Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD09-01007
StatusFinaled
Name CONTRACTORS NORTHWEST
Site Address 130 N MILWAUKEE ST
Project NamePetsmart
Customer Number 
ePlanReviewNo
Description
Petsmart - Shell Permit Only - To demolish and remove an existing theater building and construct a new 28,395 square foot, one story, retail building and related site improvements. The building will be constructed of masonry exterior walls with steel structural roof and interior supports. This is a shell permit only and no occupancy is permitted under this permit. A separate tenant improvement permit will be required to finish this building for occupancy. This building will be fully fire sprinkled. The sprinklers are used for area increase. There will be a three-hour fire wall separating the new building from an existing retail building on the north side of the new buildings. This permit is to also construct two wood framed, stone veneer columns, a steel framed roof canopy over the sidewalk and a 2,400 square foot, wood framed roof overbuild at the center of the existing retail building. This work is being done on the front entry (north side) of the existing retail building. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice5/27/20105/27/20106/4/2010 DONE
DetailsMike Jordan
BLD-Final5/26/20105/27/20105/27/2010APASS
DetailsMike Jordan
DOC - Permit Finaled5/27/20105/27/20105/27/2010PPASS
DetailsMike Jordan
All issues were resolved. Certificate of completion was issued.
FIRE-Final Inspection5/7/20105/10/20105/10/2010PPASS
DetailsTroy Cobbley
Life safety passed.
BLD-Final5/7/20105/7/20105/7/2010APART
DetailsMike Jordan
Everything ok, needs to provide final letter from special inspection company and get zoning final prior to finaling this permit.
FIRE-Final Inspection5/6/20105/6/20105/6/2010PPART
DetailsTroy Cobbley
A temporary occupancy was given with Scott and Marks approval until the fire alarm permit for the new tamper switch on the anti-freeze loop has been finaled. The work has been scheduled for monday morning at 8:00am.
FIRE-Final Inspection5/3/20105/4/20105/4/2010PFAIL
DetailsTroy Cobbley
The project related simplexgrinnell fire alarm permit needs to be finaled and signage/curb painting at the rear fire dept. hammerhead turnaround needs to be provided.
Zoning Approval5/4/20105/4/20105/4/2010 PASS
DetailsJosh Wilson
PubWorks Occupancy Approval3/30/20103/30/20103/30/2010 DONE
DetailsTiffany Lowery
BLD-Energy code compliance3/2/20103/2/20103/2/2010APASS
DetailsMike Jordan
BLD-Framing/Rough-in2/5/20102/5/20102/5/2010PPASS
DetailsMike Jordan
Rod Phone #: ###-####Visually inspected the remaing straps that were added to the overbuild at existing strip mall. work done as per approved plan.
BLD-Framing/Rough-in1/26/20101/27/20101/27/2010APASS
DetailsMike Jordan
Rodney Phone #: ###-####. Reveiwed special insp. reports. Also inspected engineering fix on 2 columns at existing strip mall. Noted that epoxy had special insp. All work done in accordance to engineers RFI. Will have detail scanned into permit.
BLD-Framing/Rough-in1/19/20101/20/20101/20/2010PPASS
DetailsMike Jordan
Rod Phone #: ###-####. Steel stud framing for 2nd. pair of exterior columns on east side of new bldg. Also partial inspection on new wood framed store front canopy and columns on existing strip mall.
BLD-Framing/Rough-in1/8/20101/11/20101/11/2010APASS
DetailsMike Jordan
Rod Phone #: ###-####. Steel stud framed walls and screw patterns for shear wall attachments for southwest and northeast overbuilds on new petsmart bldg. Also waiting for copy of RFI from engineer noting the deletion of the bracing at the 14ft. elev. and noting the bracing at 12ft. elev. will be sufficient on the two steel stud columns on east side of petsmart bldg. Also need copy of comm. check for envelope compliance.
BLD-Footing1/7/20101/8/20101/8/2010APART
DetailsMike Jordan
rod//request early as possible Phone #: ###-####. Exterior column pad footings for new canopy at existing retail shops. Will have special insp.
