First Notice | | 9/19/2010 | 9/20/2010 | | DONE |
|
|
|
Per Ken Fisher send FV bill to him.//Final value calcd by combining this permit and Bld10-00949 (interior demo).
|
Permanent Occupancy UNPAID FEE | | | 9/9/2010 | | DONE |
|
|
|
|
BLD-Final | 9/8/2010 | 9/8/2010 | 9/8/2010 | P | PASS |
Jim Sly
|
|
|
Please call 1/2 hour prior, thanks. Phone #: ###-#### >> Inspection requested via web by Darren Gossett OK for Perm Occ.
|
FIRE-Final Inspection | 9/8/2010 | 9/8/2010 | 9/8/2010 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
BLD-Final | 9/7/2010 | 9/8/2010 | 9/8/2010 | A | CANC |
Jim Sly
|
|
|
Please call 1/2 hour prior, thanks. Phone #: ###-#### >> Inspection requested via web by Darren Gossett Inspection cancelled from web by: Darren Gossett
|
BLD-Final | 9/1/2010 | 9/7/2010 | 9/7/2010 | A | CANC |
Jim Sly
|
|
|
Darren Phone #: ###-#### Inspection cancelled from web by: Darren Gossett
|
FIRE-Final Inspection | 9/1/2010 | 9/3/2010 | 9/3/2010 | A | CANC |
Troy Cobbley
|
|
|
Need the project related fire alarm permit signed off.
|
FIRE-Final Inspection | 7/29/2010 | 7/30/2010 | 7/30/2010 | A | FAIL |
Troy Cobbley
|
|
|
Todays inspection was for phase 13. Life safety passed in this area.
|
BLD-Framing/Rough-in | 7/21/2010 | 7/21/2010 | 7/21/2010 | P | PASS |
Mike Jordan
|
|
|
Darren Phone #: ###-####. Wod columns and beams for accordian doora, phase 13.
|
BLD-Framing/Rough-in | 7/12/2010 | 7/12/2010 | 7/12/2010 | P | PASS |
Jim Sly
|
|
|
Darren Phone #: ###-#### Wall cover phase 13........OK.
|
BLD-Framing/Rough-in | 7/6/2010 | 7/7/2010 | 7/7/2010 | A | PART |
Jim Sly
|
|
|
Darrin phone ###-#### Phase 11 OK
|
FIRE-Final Inspection | 7/6/2010 | 7/6/2010 | 7/7/2010 | P | PART |
Troy Cobbley
|
|
|
The existing fire alarm devices tested ok in Phase 11.
|
BLD-Final | 7/6/2010 | 7/6/2010 | 7/6/2010 | P | CANC |
Jim Sly
|
|
|
darren Phone #: ###-#### Re-sched......
|
FIRE-Final Inspection | 7/1/2010 | 7/2/2010 | 7/2/2010 | A | PART |
Troy Cobbley
|
|
|
The phase 11 life safety passed.
|
BLD-Framing/Rough-in | 6/30/2010 | 7/1/2010 | 7/1/2010 | A | PASS |
Jim Sly
|
|
|
darrin - ceiling/conference Phone #: ###-#### OK'd ceiling and minor Change of plan for addition of 1 door and moving another door to a new location approx 6' away. Conference rooms, Phase 13.
|
BLD-Framing/Rough-in | 6/21/2010 | 6/21/2010 | 6/21/2010 | P | PASS |
Jim Sly
|
|
|
Darren Phone #: ###-#### Select walls OK
|
BLD-Final | 6/11/2010 | 6/14/2010 | 6/14/2010 | A | PART |
Jim Sly
|
|
|
Chris-please call at least 30 mins prior to inspection for access Phone #: ###-#### Phase 10......OK for Temp Occ.
