Permit Information
Permit NumberBLD09-00965
StatusFinaled
Name SAGE CONSTRUCTION
Site Address 11405 W FAIRVIEW AVE
Project NameEckhardt Company Inc
Customer Number 
ePlanReviewNo
Description
Eckhardt Company - Pawn One - To construct a new 8,510 square foot, two story retail and storage building. This building is constructed of masonry exterior walls and wood framed second floor and roof construction. This building was reviewed as nonseparated uses. This permit also includes related site improvements. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  5/22/2015 DONE
Second Notice 1/8/20101/5/2010 DONE
First Notice 12/3/200912/29/2009 DONE
BLD-Final11/24/200911/24/200911/24/2009PPASS
DetailsMike Jordan
Jarod Phone #: ###-####. Fixtures ok. ok for perm occ.
Permanent Occupancy  11/24/2009 DONE
Details
BLD-Final11/16/200911/16/200911/16/2009PPART
DetailsMike Jordan
Jared Phone #: ###-####. Ok for temp occ. Still need to check fixtures for ada compliance.
BLD-Final11/12/200911/13/200911/16/2009PNR
DetailsMike Jordan
Jarod Phone #: ###-####
Temporary Occupancy11/16/20092/14/201011/16/2009 DONE
DetailsTisha Gallop
Zoning Approval11/16/200911/16/200911/16/2009 PASS
DetailsJosh Wilson
PubWorks Occupancy Approval11/13/200911/13/200911/13/2009 DONE
DetailsTiffany Lowery
FIRE-Final Inspection11/12/200911/12/200911/12/2009PPASS
DetailsTroy Cobbley
Life safety passed.
BLD-Framing/Rough-in10/30/200911/2/200911/2/2009APASS
DetailsTom Arcoraci
jared - ceiling grid Phone #: ###-####
BLD-Framing/Rough-in10/29/200910/30/200910/30/2009APART
DetailsMike Jordan
jared - ceiling grid Phone #: 412-288. Needs to install wires for diffusers.
BLD-Other10/26/200910/27/200910/27/2009ANR
DetailsMike Jordan
ceiling grid insp//Jared Phone #: ###-####. Needs elec. ri insp. first.
BLD-Framing/Rough-in10/8/200910/9/200910/9/2009APART
DetailsMike Jordan
Jared-dry wall inspection please Phone #: ###-####. 5/8 type x rock for vertical exit enclosure.
FIRE-Conference10/7/200910/8/200910/8/2009ADONE
DetailsTroy Cobbley
Went over life safety requirements with contractor. Requiring emergency lights and exit signs in mezzanine.
BLD-Energy code compliance10/8/200910/8/200910/8/2009PPASS
DetailsMike Jordan
BLD-Framing/Rough-in10/6/200910/6/200910/6/2009PPASS
DetailsMike Jordan
Jared Phone #: ###-####. Interior framed walls under mezz, mezz framing and roof framing ok.
BLD-Framing/Rough-in9/29/20099/29/20099/29/2009PPART
DetailsMike Jordan
jared Phone #: ###-####. ok to insulate ceiling. Verified all straps and blocking for roof.
BLD-Framing/Rough-in9/23/20099/24/20099/24/2009APART
DetailsMike Jordan
jared Phone #: ###-####. 4" nailing on blocking for roof diaphragm completed. Also visually inspected nailing on interior shearwall ok.
BLD-Framing/Rough-in9/21/20099/22/20099/22/2009PPART
DetailsMike Jordan
Jared Phone #: ###-####. Nailing for roof diaphragm only. Still needs to nail at 4"oc at blocking.
BLD-Concrete9/11/20099/14/20099/15/2009PDONE
DetailsMike Jordan
masonary wall insp. Phone #: ###-####
BLD-Other9/10/20099/11/20099/11/2009PPART
DetailsMike Jordan
Jared-Masonry inspection please Phone #: ###-####
BLD-Other9/9/20099/10/20099/10/2009APART
DetailsMike Jordan
jared - masonary wall Phone #: ###-####. wip on masonry wall construction, southwall tow, 17ft. 4in. elev. on remaining walls. special inspector was on site. Also reviewed all special insp. reports to date. No deficiencies were noted.
