Information based on query as of Friday, July 5, 2024.
Permit Information
Permit NumberBLD09-01008
StatusFinaled
Name VERTICAL CONSTRUCTION
Site Address 120 N MILWAUKEE AVE
Project NameSprint
Customer Number 
ePlanReviewNo
Description
(Sprint Tenant Improvement) - To relocate the existing back storage and Information technology rooms from the South side of the property to the West side, requiring partial demolition through the existing adjacent North/South hallway and retail space. Access to the East/West hallway will be closed off to allow more leasable square footage to the future tenant. The existing mechanical units and roof drains will also be relocated in preparation for the future demolition of the existing theatre. Work to include: Demolition of some existing walls, doors, existing roof hatch and ladder. Construct new interior wood stud, sheetrock non bearing walls for the relocated storage and I.T. rooms, infill and patch wall openings to match existing, install relocated roof hatch, add new ladder, relocate existing storage rack system, relocate existing office furniture, cabinetry, safe, electrical box, shelving, and all other work per the approved plans. Existing theatre wall demolition is not part of this permit and will be completed at a later date with a separate permit. ALL OF THE FIRE-RESISTIVE CONSTRUCTION SHALL BE MAINTAINED OR REPAIRED TO BE IN COMPLIANCE WITH CODE THAT ABUT THIS TENANT SPACE AS A CONDITION OF THIS PERMIT. This building is fully Fire Sprinklered. Any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 as regulated by the Boise City Fire Department. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  1/11/2010 DONE
DetailsTisha Gallop
called and left vm in general mailbox need someone to call me regarding FV for mechanical per mech. contractor says was less than what GC reported.
Third Notice 10/9/200910/26/2009 DONE
faxed
Second Notice 9/15/20099/29/2009 DONE
First Notice9/9/20099/9/20099/15/2009 DONE
DetailsMike Jordan
BLD-Final9/9/20099/9/20099/9/2009PPASS
DetailsMike Jordan
Dave Phone #: ###-####
DOC - Permit Finaled9/9/20099/9/20099/9/2009PPASS
DetailsMike Jordan
Letter of compliance was issued.
BLD-Final8/21/20098/21/20098/21/2009PNR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/21/2009 at 9:14:18 AM. Contact: ###-####. All doors and hardware not installed.
FIRE-Final Inspection8/20/20098/20/20098/21/2009PPASS
DetailsTroy Cobbley
Life safety passed
BLD-Framing/Rough-in8/14/20098/14/20098/14/2009PPASS
DetailsMike Jordan
dave Phone #: ###-####. Ceiling grid ok.
BLD-Framing/Rough-in7/27/20097/28/20097/28/2009APASS
DetailsMike Jordan
dave Phone #: ###-####
Issue PAID IN FULL permit  7/7/2009 DONE
CHANGE ISSUED DATE  7/6/2009 DONE
Issue PAID IN FULL permit  7/6/2009 DONE
CHANGE STATUS TO (RDY)  7/6/2009 DONE
Put back to RDY status as the building project value had changed from 5,200. to 35,450.00 voided check and put fees back in with the corredt amt. 7-6-09 ///DLD
Inspection Record Card- Bld  7/2/2009 DONE
Details
Telephone call  7/2/2009 DONE
Details
left message w kay for andy erstad at ###-#### - permit ready and fees given - also need gc name and rce#
Permit Ready to Issue  7/2/2009 DONE
Details
Plan assigned to (SRZ)6/26/20096/26/20097/1/2009 PASS
DetailsSam Zahorka
7/1/2009 16:14:14 SRZ - activity updated through activity BLDA022 from case BLD09-01008.
Routing - PLAN CHECK6/26/2009 7/1/2009 PASS
DetailsSam Zahorka
Sam Zahorka
Case Summary (BLD)  7/1/2009 DONE
DetailsSam Zahorka
Routing - FIRE  7/1/2009 PASS
DetailsSam Zahorka
Verify in field.
1st review completed  7/1/2009 DONE
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  7/1/2009 DONE
DetailsSam Zahorka
Application received 6/24/20096/24/2009 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  6/24/2009 DONE
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  6/24/2009 DONE
DetailsBarbara Stitt