|
BLD-Final | 6/10/2010 | 6/11/2010 | 6/11/2010 | P | CANC |
Jim Sly
|
|
|
Please call 1/2 hour upon arrival, thanks. Inspection requested from web by: Darren Gossett Phone #: ###-#### Inspection cancelled from web by: Barbara Stitt
|
FIRE-Final Inspection | 6/10/2010 | 6/11/2010 | 6/11/2010 | A | PART |
Troy Cobbley
|
|
|
Phase 10 life safety passed.
|
BLD-Framing/Rough-in | 5/27/2010 | 5/27/2010 | 5/27/2010 | P | PART |
Jim Sly
|
|
|
Darren Phone #: ###-#### Phase 10 OK
|
BLD-Other | 5/25/2010 | 5/26/2010 | 5/26/2010 | A | PASS |
Jim Sly
|
|
|
Darren Phone #: ###-#### OK for Temp Occ.....Phase 9.
|
FIRE-Final Inspection | 5/18/2010 | 5/19/2010 | 5/19/2010 | A | PART |
Troy Cobbley
|
|
|
Phase 9 life safety passed. The two exit signs have been installed.
|
FIRE-Final Inspection | 5/18/2010 | 5/18/2010 | 5/18/2010 | P | FAIL |
Troy Cobbley
|
|
|
Todays inspection was for phase 9. Two exit signs need to be added as discussed. The missing exit sign in the short corridor at restroom 118 can remain missing. This work will be completed by morning per Darren. A follow up inspection has been scheduled.
|
BLD-Framing/Rough-in | 5/4/2010 | 5/4/2010 | 5/4/2010 | P | PART |
Jim Sly
|
|
|
darren Phone #: ###-#### Phase 9 OK
|
Plan assigned to (CJW) | 4/23/2010 | 4/23/2010 | 5/3/2010 | | PASS |
Carl Westfall
|
|
|
5/3/2010 14:24:43 CJW - activity updated through activity BLDA022 from case BLD09-00945.
|
Routing - PLAN CHECK | 4/23/2010 | | 5/3/2010 | | PASS |
|
|
|
Processed the 2nd Plan Modification.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/3/2010 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/3/2010 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/3/2010 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 5/3/2010 | | DONE |
|
|
|
|
(F) Reprint permit | | | 5/3/2010 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 4/23/2010 | | DONE |
|
|
|
plan modification accepted for BLD09-00945 the following revisions have been made Sheet A1.02,A1.03 many of the existing walls will remain in lieu of demo,Offices are located with in existing walls in lieu of new walls. A2.03 New walls separating spaces were removed.Offices are located with in existing walls in lieu of new walls.routed to Carl Westfall
|
FIRE-Conference | 4/21/2010 | 4/21/2010 | 4/21/2010 | P | DONE |
Troy Cobbley
|
|
|
Darren and I spoke about the requirements for the backflow preventor to be electrically supervised as per IFC 903.4.
|
BLD-Final | 3/26/2010 | 3/29/2010 | 3/29/2010 | P | CANC |
Jim Sly
|
|
|
chauntel hyde Phone #: ###-####
|
FIRE-Final Inspection | 3/26/2010 | 3/29/2010 | 3/29/2010 | A | CANC |
Troy Cobbley
|
|
|
chauntel hyde Phone #: ###-#### Wrong permit number and project set up for inspection.
|
BLD-Final | 3/26/2010 | 3/29/2010 | 3/29/2010 | A | PART |
Jim Sly
|
|
|
Darren Phone #: ###-#### Phase 8 OK for Temp.
|
BLD-Final | 3/26/2010 | 3/26/2010 | 3/26/2010 | P | PART |
Jim Sly
|
|
|
Darren Phone #: ###-#### Select area OK for Temp Occ.
|
FIRE-Final Inspection | 3/26/2010 | 3/26/2010 | 3/26/2010 | P | PART |
Troy Cobbley
|
|
|
Phase 8 life safety passed. The floor plans have been resubmitted and approved for plan modifications as requested. I discussed with Darren that the additional exit signs as marked by the plan reviewer in the phase 9 and 10 area corridors will be required prior to final.
