Second Notice | | 1/15/2010 | 1/29/2010 | | DONE |
|
|
|
|
First Notice | | 11/23/2009 | 1/5/2010 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 11/12/2009 | 11/13/2009 | 11/13/2009 | A | PASS |
Jim Sly
|
|
|
Tim Phone #: ###-#### OK for Perm Occ.
|
Permanent Occupancy | | | 11/13/2009 | | DONE |
|
|
|
|
FIRE-Final Inspection | 11/12/2009 | 11/12/2009 | 11/12/2009 | P | PASS |
Forrest France
|
|
|
Life safety inspection completed satisfactory with the exception of missing address numbers to be posted prior to building structural final inspection as agreed.
|
BLD-Energy code compliance | 9/28/2009 | 9/29/2009 | 9/29/2009 | A | PASS |
Jim Storey
|
|
|
tim Phone #: ###-####
|
BLD-Framing/Rough-in | 9/24/2009 | 9/25/2009 | 9/25/2009 | P | PART |
Jim Storey
|
|
|
Tim Phone #: ###-#### ok to insulate/ isolate return air duct.
|
Telephone call | | | 9/16/2009 | | DONE |
|
|
|
Spoke with Pastor Tim Bridgewater and confirmed that the existing partial fire alarm system in a non-required alarm system. The exisitng alarm system shall be maintained as originally installed and be functional; otherwise it shall be removed.
|
BLD-Framing/Rough-in | 8/10/2009 | 8/10/2009 | 8/10/2009 | P | PART |
Jim Storey
|
|
|
Tim Phone #: ###-#### roof framing ok/ sheer nailling ok/ need resbmital to remove adaramp. and use front entrance that is compliant.
|
BLD-Foundation | 7/22/2009 | 7/22/2009 | 7/22/2009 | P | PASS |
Jim Storey
|
|
|
Tim Phone #: ###-####
|
BLD-Footing | 7/20/2009 | 7/21/2009 | 7/21/2009 | A | PASS |
Jim Storey
|
|
|
Tim Phone #: ###-#### pending si for epoxy rebar ok
|
Received Certificate of Value | | | 7/8/2009 | | DONE |
Bethany Sullins
|
|
|
|
Print Occupancy Form | | | 7/8/2009 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 7/8/2009 | | |
|
|
|
|
Telephone call | | | 7/8/2009 | | DONE |
Barbara Stitt
|
|
|
Called Tim Bridwater and told him that permit is ready, fees due, need ACHD information and GC information///7-8-09 @ 1:42pm BAS
|
Issue PAID IN FULL permit | | | 7/8/2009 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 7/6/2009 | | 7/7/2009 | | PASS |
John Menard
|
|
|
|
Routing - PLAN CHECK | 7/7/2009 | | 7/7/2009 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/7/2009 | | DONE |
John Menard
|
|
|
|
Plan assigned to (JCM) | 6/24/2009 | | 7/7/2009 | | PASS |
John Menard
|
|
|
7/7/2009 10:20:10 JCM - activity updated through activity BLDA022 from case BLD09-00996.
|
Routing - PLANNING Land Div | 7/7/2009 | | 7/7/2009 | | PASS |
Todd Tucker
|
|
|
|
Routing - FIRE | 6/30/2009 | 6/30/2009 | 7/6/2009 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 7/6/2009 | | PASS |
Scott Arellano
|
|
|
|
Route to Impact Fee Review | 6/30/2009 | 7/6/2009 | 7/1/2009 | | PASS |
Donna Wolf
|
|
|
|
Routing - PLAN CHECK | 6/26/2009 | | 6/30/2009 | | PASS |
John Menard
|
|
|
John Menard
|
Routing - PLUMBING | 6/25/2009 | | 6/26/2009 | | PASS |
Bill VanDegrift
|
|
|
no plan no review
|
Routing - PLANNING | 6/26/2009 | | 6/26/2009 | | PASS |
Joshua Johnson
|
|
|
CUP09-00033-Josh Johnson
|
Routing PW Solid Waste | 6/25/2009 | | 6/25/2009 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Sewer Design | 6/24/2009 | | 6/25/2009 | | PASS |
Jon R. Gunnerson
|
|
|
No changes to public sewer.
|
Routing - PUBLIC WORKS | 6/24/2009 | | 6/25/2009 | | PASS |
Beverly Hall
|
|
|
|
Routing - Erosion and Sediment | 6/25/2009 | | 6/25/2009 | | PASS |
Steven Webb
|
|
|
ESC plan waiver approved with attached conditions. ESC09-00379
|
Application received | | 6/23/2009 | 6/24/2009 | | DONE |
Darla L Downs
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/24/2009 | | DONE |
Darla L Downs
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/24/2009 | | DONE |
Darla L Downs
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 6/24/2009 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Addressing | 6/24/2009 | | 6/24/2009 | | PASS |
April Wing
|
|
|
|
Routing PW Drainage | 6/24/2009 | | 6/24/2009 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Rating | 6/24/2009 | | 6/24/2009 | | PASS |
Connie Baumgartner
|
|
|
|