Case Summary (BLD) | | | 5/22/2015 | | DONE |
|
|
|
|
Second Notice | | 1/8/2010 | 1/5/2010 | | DONE |
|
|
|
|
First Notice | | 12/3/2009 | 12/29/2009 | | DONE |
|
|
|
|
BLD-Final | 11/24/2009 | 11/24/2009 | 11/24/2009 | P | PASS |
Mike Jordan
|
|
|
Jarod Phone #: ###-####. Fixtures ok. ok for perm occ.
|
Permanent Occupancy | | | 11/24/2009 | | DONE |
|
|
|
|
BLD-Final | 11/16/2009 | 11/16/2009 | 11/16/2009 | P | PART |
Mike Jordan
|
|
|
Jared Phone #: ###-####. Ok for temp occ. Still need to check fixtures for ada compliance.
|
BLD-Final | 11/12/2009 | 11/13/2009 | 11/16/2009 | P | NR |
Mike Jordan
|
|
|
Jarod Phone #: ###-####
|
Temporary Occupancy | 11/16/2009 | 2/14/2010 | 11/16/2009 | | DONE |
Tisha Gallop
|
|
|
|
Zoning Approval | 11/16/2009 | 11/16/2009 | 11/16/2009 | | PASS |
Josh Wilson
|
|
|
|
PubWorks Occupancy Approval | 11/13/2009 | 11/13/2009 | 11/13/2009 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Final Inspection | 11/12/2009 | 11/12/2009 | 11/12/2009 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
BLD-Framing/Rough-in | 10/30/2009 | 11/2/2009 | 11/2/2009 | A | PASS |
Tom Arcoraci
|
|
|
jared - ceiling grid Phone #: ###-####
|
BLD-Framing/Rough-in | 10/29/2009 | 10/30/2009 | 10/30/2009 | A | PART |
Mike Jordan
|
|
|
jared - ceiling grid Phone #: 412-288. Needs to install wires for diffusers.
|
BLD-Other | 10/26/2009 | 10/27/2009 | 10/27/2009 | A | NR |
Mike Jordan
|
|
|
ceiling grid insp//Jared Phone #: ###-####. Needs elec. ri insp. first.
|
BLD-Framing/Rough-in | 10/8/2009 | 10/9/2009 | 10/9/2009 | A | PART |
Mike Jordan
|
|
|
Jared-dry wall inspection please Phone #: ###-####. 5/8 type x rock for vertical exit enclosure.
|
FIRE-Conference | 10/7/2009 | 10/8/2009 | 10/8/2009 | A | DONE |
Troy Cobbley
|
|
|
Went over life safety requirements with contractor. Requiring emergency lights and exit signs in mezzanine.
|
BLD-Energy code compliance | 10/8/2009 | 10/8/2009 | 10/8/2009 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 10/6/2009 | 10/6/2009 | 10/6/2009 | P | PASS |
Mike Jordan
|
|
|
Jared Phone #: ###-####. Interior framed walls under mezz, mezz framing and roof framing ok.
|
BLD-Framing/Rough-in | 9/29/2009 | 9/29/2009 | 9/29/2009 | P | PART |
Mike Jordan
|
|
|
jared Phone #: ###-####. ok to insulate ceiling. Verified all straps and blocking for roof.
|
BLD-Framing/Rough-in | 9/23/2009 | 9/24/2009 | 9/24/2009 | A | PART |
Mike Jordan
|
|
|
jared Phone #: ###-####. 4" nailing on blocking for roof diaphragm completed. Also visually inspected nailing on interior shearwall ok.
|
BLD-Framing/Rough-in | 9/21/2009 | 9/22/2009 | 9/22/2009 | P | PART |
Mike Jordan
|
|
|
Jared Phone #: ###-####. Nailing for roof diaphragm only. Still needs to nail at 4"oc at blocking.
|
BLD-Concrete | 9/11/2009 | 9/14/2009 | 9/15/2009 | P | DONE |
Mike Jordan
|
|
|
masonary wall insp. Phone #: ###-####
|
BLD-Other | 9/10/2009 | 9/11/2009 | 9/11/2009 | P | PART |
Mike Jordan
|
|
|
Jared-Masonry inspection please Phone #: ###-####
|
BLD-Other | 9/9/2009 | 9/10/2009 | 9/10/2009 | A | PART |
Mike Jordan
|
|
|
jared - masonary wall Phone #: ###-####. wip on masonry wall construction, southwall tow, 17ft. 4in. elev. on remaining walls. special inspector was on site. Also reviewed all special insp. reports to date. No deficiencies were noted.
