Information based on query as of Friday, July 19, 2024.
Permit Information
Permit NumberBLD09-00972
StatusFinaled
Name SHELTON T ENSLEY
Site Address 1417 W JEFFERSON ST
Project NameCity Lights
Customer Number 
ePlanReviewNo
Description
(Woman's Dormitory Shelter - Boise Rescue Mission) To remodel an existing 4,452 sq. ft. enclosed parking garage, below existing apartments, for use as a 60 bed Dormitory Shelter for woman and children, with support facilities and administration offices. Work includes fur out of interior of exterior walls and insulating them, interior finishes, new store front door & window assemblies to infill existing garage door openings; an accessible unisex restroom and additional water closets, lavs and showers; electrical, mechanical, plumbing, fire sprinkler and alarm systems work. Site work on near by lot will provide additional parking to serve this facility. There are no food preparation kitchen areas scoped in this permit. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy UNPAID FEE  11/23/2009 DONE
Details
BLD-Final11/19/200911/20/200911/20/2009PPASS
DetailsTony Young
graig Phone #: ###-####
ok for perm occ
FIRE-Final Inspection11/20/200911/20/200911/20/2009APASS
DetailsForrest France
Items on correction notice have been completed, fire life safety inspection passed.
Zoning Approval11/20/200911/20/200911/20/2009 PASS
DetailsJosh Wilson
FIRE-Final Inspection11/17/200911/17/200911/17/2009PFAIL
DetailsForrest France
See fire code review notes for details on issues to be addressed including smoke alarms-items #21-24, provide knox box-item #3, post fire extinguishers-item #7, manual thumbturns are not allowed-item #8, provide signage at the fire riser room door-#19, post building address per #6. Discussed project related FIR permits and completion schedule.
Print Occupancy Form  11/17/2009 DONE
Plan Reviewer's activity  11/17/2009 DONE
DetailsScott Arellano
Fire plan reviewer revised fire code comments to reflect smoke alarm requirements for R-2 occupancy.
PubWorks Occupancy Approval10/22/200910/22/200910/22/2009 DONE
DetailsTiffany Lowery
BLD-Energy code compliance10/7/200910/8/200910/8/2009APART
DetailsDave Hannah
see Craig ext walls ok to cover
BLD-Framing/Rough-in10/5/200910/6/200910/7/2009APART
DetailsTony Young
craig Phone #: ###-####
need mech 1st,, ok to start insulation on ext walls
BLD-Framing/Rough-in10/6/200910/7/200910/7/2009APART
DetailsTony Young
craig Phone #: ###-####
see correction notice,, ok to insulate,, need mech rough pass and elec rough pass on all areas
BLD-Framing/Rough-in10/6/200910/6/200910/6/2009PPART
DetailsTony Young
craig Phone #: ###-####
need mech,, ok to insulate walls pending mech.. need fire blocks
Issue PAID IN FULL permit  8/4/2009 DONE
Permit Ready to Issue  8/4/2009 DONE
Details
Telephone call  8/4/2009 DONE
Details
t/c w eileen davidson at ###-#### - permit ready and fees given
Print Occupancy Form  8/3/2009 DONE
Details
Plan assigned to (DRS)6/22/20096/22/20097/31/2009 PASS
DetailsDan Stuart
7/31/2009 14:15:29 RMH - activity updated through activity BLDA022 from case BLD09-00972.
PLANS/APPL TAKEN TO FRONT DESK  7/31/2009 DONE
Routing - PLAN CHECK7/27/2009 7/31/2009 PASS
DetailsRon Hill
Ron Hill signed off for Dan Stuart. Plumbing was approved and Design review plans were approved 7-31-09
Routing - Design Review7/30/2009 7/31/2009 PASS
DetailsJosh Wilson
Routed plans to Josh W.
Routing - PLANNING7/30/2009 7/31/2009 PASS
DetailsJosh Wilson
PASS Design Review and CUP
Plan resubmittals received  7/30/2009  
DetailsTisha Gallop
received Canal Right of Way Encroachment Agreement and License, and two copies of sheet A-1; taken to Ron Hill
Routing - PLUMBING7/24/2009 7/27/2009 PASS
DetailsBill VanDegrift
per plans and 2003 upc
Plan resubmittals received  7/24/2009  
DetailsDan Stuart
Rec'd one copy of sheets P1.1 & P2.0- Taken to Dan S
Routing - PLAN CHECK7/24/2009 7/24/2009 PEND
DetailsDan Stuart
Recieved copies of plumbing plan resubmittals. Call Bill Vandergrift to let him know they were in and put them on his review desk.
