Permanent Occupancy UNPAID FEE | | | 11/23/2009 | | DONE |
|
|
|
|
BLD-Final | 11/19/2009 | 11/20/2009 | 11/20/2009 | P | PASS |
Tony Young
|
|
|
graig Phone #: ###-#### ok for perm occ
|
FIRE-Final Inspection | 11/20/2009 | 11/20/2009 | 11/20/2009 | A | PASS |
Forrest France
|
|
|
Items on correction notice have been completed, fire life safety inspection passed.
|
Zoning Approval | 11/20/2009 | 11/20/2009 | 11/20/2009 | | PASS |
Josh Wilson
|
|
|
|
FIRE-Final Inspection | 11/17/2009 | 11/17/2009 | 11/17/2009 | P | FAIL |
Forrest France
|
|
|
See fire code review notes for details on issues to be addressed including smoke alarms-items #21-24, provide knox box-item #3, post fire extinguishers-item #7, manual thumbturns are not allowed-item #8, provide signage at the fire riser room door-#19, post building address per #6. Discussed project related FIR permits and completion schedule.
|
Print Occupancy Form | | | 11/17/2009 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 11/17/2009 | | DONE |
Scott Arellano
|
|
|
Fire plan reviewer revised fire code comments to reflect smoke alarm requirements for R-2 occupancy.
|
PubWorks Occupancy Approval | 10/22/2009 | 10/22/2009 | 10/22/2009 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Energy code compliance | 10/7/2009 | 10/8/2009 | 10/8/2009 | A | PART |
Dave Hannah
|
|
|
see Craig ext walls ok to cover
|
BLD-Framing/Rough-in | 10/5/2009 | 10/6/2009 | 10/7/2009 | A | PART |
Tony Young
|
|
|
craig Phone #: ###-#### need mech 1st,, ok to start insulation on ext walls
|
BLD-Framing/Rough-in | 10/6/2009 | 10/7/2009 | 10/7/2009 | A | PART |
Tony Young
|
|
|
craig Phone #: ###-#### see correction notice,, ok to insulate,, need mech rough pass and elec rough pass on all areas
|
BLD-Framing/Rough-in | 10/6/2009 | 10/6/2009 | 10/6/2009 | P | PART |
Tony Young
|
|
|
craig Phone #: ###-#### need mech,, ok to insulate walls pending mech.. need fire blocks
|
Issue PAID IN FULL permit | | | 8/4/2009 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/4/2009 | | DONE |
|
|
|
|
Telephone call | | | 8/4/2009 | | DONE |
|
|
|
t/c w eileen davidson at ###-#### - permit ready and fees given
|
Print Occupancy Form | | | 8/3/2009 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 6/22/2009 | 6/22/2009 | 7/31/2009 | | PASS |
Dan Stuart
|
|
|
7/31/2009 14:15:29 RMH - activity updated through activity BLDA022 from case BLD09-00972.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/31/2009 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/27/2009 | | 7/31/2009 | | PASS |
Ron Hill
|
|
|
Ron Hill signed off for Dan Stuart. Plumbing was approved and Design review plans were approved 7-31-09
|
Routing - Design Review | 7/30/2009 | | 7/31/2009 | | PASS |
Josh Wilson
|
|
|
Routed plans to Josh W.
|
Routing - PLANNING | 7/30/2009 | | 7/31/2009 | | PASS |
Josh Wilson
|
|
|
PASS Design Review and CUP
|
Plan resubmittals received | | | 7/30/2009 | | |
Tisha Gallop
|
|
|
received Canal Right of Way Encroachment Agreement and License, and two copies of sheet A-1; taken to Ron Hill
|
Routing - PLUMBING | 7/24/2009 | | 7/27/2009 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Plan resubmittals received | | | 7/24/2009 | | |
Dan Stuart
|
|
|
Rec'd one copy of sheets P1.1 & P2.0- Taken to Dan S
|
Routing - PLAN CHECK | 7/24/2009 | | 7/24/2009 | | PEND |
Dan Stuart
|
|
|
Recieved copies of plumbing plan resubmittals. Call Bill Vandergrift to let him know they were in and put them on his review desk.
|
Routing - Design Review | 7/23/2009 | | 7/23/2009 | | FAIL |
Sarah Schafer
|
|
|
The conditions of approval on DRH09-00130 have not been met. Specifically an additional tree needs to be added to the south side of Jefferson Street and a copy of the approval from the Boise Canal Company needs to be received prior to DR sign-off. I contacted Eileen Davidson at ###-#### with this information. Once the approval from the canal company is received she will send it to Josh Wilson so he can sign off with the revised A-1 sheet showing the landscape.