BLD-Framing/Rough-in1/7/20101/7/20101/7/2010PPASS
DetailsMike Jordan
Exterior shear, 2x6 drags in place, All hardware has been installed for overbuild at existing reatil stores.
BLD-Framing/Rough-in1/6/20101/7/20101/7/2010ACANC
DetailsMike Jordan
Rod Phone #: ###-####
BLD-Framing/Rough-in1/5/20101/6/20101/6/2010PPART
DetailsMike Jordan
Interior shear walls for roof overbuild at existing retail stores.
BLD-Framing/Rough-in1/5/20101/6/20101/5/2010PCANC
DetailsMike Jordan
Rod Phone #: ###-####
BLD-Framing/Rough-in12/29/200912/30/200912/30/2009AFAIL
DetailsMike Jordan
Rod Phone #: ###-####. Needs to add additional bracing at 14ft. elev. as shown on approved plans at northeast and southeast steel stud columns. contractor to repair and recall inspection.
BLD-Footing11/19/200911/19/200911/19/2009PPASS
DetailsMike Jordan
Rod Phone #: ###-####. loading dock walls ok.
BLD-Footing11/12/200911/13/200911/13/2009PDEFR
DetailsMike Jordan
rod Phone #: ###-####. Specil inspection on site.
BLD-Footing11/5/200911/6/200911/6/2009APASS
DetailsMike Jordan
rod - first thing in the morning please Phone #: ###-#### Special inspector was on site.
BLD-Footing11/2/200911/2/200911/2/2009PPASS
DetailsTom Arcoraci
rod Phone #: ###-####
BLD-Footing10/29/200910/30/200910/30/2009APART
DetailsMike Jordan
rod Phone #: ###-####. wip on interiorior column pad footings.
BLD-Footing10/27/200910/28/200910/28/2009APART
DetailsMike Jordan
rod Phone #: ###-####. South parkinglot has been swept. southeast, west and south perimeter stemwalls. wip. Will have special insp.
BLD-Foundation10/23/200910/26/200910/26/2009PPART
DetailsMike Jordan
Rod Phone #: ###-####. Inspected southwest footing from sw corner to loading dock. Also west footing line. wip on masonry wall 0 to 4ft. elev. at north wall at existing stripmall. Will have special insp.
BLD-Footing10/22/200910/23/200910/23/2009APART
DetailsMike Jordan
rod - rebar Phone #: ###-####East perimeter stemwall. Will have special insp. Also reviewed all special inspection reports to date. No outstanding issues were noted.
BLD-Footing10/20/200910/21/200910/21/2009APART
DetailsMike Jordan
rod Phone #: ###-####. Wip on installing vertical reinforcement. North stemwall along existing stripmall. West footing. Will have special insp.
BLD-Footing10/15/200910/16/200910/16/2009PPART
DetailsMike Jordan
Rod Phone #: ###-####. North footing along existing stripmall. Contractor will have special inspection.
Issue PAID IN FULL permit  9/3/2009 DONE
Plan assigned to (JCM)6/25/2009 9/2/2009 PASS
DetailsJohn Menard
9/2/2009 09:56:27 JCM - activity updated through activity BLDA022 from case BLD09-01007.
Routing - PLAN CHECK9/1/2009 9/2/2009 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  9/2/2009 DONE
DetailsJohn Menard
Inspection Record Card- Bld  9/2/2009 DONE
Permit Ready to Issue  9/2/2009 DONE
Telephone call  9/2/2009 DONE
cALLED LEFT MESSAGE FOR ANDY PERMIT READY AND FEE GIVEN ALSO NEED GC # AND ACHD
Routing - FIRE9/1/2009 9/1/2009 PASS
DetailsScott Arellano
Attached updated comments to plans.
