting revisions. JCM
Routing - PLANNING6/18/2009 6/18/2009 PASS
DetailsAndrea Tuning
DRH09-00077 Andrea
Routing - Erosion and Sediment6/16/2009 6/18/2009 PASS
DetailsSteven Webb
ESC09-00316 approved with attached modified conditions.
Routing - PUBLIC WORKS6/5/2009 6/16/2009 PASS
DetailsBeverly Hall
Routing PW Solid Waste  6/16/2009 PASS
DetailsPeter J. McCullough
Routing Off Site - STRUCTURAL6/5/2009 6/11/2009 FAIL
DetailsJohn Menard
Received comment list from consulting structural engineer requesting one minor revision. JCM
Routing PW Drainage6/8/2009 6/10/2009 PASS
DetailsBrian Murphy
Routing PW Street Lights  6/10/2009 PASS
DetailsHank Alarcon
Routing - Addressing6/5/2009 6/5/2009 PASS
DetailsApril Wing
Routing - PLANNING Land Div6/5/2009 6/5/2009 PASS
DetailsDave Abo
Parcel over 5 acres in size. (13.92 acres)
Pending Assignment by JCM6/5/2009 6/5/2009 BLDA
DetailsJohn Menard
6/5/2009 11:57:27 JCM - activity updated through activity BLDA166 from case BLD09-00872.
Plans ACCEPTED BY PLAN TECH  6/5/2009 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  6/5/2009 DONE
DetailsTisha Gallop