|
Plan assigned to (CJW) | 3/25/2010 | 3/25/2010 | 3/26/2010 | | PASS |
Carl Westfall
|
|
|
3/26/2010 10:03:17 CJW - activity updated through activity BLDA022 from case BLD09-00945.
|
Routing - PLAN CHECK | 3/25/2010 | | 3/26/2010 | | PASS |
Carl Westfall
|
|
|
Approved the plan modification.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/26/2010 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/26/2010 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/26/2010 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 3/26/2010 | | DONE |
Tisha Gallop
|
|
|
plan mod paid for and picked up
|
Plan Modification Accepted | | | 3/25/2010 | | |
Tisha Gallop
|
|
|
Plan modification accepted for Bld10-00945 (Idaho Dept. of Health and Welfare-interior remodel-South Bldg) Item 1 Sht. A2.02: Reconfiguration within SR Process 212 (upper right hand). Some existing walls are to remain around gridline P-6 and Q-6. The existing IT and Data Rooms are to remain around gridline R-6. Item 2:The Training Room 239 became slightly larger, keeping some existing walls. Item 3: Wall between State Mail 226 and SR File Room 227 will not be built. Item 4: Some existing walls are to remain in Operations Manager Professionals 249. Item 5: The existing women's and men's restroom 209 and 210 do meet ADA requirements. Sht. A1.02: Demolition plan per the above comments. Sht.A8.01: Door Schedule is updated per the above comments. Submitted on sheets A1.02, A2.02, A8.01; routed to Carl Westfall.
|
Telephone call | | | 3/25/2010 | | DONE |
|
|
|
Called Margie Kennedy. Told her that the permit would be ready at 11:00 AM Friday (3-26-10). OK to schedule inspections for the Friday afternoon. Get the approved modified drawings on site for the inspections. OK to start moving in Friday.
|
FIRE-Final Inspection | 3/23/2010 | 3/24/2010 | 3/24/2010 | A | FAIL |
Troy Cobbley
|
|
|
Todays inspection was for life safety in phase 8. All of the exit signs and emergency lights functioned correctly, door hardware appeared adequate and fire extinguishers had been installed. The problem is there are substantial floor plan changes that do not match the city approved plans. I spoke to Jim Sly, Carl Westfall and Scott Arellano and it is agreed that resubmittals/plan modifications and the related inspection are required prior to occupancy of phase 8.
|
BLD-Other | 3/22/2010 | 3/22/2010 | 3/22/2010 | P | PASS |
Jim Sly
|
|
|
Please call 1/2 hour prior upon arrival, thanks. Inspection requested from web by: Darren Gossett Phone #: ###-#### Ceiling grid select area.
|
BLD-Framing/Rough-in | 2/26/2010 | 3/1/2010 | 3/1/2010 | A | PART |
Jim Sly
|
|
|
Please call 1/2 hour upon arrival, thanks. Inspection requested from web by: Darren Gossett Phone #: ###-#### Phase 8 OK
|
BLD-Final | 2/10/2010 | 2/10/2010 | 2/10/2010 | P | PART |
Jim Sly
|
|
|
Darren Phone #: ###-#### Temp Occ OK Phase 6 and 7 central.
|
FIRE-Final Inspection | 1/29/2010 | 2/1/2010 | 2/1/2010 | A | PART |
Troy Cobbley
|
|
|
The open office part of phase 6 life safety is passed and the storage area of phase 7 life safety is passed.
|
BLD-Framing/Rough-in | 1/25/2010 | 1/27/2010 | 1/27/2010 | A | PART |
Jim Sly
|
|
|
Darrin phone ###-#### Framing at North side of phase 6 .....OK
|
BLD-Framing/Rough-in | 1/25/2010 | 1/26/2010 | 1/25/2010 | A | CANC |
Jim Sly
|
|
|
Please call 1/2 hour upon arrival, thanks. Phone #: ###-#### Internet Inspection Request from: Darren Gossett Re- sched.....