|
BLD-Other | 9/4/2009 | 9/8/2009 | 9/8/2009 | P | DONE |
Mike Jordan
|
|
|
Jared- wall Phone #: ###-####. Masonry grout placement already completed when on site. Did have special insp.
|
BLD-Concrete | 9/2/2009 | 9/3/2009 | 9/3/2009 | P | PART |
Mike Jordan
|
|
|
Jared Phone #: ###-####. Masonry walls from 4ft. to 8ft. elev. work in progress. Perimeter walls. oft. to 4ft. ele. for interio masonry walls.
|
Case Summary (BLD) | | | 9/2/2009 | | DONE |
|
|
|
|
BLD-Other | 8/31/2009 | 9/1/2009 | 9/1/2009 | P | PART |
Mike Jordan
|
|
|
Masonary wall inspection please-Jared Phone #: ###-####. Perimeter wall, 0 to4ft. elev. wip. Will have special inspection.
|
BLD-Concrete | 8/27/2009 | 8/27/2009 | 8/27/2009 | P | PASS |
Mike Jordan
|
|
|
slab inspection ready this morning if possible. Phone #: ###-####. Interior footings.
|
BLD-Footing | 8/21/2009 | 8/24/2009 | 8/24/2009 | A | PART |
Mike Jordan
|
|
|
Jared Phone #: ###-####. wip on interior column pad footings. Will have special insp.
|
BLD-Foundation | 8/14/2009 | 8/17/2009 | 8/17/2009 | P | PASS |
Mike Jordan
|
|
|
jared Phone #: ###-####
|
BLD-Footing | 8/11/2009 | 8/12/2009 | 8/12/2009 | P | PART |
Mike Jordan
|
|
|
jared Phone #: ###-####. Perimeter footings. Noted special inspection.
|
BLD-Conference | 8/4/2009 | 8/5/2009 | 8/5/2009 | P | DONE |
Mike Jordan
|
|
|
Jarod Phone #: ###-####. Went over special inspection requirements with contractor as per special inspection start up sheet on approved plans.
|
Issue PAID IN FULL permit | | | 7/29/2009 | | DONE |
|
|
|
|
Plan resubmittals received | | | 7/29/2009 | | DONE |
|
|
|
received letter of transmittal and 2 copies of sheets C1.0,C3.0,C4.0,C4.1,C5.1 Oscar brought these sets to insrt into the plans but they had been issued. so I kept the office copy set to be put with it and Oscar took one set to the contractor of the job.
|
Print Occupancy Form | | | 7/22/2009 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/22/2009 | | DONE |
|
|
|
|
Telephone call | | | 7/22/2009 | | DONE |
Barbara Stitt
|
|
|
Spoke with Oscar @ LRK Architect's and told him permit is ready, fees due and need ACHD information is required before we can issue permit///7-22-09 @ 9:06am BAS
|
Plan assigned to (JCM) | 6/19/2009 | | 7/21/2009 | | PASS |
John Menard
|
|
|
7/21/2009 16:16:29 JCM - activity updated through activity BLDA022 from case BLD09-00965.
