Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD09-00888
StatusFinaled
Name CM COMPANY
Site Address 1507 N 28TH ST
Project NameLOWELL ELEMENTARY SCHOOL
Customer Number 
ePlanReviewNo
Description
(LOWELL ELEMENTARY - MAINTENANCE GARAGE) Construct a new 692 sq. ft. maintenance garage per approved plans. Work to include site preparation for new reinforced concrete footings, stem wall, floor slab with reinforced masonry walls and wood truss's, roof sheathing and asphalt covering with two roll up doors and one man door wth landings per code. Permit BLD09-00887 is also attached to the same set of plans for a remodel to the existing school building.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 10/16/201010/19/2010 DONE
final value included with Bld09-00887
Second Notice 10/4/201010/11/2010 DONE
First Notice 9/18/20109/24/2010 DONE
Permanent Occupancy  9/8/2010 DONE
BLD-Final8/12/20108/12/20108/13/2010PPASS
DetailsTony Young
Jim Phone #: ###-####
BLD-Final8/11/20108/12/20108/12/2010APASS
DetailsTony Young
Jim Phone #: ###-####
BLD-Final7/30/20108/2/20108/10/2010APART
DetailsTony Young
Jim Phone #: ###-####,, need final letter from achitect or engineer
Telephone call  8/5/2010 DONE
Bud from CDHD called and said everything is ok for them.
BLD-Final7/30/20107/30/20108/3/2010PPART
DetailsTony Young
Bill Phone #: ###-####
BLD-Final7/29/20107/30/20108/2/2010PPART
DetailsTony Young
Jim Phone #: ###-####,, ok for temp occupancy
FIRE-Final Inspection7/23/20107/26/20107/26/2010PPASS
DetailsForrest France
Corrections finished. Fire life safety finaled.
FIRE-Final Inspection7/22/20107/23/20107/23/2010APART
DetailsForrest France
Final pending one fire extinguisher to be posted as discussed.
BLD-Aging Inspection5/27/20105/27/20105/28/2010 PASS
DetailsTony Young
BLD-Conference5/27/20105/28/20105/28/2010APASS
DetailsTony Young
Jim Stubbs Phone #: ###-####
stair ?s
BLD-Framing/Rough-in10/29/200910/30/200910/30/2009APART
DetailsTony Young
rob Phone #: ###-####
maint. shop ok
BLD-Footing9/10/20099/11/20099/11/2009APART
DetailsTony Young
Rob Phone #: ###-####
trash enclosure ftgs, and maint. building ftgs ok,, pending special inspector report
Print Occupancy Form  7/30/2009 DONE
Details
Telephone call  7/30/2009 DONE
Details
left message w peggy for gregg at ###-#### - permit ready and fees given - also need gc name, rce# and ACHD receipt
Permit Ready to Issue  7/30/2009 DONE
Details
Issue PAID IN FULL permit  7/30/2009 DONE
Routing - PLAN CHECK7/6/2009 7/29/2009 PASS
DetailsDan Stuart
To permit desk to issue.
Routing PW Drainage7/29/2009 7/29/2009 PASS
DetailsBrian Murphy
Approval is on BPD09-00887
Telephone call  7/29/2009 DONE
Called Cheyne Weston, Parks & Rec to see if he had any problem with me issuing the permit for Lowell Elementary for parking lot overlay that included a portion of the City property just south of Lowell Pool. He does not have a problem.
PLANS/APPL TAKEN TO FRONT DESK  7/29/2009 PASS
Print Pending Permit.LaserJet4  7/29/2009  
Case Summary (BLD)  7/29/2009  
Plan assigned to (DRS)6/9/2009 7/29/2009 PASS
DetailsDan Stuart
7/29/2009 15:53:05 DRS - activity updated through activity BLDA022 from case BLD09-00888.
Routing - PUBLIC WORKS7/29/2009 7/29/2009 PASS
DetailsBeverly Hall
Routing PW Sewer Rating7/29/2009 7/29/2009 PASS
DetailsConnie Baumgartner
Routing PW Flood Plain6/15/2009 7/29/2009 PASS
DetailsJim Wyllie
Easement document received 7/29/09 bh
Route to Impact Fee Review7/2/20097/8/20097/6/2009 PASS
DetailsCindy M. Gould
Routing - FIRE7/2/20097/2/20097/6/2009 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  7/6/2009 FAIL
Failed Public Works
Routing - PLAN CHECK6/24/2009 7/2/2009 PASS
DetailsDan Stuart
Routing - PLANNING  6/25/2009 PASS
DetailsJoshua Johnson
Josh Johnson CUP09-00019
Routing PW Solid Waste6/16/2009 6/16/2009 PASS
DetailsPeter J. McCullough
Gates must open 120 degrees, bollards to be moved per Architect.
Contact, Peter McCullough, ###-####
Routing PW Drainage6/10/2009 6/15/2009 FAIL
DetailsBrian Murphy
NEEDS REVISIONS BRIAN MURPHY ###-####
Routing - Addressing6/10/2009 6/10/2009 PASS
DetailsApril Wing
Pending Assignment by JCB6/8/2009 6/9/2009 DONE
DetailsJason Blais
Plans ACCEPTED BY PLAN TECH  6/8/2009 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  6/8/2009 DONE
DetailsTisha Gallop
Intake Approval  6/8/2009 PASS
DetailsCarl D Madsen
Application received 6/8/2009   
Routing - Erosion and Sediment     
DetailsSteven Webb