|
BLD-Framing/Rough-in | 1/18/2010 | 1/19/2010 | 1/19/2010 | A | PART |
Jim Sly
|
|
|
Please call 1/2 hour upon arrival, thanks. Phone #: ###-#### Internet Inspection Request from: Darren Gossett OK to cover Phase 6 Lobby..........C/N....Architect of record to resubmit to Boise City PDS Dept. all changes from approved plan as follows: Leave wall dividing rooms 209 and 210 (restrooms) in leiu of Demo, Demo wall dividing rooms 226 and 227, and leaving section of hallway walls (238) located between hallway 225 and hallway 206.... as is.
|
FIRE-Final Inspection | 1/18/2010 | 1/19/2010 | 1/19/2010 | A | PART |
Troy Cobbley
|
|
|
The life safety inspection for the main lobby/waiting area remodel of Phase 6 is passed. HC Company will repair the exit sign over the main exit doors, provide an additional emergency light in the rear corridor and provide one additional fire extinguisher as discussed. These items will be verified when the remaining rooms in the lobby/waiting area are completed.
|
FIRE-Conference | 1/15/2010 | 1/15/2010 | 1/15/2010 | P | DONE |
Troy Cobbley
|
|
|
Per HC Company's request I spoke to Scott and he agreed that we would allow the remodeled/expanded main Lobby/Waiting area to be occupied Tuesday morning, 1/18/10, as long as the sprinklers, alarms (pending resubmittal) and life safety were complete. Darren with HC agreed and will be setting up an inspection for tuesday morning to verify items with Troy Cobbley.
|
FIRE-Conference | 1/11/2010 | 1/12/2010 | 1/12/2010 | A | DONE |
Troy Cobbley
|
|
|
I went over life safety requirements for the remodel in the existing main lobby area. I found that fire alarm modifications that were not previously shown on the project related fire alarm permit will need to be submitted to show the changes that are required due to the use change in this lobby area.
|
BLD-Framing/Rough-in | 1/11/2010 | 1/12/2010 | 1/12/2010 | A | PART |
Jim Sly
|
|
|
Darren ###-#### Select walls OK to cover ....phase 6
|
BLD-Framing/Rough-in | 1/11/2010 | 1/11/2010 | 1/11/2010 | P | CANC |
Jim Sly
|
|
|
Please call 1/2 hour prior, thanks. Phone #: ###-#### Internet Inspection Request from: Darren Gossett Re-sche.......
|
FIRE-Final Inspection | 12/29/2009 | 12/30/2009 | 12/30/2009 | A | PART |
Troy Cobbley
|
|
|
Phase 2 life safety is passed. The stand alone duct smoke detector passed inspection. The access controled egress lock has been disabled for now. I spoke to Darren about this door issue needing addressed prior to final sign off of the project.
|
BLD-Final | 12/21/2009 | 12/22/2009 | 12/22/2009 | A | PART |
Jim Sly
|
|
|
Darren Phone #: ###-#### Phase 5 OK for Temp.......
|
FIRE-Final Inspection | 12/21/2009 | 12/21/2009 | 12/21/2009 | P | PART |
Forrest France
|
|
|
Items at "phase 5" repaired while on site include EM lights, door hardware at two locations, one exit sign. Mag lock at the north exit disabled, notified contractor hardware must comply with IFC chapter 10 if functional.
|
BLD-Other | 12/9/2009 | 12/9/2009 | 12/9/2009 | A | PART |
Jim Sly
|
|
|
Please call 1/2 hour prior to arrival, thanks. Phone #: ###-#### Internet Inspection Request from: Darren Gossett OK for Temp Occ. phase 4
|
BLD-Framing/Rough-in | 12/8/2009 | 12/8/2009 | 12/8/2009 | A | PART |
Jim Sly
|
|
|
###-#### Darren Phased Insp.
