Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD09-00969
StatusFinaled
Name BRUCE COOPER CONST INC
Site Address 3580 N CLOVERDALE RD
Project NameCloverdale United Reformed Chu
Customer Number 
ePlanReviewNo
Description
Cloverdale United Reformed Church - Classroom Addition - To construct a 1,845 square foot, one story, wood framed classroom addition on the northwest corner of an existing church building. The addition will contain five new classrooms and an egress corridor. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 4/4/20103/29/2010 DONE
First Notice 3/19/20103/25/2010 DONE
Permanent Occupancy  3/9/2010 DONE
BLD-Final2/24/20102/25/20102/25/2010APASS
DetailsJim Sly
Bruce Phone #: ###-####
OK for Perm Occ. Called Public works....No inspection required.
Zoning Approval2/23/20102/23/20102/23/2010 DONE
DetailsSusan Riggs
BLD-Final2/9/20102/9/20102/9/2010PNR
DetailsMike Jordan
Chris Phone #: ###-####. Needs zoning final. Landscapping not yet completed.
FIRE-Final Inspection2/9/20102/9/20102/9/2010PPASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection2/8/20102/8/20102/8/2010PFAIL
DetailsTroy Cobbley
Provide the latest approved plans showing the door addition and repair the exit sign over the west facing exit doors.
CHANGE STATUS TO (ISS)  1/21/2010 DONE
(F) Reprint permit  1/21/2010 DONE
Routing - PLAN CHECK1/19/2010 1/20/2010 PASS
DetailsJohn Menard
Plan assigned to (JCM)1/20/2010 1/20/2010 PASS
DetailsJohn Menard
1/20/2010 15:31:42 JCM - activity updated through activity BLDA022 from case BLD09-00969.
Routing - FIRE1/20/2010 1/20/2010 PASS
DetailsScott Arellano
No separate plan review comments attached
Routing - PLAN CHECK1/20/2010 1/20/2010 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  1/20/2010 DONE
DetailsJohn Menard
Case Summary (BLD)  1/20/2010 DONE
DetailsTisha Gallop
Override - Parcel Holds  1/20/2010  
Permit Ready to Issue  1/20/2010 DONE
DetailsTisha Gallop
plan mod ready
Telephone call  1/20/2010  
called Justin and told him plan mod is ready and fees
Plan Modification Accepted  1/19/2010  
DetailsJohn Menard
rec'd plan mod to add 5'x8' rated wall with rated door and closure and hallway to satisfy Fire Marshall fire alarm requirements for upgrades to existing building. add hallway alarms in existing classroom hallways - 2 copies of sheet FA.00, FA.20 - taken to john menard
Case Summary (BLD)  12/29/2009 DONE
BLD-Energy code compliance10/15/200910/16/200910/16/2009PPASS
DetailsMike Jordan
Bruce Phone #: ###-####
BLD-Framing/Rough-in10/16/200910/16/200910/16/2009PPASS
DetailsMike Jordan
Bruce Phone #: ###-####. Mstc straps installed. Also recieved enginering for TJI used for roof joist.
BLD-Framing/Rough-in10/14/200910/15/200910/15/2009APART
DetailsMike Jordan
bruce Phone #: ###-####. Needs to install mststraps as shown on plan. Also provide engineering showing tji installed will be ok for the roof loads applied.
BLD-Framing/Rough-in9/16/20099/16/20099/17/2009PPART
DetailsJim Sly
Bruce-shear nail inspection please Phone #: ###-####
Ext shear nailing OK
BLD-Footing8/17/20098/18/20098/18/2009PPASS
DetailsJim Sly
bruce - late afternoon please Phone #: ###-####
Wall OK
BLD-Footing8/14/20098/14/20098/14/2009PPASS
DetailsJim Sly
bruce - late afternoon please Phone #: ###-####
No special insp required. OK
Issue PAID IN FULL permit  8/7/2009 DONE
Print Occupancy Form  8/4/2009 DONE
Details
Telephone call  8/4/2009 DONE
Details
t/c w justin wall at ###-#### - permit ready and fees given - also need ACHD receipt and rp name
Permit Ready to Issue  8/4/2009 DONE
Details
Routing - PLAN CHECK7/23/2009 8/3/2009 PASS
DetailsJohn Menard
Plan assigned to (JCM)6/19/2009 8/3/2009 PASS
DetailsJohn Menard
8/3/2009 15:34:43 JCM - activity updated through activity BLDA022 from case BLD09-00969.
Plan Reviewer's activity  8/3/2009 PASS
DetailsJohn Menard
Reviewed and approved structural and nonstructural revisions. JCM
Routing - Erosion and Sediment8/3/2009 8/3/2009 PASS
DetailsSteven Webb
ESC plan approved with attached conditions. ESC09-00360
Routing - PLAN CHECK8/3/2009 8/3/2009 PASS
DetailsJohn Menard
John M.