Routing - PLAN CHECK8/25/2009 8/31/2009  
DetailsJohn Menard
Plan Reviewer's activity  8/26/2009 PASS
DetailsJohn Menard
Reviewed and approved structural and nonstructural revisions. JCM
Routing - FIRE8/19/20098/19/20098/25/2009 FAIL
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  8/25/2009 FAIL
Failed Public Works, Structural, Plumbing, Fire
Plan resubmittals received  8/25/2009  
DetailsTisha Gallop
received transmittal, response letter, revised application (scanned into documents), 2 copies of plan sheets a0.01, a0.11, a1.11, a1.21, a2.41, a4.21, a4.23, a6.11, three copies of structural calculations and plan sheets S0.01, S1.01A, S1.02A, S4.01, S6.02, S7.04; inserted into plans by arch. rep. and taken back to John Menard
Route to Impact Fee Review8/19/20098/24/20098/20/2009 PASS
DetailsCindy M. Gould
New building replaces the demo no new square footage
Routing Off Site - STRUCTURAL8/12/2009 8/20/2009 FAIL
DetailsJohn Menard
received comment list from consulting structural engineer requesting additional revisions. JCM
Plan resubmittals requested  8/20/2009 DONE
DetailsJohn Menard
E-mailed the achitect a copy of the second structural review requesting revisions. JCM
Plan resubmittals requested  8/19/2009 DONE
DetailsJohn Menard
E-mailed the architect a copy of the plan review requesting revisions. JCM
Routing - PLAN CHECK8/14/2009 8/19/2009 FAIL
DetailsJohn Menard
Plan resubmittals received  8/14/2009  
DetailsTisha Gallop
received 5 copies of page C1.00; inserted by engineer and taken back to Brian Murphy per his request
Routing PW Drainage8/14/2009 8/14/2009 PASS
DetailsBrian Murphy
Routing - PUBLIC WORKS8/11/2009 8/14/2009 PASS
DetailsBeverly Hall
Plan resubmittals requested  8/12/2009 DONE
DetailsJohn Menard
Emailed the architect a request for the revised structural calculations that were not submitted with the revised strucural plans. JCM
Plan resubmittals received  8/12/2009 DONE
received 3 calc books taken to John M.
Routing - PLAN CHECK7/7/2009 8/11/2009  
DetailsJohn Menard
John Menard
Plan resubmittals received  7/27/2009 DONE
received 3 plan review comments, and 3 copies of sheets S0.01,S1.01A,S1.01B,S102A,S1.02B,S4.01,S6.01,S7.01,S7.03 taken to John M.inserted by Ashley from Ersted Arch.
Plan resubmittals requested  7/15/2009 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural review requesting revisions. JCM
Routing Off Site - STRUCTURAL6/26/2009 7/15/2009 FAIL
DetailsJohn Menard
Called Action Courier for pick up///6-26-09 @ 9:30am BAS - Received comment list from consulting structural engineer requesting revisions. JCM
Routing - PLUMBING6/30/2009 7/7/2009 PASS
DetailsBill VanDegrift
Bill VanDeGrift per plans and 2003 upc
Routing - PLANNING7/7/2009 7/7/2009 PASS
DetailsJosh Wilson
DRH09-00026-Josh Wilson
Routing - Erosion and Sediment6/29/2009 6/30/2009 PASS
DetailsSteven Webb
ESC plan approved with attached conditions. ESC09-00377
Routing PW Solid Waste6/29/2009 6/29/2009 PASS
DetailsPeter J. McCullough
Routing PW Drainage6/29/2009 6/29/2009 FAIL
DetailsTerry Records
No drainage report submitted with plans
Routing PW Sewer Rating6/29/2009 6/29/2009 PASS
DetailsConnie Baumgartner
Routing - PUBLIC WORKS6/26/2009 6/29/2009 FAIL
DetailsConnie Baumgartner
Connie Baumgartner
Routing - PLANNING Land Div6/25/2009 6/26/2009 PASS
DetailsTodd Tucker
Routing - Addressing6/26/2009 6/26/2009 PASS
DetailsApril Wing
Pending Assignment by JCM6/25/2009 6/25/2009 BLDA
DetailsJohn Menard
6/25/2009 15:41:04 JCM - activity updated through activity BLDA166 from case BLD09-01007.
Application received 6/24/20096/24/2009 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  6/24/2009 DONE
Recd Pcfee & Taken To Pln CK  6/24/2009 DONE
DetailsBarbara Stitt