|
FIRE-Final Inspection | 12/7/2009 | 12/8/2009 | 12/8/2009 | A | FAIL |
Troy Cobbley
|
|
|
This inspection was for phase 2. The insulation at the roof deck needs repaired. The existing "access controled egress" lock on the door to the lobby needs to meet the requirements of chapter 10 of the IFC. An existing duct smoke detector has been removed from a hvac unit and will need to be re-installed and tested. The existing fire alarm system will need to be tested for functionality as well. The ADA compliant door hardware has not been installed on both doors for the short corridor next to the electrical room as shown to be done on the city approved plans. I spoke to Chris with HC Company about the fire alarm/duct smoke detector and the "access controled egress door" via a phone conversation.
|
FIRE-Final Inspection | 12/3/2009 | 12/3/2009 | 12/3/2009 | P | PART |
Troy Cobbley
|
|
|
Phase 4 fire life safety is complete.
|
FIRE-Final Inspection | 12/2/2009 | 12/3/2009 | 12/3/2009 | A | FAIL |
Troy Cobbley
|
|
|
This inspection was for phase 4. The project related fire alarm permit needs passed for this area and the exit sign/emergency light re-oriented as per the city approved plans.
|
BLD-Wall cover | 11/3/2009 | 11/4/2009 | 11/4/2009 | A | PART |
Jim Sly
|
|
|
Please call 1/2 upon arrival, thanks. Phone #: ###-#### Internet Inspection Request from: Darren Gossett Framing OK phase 2 and phase 4
|
BLD-Final | 11/2/2009 | 11/2/2009 | 11/2/2009 | P | CANC |
Jim Sly
|
|
|
Chris phone
|
BLD-Final | 11/2/2009 | 11/2/2009 | 11/2/2009 | P | PART |
Jim Sly
|
|
|
Chris phone Phase 3 OK for Temp Occ as circled on appr plan.
|
FIRE-Final Inspection | 11/2/2009 | 11/2/2009 | 11/2/2009 | P | PART |
Forrest France
|
|
|
Fire life safety inspection completed okay for the phase 3 portion of remodel work, some corrections made while on site including removal of covers at existing smoke detectors, directional arrow at one exit sign, escutcheons at some sprinkler heads. Remodel work at adjacent areas in progress.
|
BLD-Final | 10/30/2009 | 11/2/2009 | 11/2/2009 | A | CANC |
Jim Sly
|
|
|
Re-sched.....
|
BLD-Final | 10/30/2009 | 11/2/2009 | 11/2/2009 | A | CANC |
Jim Sly
|
|
|
Re-sched.....
|
BLD-Final | 10/29/2009 | 10/30/2009 | 10/30/2009 | P | NR |
Jim Sly
|
|
|
chris Phone #: ###-####
|
BLD-Framing/Rough-in | 10/29/2009 | 10/30/2009 | 10/30/2009 | A | PART |
Jim Sly
|
|
|
chris Phone #: ###-#### Grid phase3 OK....Circled on plan.
|
BLD-Framing/Rough-in | 10/13/2009 | 10/13/2009 | 10/13/2009 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/13/2009 at 10:07:35 AM. Contact: ###-####. Wall located between Rms 134 and 169.....Braced via perpendicular walls as per new engineering. All framing OK in phase 1.
|
BLD-Framing/Rough-in | 10/8/2009 | 10/8/2009 | 10/8/2009 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/8/2009 at 7:06:25 AM. Contact: ###-####. OK to cover all but .........C/N on Wall located between Clerical room (134) and Child support room (169) ......Arch to provide detail for lat.brace top of wall.