Case Summary (BLD)  8/3/2009  
PLANS/APPL TAKEN TO FRONT DESK  8/3/2009 DONE
DetailsJohn Menard
Plan resubmittals received  7/24/2009  
DetailsJohn Menard
Rec'd response letter for John Menard and Brian Murphy; three copies of sheets A-0.1; A-3.1; A-4.1, and two copies of ESC narrative- inserted by arch rep; taken back to John M
Routing - PUBLIC WORKS7/20/2009 7/23/2009 PASS
DetailsBeverly Hall
Routing PW Drainage7/20/2009 7/23/2009 PASS
DetailsBrian Murphy
Routing - Erosion and Sediment7/23/2009 7/23/2009 FAIL
DetailsSteven Webb
ESC09-00360 fail due to the lack of resubmittals of required items per the last review on 6/25/09.
Routing - PLAN CHECK7/17/2009 7/20/2009  
DetailsJohn Menard
Plan resubmittals requested  7/20/2009 DONE
DetailsJohn Menard
E-mailed the arcitect a copy of structural comments requesting additional revisions. JCM
Routing Off Site - STRUCTURAL7/13/2009 7/20/2009 FAIL
DetailsJohn Menard
Called Action Courier for pick up 7-13-09 @ 9:00 am BAS - Received comment from consulting structural engineer requesting additional revisions. JCM
Routing - FIRE7/13/20097/13/20097/17/2009 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  7/17/2009 FAIL
Failed Erosion & Soil Control, Structural
Plan resubmittals received  7/15/2009  
DetailsTisha Gallop
Received reponse letter addressed to Brian Murphy from architect, response letter to John Menard from architect, plumbing details on 11" x 17" (3 pgs), Hallmark Certificate of Conformance and License for Velux America Inc., NES report for Velux curb mount fixed skylights; rolled up with plans by LEG and taken back to Fire review
Route to Impact Fee Review7/13/20097/16/20097/14/2009 PASS
DetailsCindy M. Gould
Plan resubmittals requested  7/13/2009 DONE
DetailsJohn Menard
E-mailed the architec a copy of the plan review requesting revisions. JCM
Routing - PLAN CHECK6/26/2009 7/13/2009 FAIL
DetailsJohn Menard
Plan resubmittals received  7/10/2009  
DetailsTisha Gallop
Received response from engineer and three copies of revised structural calculations and plan sheets A-0.1, A-3.1, A-4.1; inserted by arch. rep. and taken back to John Menard
Plan resubmittals requested  6/29/2009 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural review requesting revisions. JCM
Routing Off Site - STRUCTURAL6/22/2009 6/26/2009 FAIL
DetailsJohn Menard
Received comment list from consulting structural engineer requesting revisions. JCM
Routing - PLAN CHECK6/22/2009 6/26/2009  
DetailsJohn Menard
Routing - PLANNING6/25/2009 6/26/2009 PASS
DetailsSusan Riggs
CUP09-00044- Susan Riggs
Routing - PLUMBING6/25/2009 6/25/2009 PASS
DetailsBill VanDegrift
no plumbing
Routing - PUBLIC WORKS6/22/2009 6/25/2009 FAIL
DetailsBeverly Hall
Failed Drainage
Routing - Erosion and Sediment6/25/2009 6/25/2009 FAIL
DetailsSteven Webb
ESC plan does not meet requirements of BMC 8-17. ESC plan was provide but no narrative. ESC09-00360
Routing PW Solid Waste  6/25/2009 PASS
DetailsPeter J. McCullough
Routing PW Drainage6/23/2009 6/24/2009 FAIL
DetailsBrian Murphy
NEEDS PLAN REVISION ON DESIGN STORM CACL. BRIAN MURPHY ###-####
Routing PW Sewer Rating6/24/2009 6/24/2009 PASS
DetailsConnie Baumgartner
Routing PW Street Lights6/24/2009 6/24/2009 PASS
DetailsHank Alarcon
Routing - Addressing6/23/2009 6/23/2009 PASS
DetailsApril Wing
Routing - PLANNING Land Div6/22/2009 6/22/2009 PASS
DetailsTodd Tucker
Plan routing begun/NEW & ADDTN  6/22/2009  
DetailsAlexandra L. DeYoung
Plans ACCEPTED BY PLAN TECH  6/22/2009 DONE
DetailsAlexandra L. DeYoung
Telephone call  6/22/2009 DONE
DetailsAlexandra L. DeYoung
Called Action to pick up a deliver to AHJ @ 8:20
Plans ACCEPTED BY PLAN TECH  6/19/2009 DONE
DetailsAlexandra L. DeYoung
Pending Assignment by JCM6/19/2009 6/19/2009 BLDA
DetailsJohn Menard
6/19/2009 15:47:43 JCM - activity updated through activity BLDA166 from case BLD09-00969.
Application received 6/19/2009