Routing - Design Review7/23/2009 7/23/2009 FAIL
DetailsSarah Schafer
The conditions of approval on DRH09-00130 have not been met. Specifically an additional tree needs to be added to the south side of Jefferson Street and a copy of the approval from the Boise Canal Company needs to be received prior to DR sign-off. I contacted Eileen Davidson at ###-#### with this information. Once the approval from the canal company is received she will send it to Josh Wilson so he can sign off with the revised A-1 sheet showing the landscape.
Routing - PLANNING7/23/2009 7/23/2009 PASS
DetailsSusan Riggs
Sent on to Sara S. to review for DR
Routing - PLAN CHECK7/17/2009 7/22/2009 PASS
DetailsDan Stuart
Routing to Planning & Plumbing.
Plan resubmittals received  7/21/2009  
DetailsDan Stuart
Rec'd transmittal letter, three copies of sheets EN0.0, M0.2, M1.0; four copies of C1 and C2; two copies of sheets A-1, A-2, A-3, A-4, A-5. Taken to Dan S.
Route to Impact Fee Review7/9/20097/14/20097/20/2009 PASS
DetailsCindy M. Gould
Homeless shelter is exempt from impact fees
Routing - PLUMBING7/15/2009 7/17/2009 FAIL
DetailsBill VanDegrift
no resubmittals
Routing - PLANNING7/14/2009 7/15/2009 FAIL
DetailsJosh Wilson
Written approval from Boise City Canal Co. for improvements within easement required prior to sign off on building permit. CUP appeal period in effect unitl 7/16/09 and DR appeal period in effect until 7/19/09.
Routing - PLAN CHECK7/13/2009 7/14/2009 FAIL
DetailsDan Stuart
Plans picked up and re-routed back to PW, Planning & Plumbing.
Routing - PUBLIC WORKS7/14/2009 7/14/2009 PASS
DetailsBeverly Hall
Routing PW Drainage7/14/2009 7/14/2009 PASS
DetailsTerry Records
Routing - FIRE7/9/20097/9/20097/13/2009 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  7/13/2009 FAIL
Failed Public Works, Plumbing, Planning, Plan Check
Routing - PLAN CHECK7/8/2009 7/9/2009 FAIL
DetailsDan Stuart
FAXED COPY TO ARCHITECT. ROUTING TO FIRE CODE ANALYST.
Routing - Erosion and Sediment7/7/2009 7/8/2009 PASS
DetailsClint A Smith
ESC09-00359 plan approved with attached conditions.
Routing - PLUMBING6/30/2009 7/7/2009 FAIL
DetailsBill VanDegrift
both cold water branches are undersized. resize and resubmit.
Routing - PLANNING6/30/2009 6/30/2009 FAIL
DetailsSusan Riggs
DRH Josh Wilson Routed to plumbing.

Plans have not been before the P&Z. Can't sign off.
Routing - PUBLIC WORKS6/22/2009 6/30/2009 FAIL
DetailsConnie Baumgartner
Routing PW Solid Waste6/30/2009 6/30/2009 PASS
DetailsPeter J. McCullough
alley collection
Routing PW Sewer Design6/26/2009 6/30/2009 PASS
DetailsJon R. Gunnerson
Existing sanitary sewer service located in alley.
Plan resubmittals received  6/26/2009  
Resubmitted plan sheets (1) A1 Sheets / (2) Drainage sheets / (5) C1 Sheets.
Routing PW Street Lights6/24/2009 6/25/2009 PASS
DetailsHank Alarcon
Have called architect and advise them that Historical street lighting plan will need to be submitted for review.
Routing PW Sewer Rating6/24/2009 6/24/2009 PASS
DetailsConnie Baumgartner
Routing PW Drainage6/23/2009 6/24/2009 FAIL
DetailsBrian Murphy
Drainage plan failed. Talked to Scott Stanfield 6/23/09
Routing - Addressing6/22/2009 6/22/2009 PASS
DetailsApril Wing
Plans ACCEPTED BY PLAN TECH  6/19/2009 DONE
DetailsAlexandra L. DeYoung
Recd Pcfee & Taken To Pln CK  6/19/2009 DONE
DetailsAlexandra L. DeYoung
First Notice 12/3/2009   
First Notice 12/3/2009   
Application received 6/19/2009   
Pending Assignment by JCB6/19/2009   DONE
DetailsDan Stuart