|
FIRE-Conference | 10/1/2009 | 10/2/2009 | 10/2/2009 | A | DONE |
Troy Cobbley
|
|
|
Per conversation between Darren with HC Company, Mark Sentenno and myself areas of this project will be phased. The tenant will be able to occupy the remodeled areas as long as all fire alarm, fire sprinkler and fire life safety items are complete in the occupied remodeled areas. A final will be given when the entire project is complete.
|
Issue PAID IN FULL permit | | | 9/24/2009 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/14/2009 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/14/2009 | | DONE |
|
|
|
|
Telephone call | | | 8/14/2009 | | DONE |
|
|
|
Called lefe message for Margie Kennedy permit ready and fee given Also need GC AND RP
|
Plan assigned to (CJW) | 6/18/2009 | 6/23/2009 | 8/13/2009 | | PASS |
Carl Westfall
|
|
|
8/13/2009 16:38:54 CJW - activity updated through activity BLDA022 from case BLD09-00945.
|
Routing - PLAN CHECK | 7/10/2009 | | 8/13/2009 | | PASS |
Carl Westfall
|
|
|
Drawings approved after resubmittal review.
|
Routing - PUBLIC WORKS | 8/13/2009 | | 8/13/2009 | | DONE |
|
|
|
A toilet fixture retained and drinking fountains added.
|
Routing - PLAN CHECK | 8/13/2009 | | 8/13/2009 | | DONE |
Carl Westfall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/13/2009 | | DONE |
|
|
|
|
Plan resubmittals received | | | 8/4/2009 | | |
Tisha Gallop
|
|
|
received transmittal and two copies of sheet A0.05; taken to Carl Westfall
|
Plan resubmittals received | | | 7/31/2009 | | |
Carl Westfall
|
|
|
Rec'd Transmittal letter, structural calcs and two copies of sheets A0.01; A0.02; A1.01; A1.02; A1.03; A2.01; A2.02; A2.03; A2.04; A7.01; A7.02; A7.03; A8.01; A8.03; A8.04; M0.0; M1.2; M1.03; M2.2; M2.3; M3.0; ED1.02; ED1.03; E1.02; E1.03; E0.01; Taken to Carl W.
|
Routing - FIRE | 7/8/2009 | 7/8/2009 | 7/10/2009 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 7/10/2009 | | FAIL |
|
|
|
Failed Plan Check
|
Route to Impact Fee Review | 7/8/2009 | 7/13/2009 | 7/9/2009 | | PASS |
Cindy M. Gould
|
|
|
Tenent improvement no impact fees
|
Routing - PLAN CHECK | 6/26/2009 | | 7/8/2009 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on July 2, 2009 and was finished on July 8 (4 work days). Revised drawings were required. See the plan review report.
|
Routing - PLANNING Land Div | 6/26/2009 | | 6/26/2009 | | PASS |
Todd Tucker
|
|
|
|
Routing - PLAN CHECK | 6/23/2009 | | 6/26/2009 | | |
Carl Westfall
|
|
|
Sent to Land Division to verfy the combining of parcels.
|
Routing - Erosion and Sediment | 6/22/2009 | | 6/23/2009 | | PASS |
Steven Webb
|
|
|
ESC plan waiver approved with attached conditions. ESC09-00350
|
Routing - Design Review | 6/23/2009 | | 6/23/2009 | | PASS |
Sarah Schafer
|
|
|
Sarah Schafer - Exterior ramp
The slight incline of the sidewalk with a railing is approved without the requirement of a zoning certificate. The work will not have a negative impact on pedestrian traffic to the site, require the removal of any landscape or any major changes tot he elevation.
|
Routing - PUBLIC WORKS | 6/18/2009 | | 6/22/2009 | | PASS |
Beverly Hall
|
|
|
|
Routing - Addressing | 6/19/2009 | | 6/19/2009 | | PASS |
April Wing
|
|
|
|
Pending Assignment by JCB | 6/18/2009 | | 6/18/2009 | | DONE |
Jason Blais
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/17/2009 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/17/2009 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | 6/17/2009 | | | |
|
|
|
|