BLD-Other9/4/20099/8/20099/8/2009PDONE
DetailsMike Jordan
Jared- wall Phone #: ###-####. Masonry grout placement already completed when on site. Did have special insp.
BLD-Concrete9/2/20099/3/20099/3/2009PPART
DetailsMike Jordan
Jared Phone #: ###-####. Masonry walls from 4ft. to 8ft. elev. work in progress. Perimeter walls. oft. to 4ft. ele. for interio masonry walls.
Case Summary (BLD)  9/2/2009 DONE
BLD-Other8/31/20099/1/20099/1/2009PPART
DetailsMike Jordan
Masonary wall inspection please-Jared Phone #: ###-####. Perimeter wall, 0 to4ft. elev. wip. Will have special inspection.
BLD-Concrete8/27/20098/27/20098/27/2009PPASS
DetailsMike Jordan
slab inspection ready this morning if possible. Phone #: ###-####. Interior footings.
BLD-Footing8/21/20098/24/20098/24/2009APART
DetailsMike Jordan
Jared Phone #: ###-####. wip on interior column pad footings. Will have special insp.
BLD-Foundation8/14/20098/17/20098/17/2009PPASS
DetailsMike Jordan
jared Phone #: ###-####
BLD-Footing8/11/20098/12/20098/12/2009PPART
DetailsMike Jordan
jared Phone #: ###-####. Perimeter footings. Noted special inspection.
BLD-Conference8/4/20098/5/20098/5/2009PDONE
DetailsMike Jordan
Jarod Phone #: ###-####. Went over special inspection requirements with contractor as per special inspection start up sheet on approved plans.
Issue PAID IN FULL permit  7/29/2009 DONE
Plan resubmittals received  7/29/2009 DONE
received letter of transmittal and 2 copies of sheets C1.0,C3.0,C4.0,C4.1,C5.1 Oscar brought these sets to insrt into the plans but they had been issued. so I kept the office copy set to be put with it and Oscar took one set to the contractor of the job.
Print Occupancy Form  7/22/2009 DONE
Permit Ready to Issue  7/22/2009 DONE
Telephone call  7/22/2009 DONE
DetailsBarbara Stitt
Spoke with Oscar @ LRK Architect's and told him permit is ready, fees due and need ACHD information is required before we can issue permit///7-22-09 @ 9:06am BAS
Plan assigned to (JCM)6/19/2009 7/21/2009 PASS
DetailsJohn Menard
7/21/2009 16:16:29 JCM - activity updated through activity BLDA022 from case BLD09-00965.
Routing - PLUMBING7/20/2009 7/21/2009 PASS
DetailsBill VanDegrift
per plans and 2003 upc
Routing - PLAN CHECK7/21/2009 7/21/2009 PASS
DetailsJohn Menard
Plan Reviewer's activity  7/21/2009 PASS
DetailsJohn Menard
Reviewed and approved structural and nonstructural plan revisions with red lined notes and attached clarification notes. JCM
PLANS/APPL TAKEN TO FRONT DESK  7/21/2009 DONE
DetailsJohn Menard
Routing - PUBLIC WORKS7/9/2009 7/20/2009 PASS
DetailsBeverly Hall
Routing PW Street Lights7/20/2009 7/20/2009 PASS
DetailsHank Alarcon
Plan resubmittals received  7/15/2009  
Received 1 cover response letter from Oscar Saavedra to John Menard dated 7-15-09, 1 response letter from TRU Engineering dated 7-13-09, 3 copies of revised review comments, 3 copies of sheets C1.0, C3.0, C5.1, A0, A2.0, A3.0, A4.0, A5.0, A5.1, A6.0, A7.0, S2.0, S2.1, S2.2, S2.3, E2.0, E4.0 and inserted into plans
Plan resubmittals received  7/15/2009  
Received 1 cover transmittal, 3 copies of sheets C1.0, C3.0, C5.1 for Brian Murphy and inserted into plans
