Third Notice | | 10/16/2010 | 10/19/2010 | | DONE |
|
|
|
final value included with Bld09-00887
|
Second Notice | | 10/4/2010 | 10/11/2010 | | DONE |
|
|
|
|
First Notice | | 9/18/2010 | 9/24/2010 | | DONE |
|
|
|
|
Permanent Occupancy | | | 9/8/2010 | | DONE |
|
|
|
|
BLD-Final | 8/12/2010 | 8/12/2010 | 8/13/2010 | P | PASS |
Tony Young
|
|
|
Jim Phone #: ###-####
|
BLD-Final | 8/11/2010 | 8/12/2010 | 8/12/2010 | A | PASS |
Tony Young
|
|
|
Jim Phone #: ###-####
|
BLD-Final | 7/30/2010 | 8/2/2010 | 8/10/2010 | A | PART |
Tony Young
|
|
|
Jim Phone #: ###-####,, need final letter from achitect or engineer
|
Telephone call | | | 8/5/2010 | | DONE |
|
|
|
Bud from CDHD called and said everything is ok for them.
|
BLD-Final | 7/30/2010 | 7/30/2010 | 8/3/2010 | P | PART |
Tony Young
|
|
|
Bill Phone #: ###-####
|
BLD-Final | 7/29/2010 | 7/30/2010 | 8/2/2010 | P | PART |
Tony Young
|
|
|
Jim Phone #: ###-####,, ok for temp occupancy
|
FIRE-Final Inspection | 7/23/2010 | 7/26/2010 | 7/26/2010 | P | PASS |
Forrest France
|
|
|
Corrections finished. Fire life safety finaled.
|
FIRE-Final Inspection | 7/22/2010 | 7/23/2010 | 7/23/2010 | A | PART |
Forrest France
|
|
|
Final pending one fire extinguisher to be posted as discussed.
|
BLD-Aging Inspection | 5/27/2010 | 5/27/2010 | 5/28/2010 | | PASS |
Tony Young
|
|
|
|
BLD-Conference | 5/27/2010 | 5/28/2010 | 5/28/2010 | A | PASS |
Tony Young
|
|
|
Jim Stubbs Phone #: ###-#### stair ?s
|
BLD-Framing/Rough-in | 10/29/2009 | 10/30/2009 | 10/30/2009 | A | PART |
Tony Young
|
|
|
rob Phone #: ###-#### maint. shop ok
|
BLD-Footing | 9/10/2009 | 9/11/2009 | 9/11/2009 | A | PART |
Tony Young
|
|
|
Rob Phone #: ###-#### trash enclosure ftgs, and maint. building ftgs ok,, pending special inspector report
|
Print Occupancy Form | | | 7/30/2009 | | DONE |
|
|
|
|
Telephone call | | | 7/30/2009 | | DONE |
|
|
|
left message w peggy for gregg at ###-#### - permit ready and fees given - also need gc name, rce# and ACHD receipt
|
Permit Ready to Issue | | | 7/30/2009 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/30/2009 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/6/2009 | | 7/29/2009 | | PASS |
Dan Stuart
|
|
|
To permit desk to issue.
|
Routing PW Drainage | 7/29/2009 | | 7/29/2009 | | PASS |
Brian Murphy
|
|
|
Approval is on BPD09-00887
|
Telephone call | | | 7/29/2009 | | DONE |
|
|
|
Called Cheyne Weston, Parks & Rec to see if he had any problem with me issuing the permit for Lowell Elementary for parking lot overlay that included a portion of the City property just south of Lowell Pool. He does not have a problem.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/29/2009 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 7/29/2009 | | |
|
|
|
|
Case Summary (BLD) | | | 7/29/2009 | | |
|
|
|
|
Plan assigned to (DRS) | 6/9/2009 | | 7/29/2009 | | PASS |
Dan Stuart
|
|
|
7/29/2009 15:53:05 DRS - activity updated through activity BLDA022 from case BLD09-00888.
|
Routing - PUBLIC WORKS | 7/29/2009 | | 7/29/2009 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Sewer Rating | 7/29/2009 | | 7/29/2009 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Flood Plain | 6/15/2009 | | 7/29/2009 | | PASS |
Jim Wyllie
|
|
|
Easement document received 7/29/09 bh
|
Route to Impact Fee Review | 7/2/2009 | 7/8/2009 | 7/6/2009 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - FIRE | 7/2/2009 | 7/2/2009 | 7/6/2009 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 7/6/2009 | | FAIL |
|
|
|
Failed Public Works
|
Routing - PLAN CHECK | 6/24/2009 | | 7/2/2009 | | PASS |
Dan Stuart
|
|
|
|
Routing - PLANNING | | | 6/25/2009 | | PASS |
Joshua Johnson
|
|
|
Josh Johnson CUP09-00019
|
Routing PW Solid Waste | 6/16/2009 | | 6/16/2009 | | PASS |
Peter J. McCullough
|
|
|
Gates must open 120 degrees, bollards to be moved per Architect.
Contact, Peter McCullough, ###-####
|
Routing PW Drainage | 6/10/2009 | | 6/15/2009 | | FAIL |
Brian Murphy
|
|
|
NEEDS REVISIONS BRIAN MURPHY ###-####
|
Routing - Addressing | 6/10/2009 | | 6/10/2009 | | PASS |
April Wing
|
|
|
|
Pending Assignment by JCB | 6/8/2009 | | 6/9/2009 | | DONE |
Jason Blais
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/8/2009 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/8/2009 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 6/8/2009 | | PASS |
Carl D Madsen
|
|
|
|
Application received | | 6/8/2009 | | | |
|
|
|
|
Routing - Erosion and Sediment | | | | | |
Steven Webb
|
|
|
|