|
Routing - PLUMBING | 7/20/2009 | | 7/21/2009 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Routing - PLAN CHECK | 7/21/2009 | | 7/21/2009 | | PASS |
John Menard
|
|
|
|
Plan Reviewer's activity | | | 7/21/2009 | | PASS |
John Menard
|
|
|
Reviewed and approved structural and nonstructural plan revisions with red lined notes and attached clarification notes. JCM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/21/2009 | | DONE |
John Menard
|
|
|
|
Routing - PUBLIC WORKS | 7/9/2009 | | 7/20/2009 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Street Lights | 7/20/2009 | | 7/20/2009 | | PASS |
Hank Alarcon
|
|
|
|
Plan resubmittals received | | | 7/15/2009 | | |
|
|
|
Received 1 cover response letter from Oscar Saavedra to John Menard dated 7-15-09, 1 response letter from TRU Engineering dated 7-13-09, 3 copies of revised review comments, 3 copies of sheets C1.0, C3.0, C5.1, A0, A2.0, A3.0, A4.0, A5.0, A5.1, A6.0, A7.0, S2.0, S2.1, S2.2, S2.3, E2.0, E4.0 and inserted into plans
|
Plan resubmittals received | | | 7/15/2009 | | |
|
|
|
Received 1 cover transmittal, 3 copies of sheets C1.0, C3.0, C5.1 for Brian Murphy and inserted into plans
|
Plan resubmittals received | | | 7/14/2009 | | DONE |
|
|
|
received 1 letter of transmittal and 3 copies of sheets C1.0,C3.0,C4.0,& C4.1 These re submittals were the 3 extra sets that Brian M had asked for,they did not need to be inserted. I have given the re submittals to Brian Murphy
|
Routing PW Drainage | 7/10/2009 | | 7/13/2009 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLAN CHECK | 7/8/2009 | | 7/9/2009 | | |
John Menard
|
|
|
|
Route to Impact Fee Review | 7/7/2009 | 7/10/2009 | 7/8/2009 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - FIRE | 7/7/2009 | 7/7/2009 | 7/8/2009 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 7/8/2009 | | FAIL |
|
|
|
Failed Public Works, Structural, Plumbing
|
Plan resubmittals received | | | 7/8/2009 | | DONE |
|
|
|
received 1 letter to Bill Vandegrift & 1 letter to Hank Alarcon (Public Works) and 3 copies of sheets C1.0,C3.0,C4.0,C4.1,P-1,P-Z,E1.0,E4.0 inservet by Oscer from LRK Architects
|
Plan resubmittals requested | | | 7/7/2009 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the structural review requesting revisions. JCM
|
Plan resubmittals requested | | | 7/7/2009 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
Routing - PLAN CHECK | 6/29/2009 | | 7/7/2009 | | FAIL |
John Menard
|
|
|
John Menard
|
Routing Off Site - STRUCTURAL | 6/19/2009 | | 7/6/2009 | | FAIL |
John Menard
|
|
|
Received comment list from consulting structural engineer requesting revisions. JCM
|
Routing - PLANNING | 6/26/2009 | | 6/29/2009 | | PASS |
Josh Wilson
|
|
|
DRH09-00050 Josh Wilson
|
Routing - PLUMBING | 6/25/2009 | | 6/26/2009 | | FAIL |
Bill VanDegrift
|
|
|
water service on plumbing plans and civil plans don't match
|
Routing - Erosion and Sediment | 6/25/2009 | | 6/25/2009 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions. ESC09-00357
|
Routing PW Solid Waste | | | 6/25/2009 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Street Lights | 6/23/2009 | | 6/24/2009 | | FAIL |
|
|
|
Called & Faxed Larry Knopp office on 06/24/2009 and advised them that street lighting plan to I.E.S. standard will need to be submitted for approval.
|
Routing PW Sewer Design | 6/24/2009 | | 6/24/2009 | | PASS |
Jon R. Gunnerson
|
|
|
Connect onto existing sanitary sewer service provided
|
Routing PW Sewer Rating | 6/24/2009 | | 6/24/2009 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Drainage | 6/23/2009 | | 6/23/2009 | | FAIL |
Brian Murphy
|
|
|
NEED INFO ON HOW STORMWATER FROM PHASE 2 SLAB GETS TO SEEPAGE BED. BRIAN MURPHY ###-####
|
Routing - Addressing | 6/22/2009 | | 6/22/2009 | | PASS |
April Wing
|
|
|
|
Application received | | 6/18/2009 | 6/19/2009 | | DONE |
Tisha Gallop
|
|
|
|
Pending Assignment by JCM | 6/19/2009 | | 6/19/2009 | | BLDA |
John Menard
|
|
|
6/19/2009 08:41:41 JCM - activity updated through activity BLDA166 from case BLD09-00965.
|
Plan routing begun/NEW & ADDTN | | | 6/19/2009 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 6/19/2009 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for pick up
|
Routing - PLANNING Land Div | 6/19/2009 | | 6/19/2009 | | PASS |
Dave Abo
|
|
|
Two platted lots combined into one parcel by Ada County Tax Assessor.
|
Plans ACCEPTED BY PLAN TECH | | | 6/18/2009 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/18/2009 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PUBLIC WORKS | 6/19/2009 | | | | FAIL |
Beverly Hall
|
|
|
Drainage and Street Lights failed
|