Permit Information
Permit NumberBLD09-01031
StatusFinaled
Name HIGHMARK CONSTRUCTION
Site Address 724 W SANTA PAULA PL
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is to include the conversion of an existing carport to a 2-car garage, a 487s.f. living space addition to the upper level that is partially over the new garage including 2-deck areas, a sunroom, master suite and sleeping porch. This project due to the large amount of openings on the exterior has had lateral engineering done. R-1A reduced setbacks approved through CVA09-00010 by Josh R Johnson. Due to these reduced setbacks all walls with in 5'-0" of the property line are required to be 1-hour protected and eves are to be protected also. This rated wall work will be mostly in the south deck area. Separate electrical, plumbing, and mechanical and ESC permits are required. ESC plan approved by pep with attached conditions. Separate electrical, plumbing, and mechanical and ESC permits are required. All per the approved plans as marked, REScheck, engineering calculations and Engineer's details along with the plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/12/20104/13/20104/13/2010PPASS
DetailsDave Hannah
lynn Phone #: ###-####
DOC - Permit Finaled4/13/20104/13/20104/13/2010PPASS
DetailsDave Hannah
BLD-Footing4/12/20104/12/20104/12/2010PCANC
DetailsDave Hannah
BLD-Aging Inspection4/12/20104/12/20104/12/2010 PASS
DetailsDave Hannah
BLD-Aging Inspection2/8/20102/8/20102/10/2010 PASS
DetailsDave Hannah
work in progress
BLD-Energy code compliance11/3/200911/3/200911/3/2009PPASS
DetailsDave Hannah
LYNN Phone #: ###-#### ok to cover
BLD-Framing/Rough-in10/29/200910/29/200910/29/2009PPASS
DetailsDave Hannah
Taylor Phone #: ###-#### ok to cover ext and ok to insulate int
BLD-Framing/Rough-in10/2/200910/5/200910/5/2009AFAIL
DetailsDave Hannah
TAYLOR Phone #: ###-#### shear not nailed need engineering on garage front
BLD-Foundation8/10/20098/11/20098/11/2009APASS
DetailsDave Hannah
eric Phone #: ###-####
BLD-Foundation8/7/20098/10/20098/10/2009ACANC
DetailsDave Hannah
John-please call prior to inspection Phone #: ###-####
BLD-Foundation8/5/20098/7/20098/7/2009PCANC
DetailsDave Hannah
John-please call prior to inspection Phone #: ###-#### rained out
BLD-Footing7/31/20098/3/20098/3/2009PPASS
DetailsDave Hannah
taylor-inspection notes are hanging on the window Phone #: ###-####
Permit Ready to Issue  7/14/2009 DONE
DetailsTisha Gallop
Telephone call  7/14/2009 DONE
DetailsTisha Gallop
called Highmark Const. and told him permit ready, fees, and need RP
Issue PAID IN FULL permit  7/14/2009 DONE
DetailsTisha Gallop
Plan assigned to (PEP)6/26/20096/26/20097/13/2009 PASS
DetailsPerry Paine
7/13/2009 17:48:24 PEP - activity updated through activity BLDA022 from case BLD09-01031.
Routing Walk-In (BLD)6/26/20096/26/20097/13/2009PDONE
DetailsPerry Paine
7/13/2009 17:48:24 PEP - activity updated through activity BLDA022 from case BLD09-01031.
1st review completed  7/13/2009 DONE
PLANS/APPL TAKEN TO FRONT DESK  7/13/2009 DONE
Routing - PLAN CHECK  7/13/2009 PASS
DetailsPerry Paine
Perry Paine
Routing - Erosion and Sediment  7/13/2009 PASS
DetailsSteven Webb
Steve Webb
Case Summary (BLD)  7/7/2009  
Inspection Record Card- Bld  7/7/2009  
Routing - PLANNING6/26/2009 6/26/2009 PASS
DetailsJoshua Johnson
Josh Johnson
Application received 6/25/20096/25/2009 DONE
DetailsBarbara Stitt
Routing Walk-In (PW Hillside)6/25/20096/25/20096/25/2009APASS
DetailsTerry Records
A letter from the applicant's geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling an inspection. Call Terry Records at ###-####.