|
Routing - PLANNING | 7/23/2009 | | 7/23/2009 | | PASS |
Susan Riggs
|
|
|
Sent on to Sara S. to review for DR
|
Routing - PLAN CHECK | 7/17/2009 | | 7/22/2009 | | PASS |
Dan Stuart
|
|
|
Routing to Planning & Plumbing.
|
Plan resubmittals received | | | 7/21/2009 | | |
Dan Stuart
|
|
|
Rec'd transmittal letter, three copies of sheets EN0.0, M0.2, M1.0; four copies of C1 and C2; two copies of sheets A-1, A-2, A-3, A-4, A-5. Taken to Dan S.
|
Route to Impact Fee Review | 7/9/2009 | 7/14/2009 | 7/20/2009 | | PASS |
Cindy M. Gould
|
|
|
Homeless shelter is exempt from impact fees
|
Routing - PLUMBING | 7/15/2009 | | 7/17/2009 | | FAIL |
Bill VanDegrift
|
|
|
no resubmittals
|
Routing - PLANNING | 7/14/2009 | | 7/15/2009 | | FAIL |
Josh Wilson
|
|
|
Written approval from Boise City Canal Co. for improvements within easement required prior to sign off on building permit. CUP appeal period in effect unitl 7/16/09 and DR appeal period in effect until 7/19/09.
|
Routing - PLAN CHECK | 7/13/2009 | | 7/14/2009 | | FAIL |
Dan Stuart
|
|
|
Plans picked up and re-routed back to PW, Planning & Plumbing.
|
Routing - PUBLIC WORKS | 7/14/2009 | | 7/14/2009 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Drainage | 7/14/2009 | | 7/14/2009 | | PASS |
Terry Records
|
|
|
|
Routing - FIRE | 7/9/2009 | 7/9/2009 | 7/13/2009 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 7/13/2009 | | FAIL |
|
|
|
Failed Public Works, Plumbing, Planning, Plan Check
|
Routing - PLAN CHECK | 7/8/2009 | | 7/9/2009 | | FAIL |
Dan Stuart
|
|
|
FAXED COPY TO ARCHITECT. ROUTING TO FIRE CODE ANALYST.
|
Routing - Erosion and Sediment | 7/7/2009 | | 7/8/2009 | | PASS |
Clint A Smith
|
|
|
ESC09-00359 plan approved with attached conditions.
|
Routing - PLUMBING | 6/30/2009 | | 7/7/2009 | | FAIL |
Bill VanDegrift
|
|
|
both cold water branches are undersized. resize and resubmit.
|
Routing - PLANNING | 6/30/2009 | | 6/30/2009 | | FAIL |
Susan Riggs
|
|
|
DRH Josh Wilson Routed to plumbing.
Plans have not been before the P&Z. Can't sign off.
|
Routing - PUBLIC WORKS | 6/22/2009 | | 6/30/2009 | | FAIL |
Connie Baumgartner
|
|
|
|
Routing PW Solid Waste | 6/30/2009 | | 6/30/2009 | | PASS |
Peter J. McCullough
|
|
|
alley collection
|
Routing PW Sewer Design | 6/26/2009 | | 6/30/2009 | | PASS |
Jon R. Gunnerson
|
|
|
Existing sanitary sewer service located in alley.
|
Plan resubmittals received | | | 6/26/2009 | | |
|
|
|
Resubmitted plan sheets (1) A1 Sheets / (2) Drainage sheets / (5) C1 Sheets.
|
Routing PW Street Lights | 6/24/2009 | | 6/25/2009 | | PASS |
Hank Alarcon
|
|
|
Have called architect and advise them that Historical street lighting plan will need to be submitted for review.
|
Routing PW Sewer Rating | 6/24/2009 | | 6/24/2009 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Drainage | 6/23/2009 | | 6/24/2009 | | FAIL |
Brian Murphy
|
|
|
Drainage plan failed. Talked to Scott Stanfield 6/23/09
|
Routing - Addressing | 6/22/2009 | | 6/22/2009 | | PASS |
April Wing
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/19/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/19/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
First Notice | | 12/3/2009 | | | |
|
|
|
|
First Notice | | 12/3/2009 | | | |
|
|
|
|
Application received | | 6/19/2009 | | | |
|
|
|
|
Pending Assignment by JCB | 6/19/2009 | | | | DONE |
Dan Stuart
|
|
|
|