Plan resubmittals received  7/14/2009 DONE
received 1 letter of transmittal and 3 copies of sheets C1.0,C3.0,C4.0,& C4.1 These re submittals were the 3 extra sets that Brian M had asked for,they did not need to be inserted. I have given the re submittals to Brian Murphy
Routing PW Drainage7/10/2009 7/13/2009 PASS
DetailsBrian Murphy
Routing - PLAN CHECK7/8/2009 7/9/2009  
DetailsJohn Menard
Route to Impact Fee Review7/7/20097/10/20097/8/2009 PASS
DetailsCindy M. Gould
Routing - FIRE7/7/20097/7/20097/8/2009 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  7/8/2009 FAIL
Failed Public Works, Structural, Plumbing
Plan resubmittals received  7/8/2009 DONE
received 1 letter to Bill Vandegrift & 1 letter to Hank Alarcon (Public Works) and 3 copies of sheets C1.0,C3.0,C4.0,C4.1,P-1,P-Z,E1.0,E4.0 inservet by Oscer from LRK Architects
Plan resubmittals requested  7/7/2009 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural review requesting revisions. JCM
Plan resubmittals requested  7/7/2009 DONE
DetailsJohn Menard
E-mailed the architect a copy of the plan review requesting revisions. JCM
Routing - PLAN CHECK6/29/2009 7/7/2009 FAIL
DetailsJohn Menard
John Menard
Routing Off Site - STRUCTURAL6/19/2009 7/6/2009 FAIL
DetailsJohn Menard
Received comment list from consulting structural engineer requesting revisions. JCM
Routing - PLANNING6/26/2009 6/29/2009 PASS
DetailsJosh Wilson
DRH09-00050 Josh Wilson
Routing - PLUMBING6/25/2009 6/26/2009 FAIL
DetailsBill VanDegrift
water service on plumbing plans and civil plans don't match
Routing - Erosion and Sediment6/25/2009 6/25/2009 PASS
DetailsSteven Webb
ESC plan approved with attached conditions. ESC09-00357
Routing PW Solid Waste  6/25/2009 PASS
DetailsPeter J. McCullough
Routing PW Street Lights6/23/2009 6/24/2009 FAIL
Called & Faxed Larry Knopp office on 06/24/2009 and advised them that street lighting plan to I.E.S. standard will need to be submitted for approval.
Routing PW Sewer Design6/24/2009 6/24/2009 PASS
DetailsJon R. Gunnerson
Connect onto existing sanitary sewer service provided
Routing PW Sewer Rating6/24/2009 6/24/2009 PASS
DetailsConnie Baumgartner
Routing PW Drainage6/23/2009 6/23/2009 FAIL
DetailsBrian Murphy
NEED INFO ON HOW STORMWATER FROM PHASE 2 SLAB GETS TO SEEPAGE BED. BRIAN MURPHY ###-####
Routing - Addressing6/22/2009 6/22/2009 PASS
DetailsApril Wing
Application received 6/18/20096/19/2009 DONE
DetailsTisha Gallop
Pending Assignment by JCM6/19/2009 6/19/2009 BLDA
DetailsJohn Menard
6/19/2009 08:41:41 JCM - activity updated through activity BLDA166 from case BLD09-00965.
Plan routing begun/NEW & ADDTN  6/19/2009 DONE
DetailsTisha Gallop
Telephone call  6/19/2009 DONE
DetailsTisha Gallop
called Action Couriers for pick up
Routing - PLANNING Land Div6/19/2009 6/19/2009 PASS
DetailsDave Abo
Two platted lots combined into one parcel by Ada County Tax Assessor.
Plans ACCEPTED BY PLAN TECH  6/18/2009 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  6/18/2009 DONE
DetailsTisha Gallop
Routing - PUBLIC WORKS6/19/2009   FAIL
DetailsBeverly Hall
Drainage and Street Lights failed