Permit Information
Permit NumberBLD09-00981
StatusExpired
Name EVERGREEN HOMES INC
Site Address 6595 W USTICK RD
Project Name 
Customer Number 
ePlanReviewNo
Description
(Aprodite's Garden)This permit is for the construction of a new stucco fence to create an enclosed court for outdoor events. The patio area is not covered. There is a section at the south end of the patio that is covered by open lattice. Per the letter on file the inside assembly area and the outside patio will not be occupied at the same time allowing for no increase in occupant load. If in the future events are held simultaneously the occupant load will need to be adjusted with a new code analysis completed and any non-compliant items brought up to code. The grading and drainage is only for the patio arrea. CDM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  1/24/2011 DONE
DetailsSam Zahorka
BLD-Conference11/23/201011/24/201011/24/2010APASS
DetailsTom Arcoraci
tenant has moved out
DOC - Permit Expired11/24/201011/24/201011/24/2010PPASS
DetailsTom Arcoraci
tenant has moved out
BLD-Conference11/1/201011/16/201011/16/2010AFAIL
DetailsTom Arcoraci
tenant has moved out
BLD-Conference10/4/201011/1/201011/1/2010ANH
DetailsTom Arcoraci
Barb Phone #: ###-####-PLease inform status of occupancy no activity
Telephone call  10/4/2010 DONE
DetailsBarbara Stitt
Spoke with Paul @###-#### on 10-4-10 requesting a letter stating they are selling business and to close all permits. They need to pay bench sewer fees and get zoning sign off. I will set up for Tom A to have another inspection for 11-1-10 per his (Tom's request)
BLD-Aging Inspection9/1/20109/1/20109/1/2010 NR
DetailsTom Arcoraci
needs zoning and public works sign offs
BLD-Aging Inspection6/28/20106/28/20106/28/2010 PART
DetailsTom Arcoraci
Print Occupancy Form  6/10/2010 DONE
FIRE-Final Inspection4/23/20104/26/20104/26/2010PPASS
DetailsForrest France
Corrections per last inspection are finished with the exception of a max occupant load sign to be posted prior to structural final approval as discussed.
FIRE-Final Inspection3/11/20103/12/20103/12/2010PFAIL
DetailsTroy Cobbley
Provide occupant load sign and approved single action hardware on the south exit gate. Per Paul the exit gates shown on the plans at the north end of the wall will not be installed. Per the plan reviewer resubmitted plans are not required.
BLD-Aging Inspection2/18/20102/18/20102/18/2010 FAIL
DetailsTom Arcoraci
needs zoning and fire sign off
BLD-Aging Inspection12/15/200912/15/200912/15/2009 PEND
DetailsTom Arcoraci
BLD-Conference10/15/200910/15/200910/15/2009PPASS
DetailsTom Arcoraci
wip ok
BLD-Aging Inspection10/15/200910/15/200910/15/2009 PASS
DetailsTom Arcoraci
BLD-Framing/Rough-in7/13/20097/13/20097/13/2009PPASS
DetailsTom Arcoraci
Paul Phone #: ###-####
Plan assigned to (CDM)6/22/20096/22/20097/10/2009 PASS
DetailsCarl D Madsen
7/10/2009 11:38:37 CDM - activity updated through activity BLDA022 from case BLD09-00981.
Permit Ready to Issue  7/10/2009 DONE
DetailsTisha Gallop
CHANGE STATUS TO (ISS)  7/10/2009 DONE
DetailsTisha Gallop
Case Summary (BLD)  7/10/2009 DONE
PLANS/APPL TAKEN TO FRONT DESK  7/10/2009  
Routing - PLANNING7/10/2009 7/10/2009 PASS
DetailsAndrea Tuning
The applicant has completed all of the requirements of the associated DR (DRH09-00089). The applicant is allowed to occupy the building for up to 3 events through August 31, 2009. After August 31, 2009 (CZC09-00136), the applicant will be required to have ALL of the improvements completed or a bond posted for those improvements or the operation of the outdoor patio must cease immediately. ANY 7-10-09
Routing - PLAN CHECK7/10/2009 7/10/2009 PASS
DetailsCarl D Madsen
Inspection Record Card- Bld  7/10/2009 DONE
Details
Issue PAID IN FULL permit  7/10/2009 DONE
DetailsTisha Gallop
Routing PW Drainage7/8/2009 7/9/2009 PASS
DetailsBrian Murphy
Plan resubmittals received  7/9/2009  
DetailsTisha Gallop
Received two copies of response letter, one copy of Shallow Injection Well form, three copies of small site plan, five copies of sheets C.2, A.4; inserted into plans by architect and plans take back to Brian Murphy per his request.
Routing - PUBLIC WORKS7/9/2009 7/9/2009 PASS
DetailsBeverly Hall
Routing - Erosion and Sediment7/6/2009 7/7/2009 PASS
DetailsSteven Webb
ESC plan waiver approved with attached conditions. ESC09-00366
1st review completed  7/6/2009 FAIL
Routing - PUBLIC WORKS7/2/2009 7/2/2009 FAIL
DetailsBeverly Hall
FAILED DRAINAGE AGAIN.
Routing PW Drainage7/2/2009 7/2/2009 FAIL
DetailsBrian Murphy
STILL SHOWS CURB NOT WHEEL STOPS NEEDS FILTER FABRIC MUST PUT REVISIONS ON ON PERMIT SET ALSO BRIAN MURPHY ###-####
Plan resubmittals received  7/1/2009  
received 3 letters & 3 O & M put with plans and given back to Carl M.
Routing - PUBLIC WORKS6/23/2009 6/26/2009 PASS
DetailsConnie Baumgartner
Routing PW Drainage6/24/2009 6/25/2009 FAIL
DetailsBrian Murphy
ALL PLANS MUST BE STAMPED.DRAINROCK 2 INCH WITH FILTER FABRIC, MANHOLE AND GRATE SPECD AND TRAFFIC RATED, NEW CURB LINE TO EAST CHANGED TO WHEEL STOPS NEW CALCS MTI E MAIL. REDUCED COPY O AND MDRAINAGE PLAN. BRIAN MURPHY ###-####
Routing PW Solid Waste6/25/2009 6/25/2009 PASS
DetailsPeter J. McCullough
Will use 95-gallon carts, to be stored inside building. No dumpster approved.
Routing PW Street Lights6/25/2009 6/25/2009 PASS
Details
Routing - Addressing6/24/2009 6/24/2009 PASS
DetailsApril Wing
Routing - PLANNING Land Div6/23/2009 6/23/2009 PASS
DetailsTodd Tucker
Plans ACCEPTED BY PLAN TECH  6/22/2009 DONE
DetailsAlexandra L. DeYoung
Application received 6/22/2009   
Routing - PLANNING7/7/2009    
DetailsAndrea Tuning
Routing - PLAN CHECK6/26/2009   PASS
DetailsCarl D Madsen
Routing - PUBLIC WORKS7/8/2009    
DetailsBeverly Hall