Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD09-01072
StatusFinaled
Name STETSON HOMES INC
Site Address 2063 S STONYFIELD PL
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 2770 sq. ft one story single family dwelling with a 920 sq. ft. unfinished basement, three bedrooms, two bathrooms and a 541 sq. ft. attached garage. All work to be done per the approved plans, plan review report and any notations. The distance to property lines for fire rated construction id measured from the finishe exterior of the wall to the property line and not from the foundation. All wall bracing shall comply with R602 "Wall Bracing" of the International Residential Code currently adopted by The City of Boise. R-1B zoning zoning, CUP05-00069 and setbacks per Planning. CDM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  2/2/2010  
BLD-Final10/7/200910/7/200910/7/2009PPASS
DetailsMike Jordan
Rustin Phone #: 608-823. Cert. of occ. issued.
DOC - Permit Finaled10/7/200910/7/200910/7/2009PPASS
DetailsMike Jordan
Handrails and egress ladders in window wells have been repaired and installed.
BLD-Final10/5/200910/6/200910/6/2009PFAIL
DetailsMike Jordan
Rustin Phone #: ###-####. Needs to provide egress ladders in window wells, handrail to basement is mounted to low. c/n posted. A seperate will be required to finish the basement.
BLD-Energy code compliance8/31/20098/31/20098/31/2009PPASS
DetailsMike Jordan
Rustin Phone #: ###-####. All framing issues have been corrected.
BLD-Framing/Rough-in8/28/20098/28/20098/28/2009PFAIL
DetailsMike Jordan
Rustin Phone #: ###-####. c/n posted.
BLD-Framing/Rough-in8/26/20098/26/20098/26/2009PNR
DetailsMike Jordan
Rustin Phone #: ###-####. Needs elec ri insp.
BLD-Other7/28/20097/29/20097/29/2009APASS
DetailsMike Jordan
Trey- wall Phone #: ###-####. Stemwalls and basementwalls ok.
BLD-Footing7/24/20097/24/20097/24/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 7/24/2009 at 8:06:26 AM. Contact: ###-####.Footings for house and basement.
Plan assigned to (CDM)7/17/20097/17/20097/17/2009 DONE
DetailsCarl D Madsen
Route to Impact Fee Review6/30/20097/6/20097/17/2009 PASS
DetailsCindy M. Gould
Routing - PLAN CHECK7/6/2009 7/17/2009 PASS
DetailsCarl D Madsen
Case Summary (BLD)  7/17/2009 DONE
1st review completed  7/17/2009 DONE
PLANS/APPL TAKEN TO FRONT DESK  7/17/2009  
Inspection Record Card- Bld  7/17/2009 DONE
Details
Issue PAID IN FULL permit  7/17/2009 DONE
DetailsTisha Gallop
Routing - PUBLIC WORKS7/2/2009 7/6/2009 PASS
DetailsBeverly Hall
Routing - PLANNING7/2/2009 7/2/2009 PASS
DetailsColleen T Carroll
revised site plan submitted
Routing - Addressing6/30/2009 6/30/2009 PASS
DetailsApril Wing
Application received 6/30/2009   
Routing - PLANNING6/30/2009   FAIL
Left message 7-1-09 re: cantilevered wall setback